ML052770145
| ML052770145 | |
| Person / Time | |
|---|---|
| Site: | Millstone, Surry, North Anna |
| Issue date: | 10/03/2005 |
| From: | Funderburk C Dominion, Dominion Nuclear Connecticut, Dominion Resources Services, Virginia Electric & Power Co (VEPCO) |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 05-578, RIS-05-019 | |
| Download: ML052770145 (5) | |
Text
October 3, 2005 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555-0001 P Dominion Serial No.05-578 NL80S:vlh Docket Nos. 50-280/281 50-338/339 50-336/423 License Nos. DPR-32/37/65 N P F-4/7/49 DOMINION NUCLEAR CONNECTICUT, INC. (DNC)
VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
MILLSTONE POWER STATION UNITS 2 AND 3 SURRY POWER STATION UNITS 1 AND 2 NORTH ANNA POWER STATION UNITS 1 AND 2 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS NRC REGULATORY ISSUE
SUMMARY
2005-19 In response to NRC Regulatory Issue Summary 2005-19, enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRCs generic fundamentals examinations (GFEs).
No new commitments are intended by this letter. If you have any questions or require additional information, please contact Mr. John Hayden at (804) 273-2707.
Very truly yours, --
C. L. Funderburk, Director Nuclear Licensing and Operations Support Dominion Resources Services, Inc. for Dominion Nuclear Connecticut, Inc. and Virginia Electric and Power Company Attachments cc:
U. S. Nuclear Regulatory commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St. SW, Suite 23T85 Atlanta, GA 30303-8931
SN 05-578: Response to NRC RIS 2005-1 9 Docket Nos. 50-280/281/338/339/336/423 Page 2 of 5 cc:
U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Mr. R. E. Martin NRC Lead Project Manager - North Anna and Surry U. S. Nuclear Regulatory Commission One White Flint North 11 555 Rockville Pike Rockville, MD 20852 Mr. S. R. Monarque NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11 555 Rockville Pike Rockville, MD 20852 Mr. V. Nerses NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 1 1555 Rockville Pike Rockville, MD 20852 Mr. G. F. Wunder NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11 555 Rockville Pike Rockville, MD 20852 Mr. N. P. Garrett NRC Senior Resident Inspector Surry Power Station Mr. J. T. Reece NRC Senior Resident Inspector North Anna Power Station Mr. S. M. Schneider NRC Senior Resident Inspector Millstone Power Station
Page 3 of 5 SN 05-578 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 06 cy 07 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBEI ESTIMATED CANDIDATES NUMBER OF 10 NRC FORM 536 (8-2005)
U.S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA EXPIRES: 08/31/2008 Estimated burden per res onse to comply with this voluntary information collection reauest: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to Dlan budgets APPROVED BY OMB: NO. 3150-0131 and resources for operator examinations. Send comments re aiding buden estimate to the Records and. FOIA/Privacy Services Branch 9-5 F53). U.S Nuclear Re ulatory Commission. Washlngton, DC 20555000!, or b internel e-mall to in?ocollects@nrc. ov, and to the Desk Officer, Office of lnimnatior and Regulatory Affairs, NE8B-10202, (3150-0131), Office of Management anc Budget, Washington, DC 20503.
If a means used to impose an informatior collection does not display a currently valid OMB control number, the NRC ma) not conduct or sDonsor, and a Derson is not required to respond to. thc PROPOSED NUMBER ESTIMATED NUMBER OF EXAMINATIONS ESTIMATED NUMBER OF EXAMINATIONS LICENSEE-PREPARED NRC-PREPARED I
information collection.
FACILITY NRC REGION CY -
06 CY -
07 CY -
08 cy-1 1
MILLSTONE POWER STATION - UNITS 2 AND 3 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE I
2 2
(Unit 3)
(Unit 2)
PRIMARY DATE ALTERNATE DATE I
PROPOSED NUMBER I CY 06 -
03/12/07 02/ 11 /08 (Unit 3)
(Unit 2) 02/12/07 03/10/08 (Unit 3)
(Unit 2)
NUMBER OF REACTOR OPERATORS l
8 (Unit 3) l 8
(Unit 2)
NUMBER OF SENIOR REACTOR I 2
2 I
I OPERATORS - INSTANT I
NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES I I
NRC FORM 536 (8-2005)
PRINTED ON RECYCLED PAPER
NRC FORM 536 8-2005)
U.S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA IA. PROPOSED EXAMINATION PREPARATION SCHEDULE APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 Estimated burden per res onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. ?his information collection is used to plan budgets and resources for operator examinations. Send comments re ardin burden estimate to the Records and FOINPrivacy Services Branch 9-5 d3).
U.S.
Nuclear Re ulatory Commission, Washington, DC 20555400i. or b internet e-mail to in?ocollects@nrc. ov, and to the Desk Officer, Office of lnkrmation and Regulatory Affairs, NE8B-10202, (3150-0131), Offi?? of Management and Budget, Washington, DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
CY06 I
I PROPOSEDNUMBER I FACILITY SURRY POWER STATION I
ESTIMATED NUMBER OF LICENSEE-PREPARED I
EXAMINATIONS NRC REGION I1 I
ESTIMATED NUMBER OF NRC-PREPARED I
EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE 1
I
]
CY -
06 CY -
07 CY 08 c y m 8
10 10 4
3 4
4 3
3 01/23/06 12/03/07 11/30/09 01/30/06 12/ 10/07 12/07/09 I
1 PROPOSED NUMBER ESTIMATED CANDIDATES NUMBER OF cy 06 cy 07 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBE 13 IC. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE NRC FORM 536 (8-2005)
PRINTED ON RECYCLED PAPER
Page 5 of 5 SN 05-578 IRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 Estimated burden oer resoonse to comdv with this voluntarv informatior 8-2005)
- ACILIN NORTH ANNA POWER STATION OPERATOR LICENSING EXAMINATION DATA NRC REGION 11 collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. this information kollection-is used tophn budget:
and resources for operator examinations. Send comments re ardin burder estimate to the Records and FOlAlPrivacy Services Branch 8-5 d 3 ) U.S Nuclear Re ulatory Commission, Washington, DC 20555-0001, or b iderne e-mall to Inibcollects@nrc. ov, and to the Desk Officer, Office of lnkrmatior and Regulatory Affairs, NE8B-10202. (3150-0131). Office of Management an(
Budget, Washington DC 20503.
If a means used to impose an informatior collection does not display a currently valid OMB control number, the NRC ma!
not conduct or sponsor, and a person is not required to respond to, thf information collection PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS CY 09 -
CY 08 -
CY 07 -
CY 06 -
1 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS ESTIMATED NUMBER OF EXAMINATIONS 1
NRC-PREPARED B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 09 -
CY 08 -
CY 07 -
CY 06 -
12 10 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES I
NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 3
3 I
2 PROPOSED NUMBER 2
I cy 06 cy 07 MARCH I JUNE SEPTEMBE DECEMBER MARCH JUNE SEPTEMBE ESTIMATED PRIMARY DATE I
I I
I I
I 05/29/06 I
06/01/08 I
06/05/06 I
ALTERNATE DATE I
08/04/08 I
C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE NUMBER OF CANDIDATES I I
l5 I NRC FORM 536 (8-2005)