ML052770027
| ML052770027 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 09/29/2005 |
| From: | Ryan Lantz Operations Branch IV |
| To: | Edington R Nebraska Public Power District (NPPD) |
| References | |
| IR-05-302 | |
| Download: ML052770027 (6) | |
See also: IR 05000298/2005302
Text
September 29, 2005
Randall K. Edington, Vice
President-Nuclear and CNO
Nebraska Public Power District
P.O. Box 98
Brownville, NE 68321
SUBJECT:
COOPER NUCLEAR STATION - NRC INITIAL OPERATOR LICENSING
EXAMINATION REPORT 05000298/2005-302
Dear Mr.Eddington:
In a telephone conversation on September 29, 2005, between Messrs. Dave Tune, Operations
Training Superintendent, and Michael Murphy, NRC Chief Examiner, arrangements were made
for the administration of a licensing written retake examination at the Cooper Nuclear Station on
October 21, 2005.
As agreed during the telephone conversation, your staff will prepare and administer the
examination based on the guidelines in Revision 9 of NUREG-1021, Operator Licensing
Examination Standards for Power Reactors. The NRCs regional office will discuss with your
staff any changes that might be necessary before the examination is administered.
Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations, an authorized
representative of the facility licensee shall approve the outline and written examination before
they are submitted to the NRC for review and approval. The examination shall be complete and
ready-to-use. Any delay in receiving the required examination and reference materials, or the
submittal of inadequate or incomplete materials, may cause the examination
to be rescheduled.
In order to conduct the requested written examination, it will be necessary for your staff to
provide adequate space and accommodations in accordance with ES-402.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be
in effect while the written examination is being administered.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget, approval number 3150-0018, which expires on June 30, 2006.
The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />
per response, including the time for reviewing instructions, gathering and maintaining the data
needed, writing the examinations, and completing and reviewing the collection of information.
Nebraska Public Power District
-2-
Send comments on any aspect of this collection of information, including suggestions for
reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-001, or by Internet electronic mail at
BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs,
NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, its
enclosures, and your response will be available electronically for public inspection in the NRC
Public Document Room or from the Publicly Available Record (PARS) component of the NRCs
document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. M. Barton has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Mr. Michael Murphy at 817-860-8152,
or myself at 817-860-8159.
Sincerely,
/RA/
R. E. Lantz, Chief
Operations Branch
Division of Reactor Safety
Docket: 50-298
License: DPR-46
cc:
Clay C. Warren, Vice President of
Strategic Programs
Nebraska Public Power District
1414 15th Street
Columbus, NE 68601
John R. McPhail, General Counsel
Nebraska Public Power District
P.O. Box 499
Columbus, NE 68602-0499
P. V. Fleming, Licensing Manager
Nebraska Public Power District
P.O. Box 98
Brownville, NE 68321
Nebraska Public Power District
-3-
Michael J. Linder, Director
Nebraska Department of
Environmental Quality
P.O. Box 98922
Lincoln, NE 68509-8922
Chairman
Nemaha County Board of Commissioners
Nemaha County Courthouse
1824 N Street
Auburn, NE 68305
Sue Semerena, Section Administrator
Nebraska Health and Human Services System
Division of Public Health Assurance
Consumer Services Section
301 Centennial Mall, South
P.O. Box 95007
Lincoln, NE 68509-5007
Ronald A. Kucera, Deputy Director
for Public Policy
Department of Natural Resources
P.O. Box 176
Jefferson City, MO 65101
Jerry Uhlmann, Director
State Emergency Management Agency
P.O. Box 116
Jefferson City, MO 65102-0116
Chief, Radiation and Asbestos
Control Section
Kansas Department of Health
and Environment
Bureau of Air and Radiation
1000 SW Jackson, Suite 310
Topeka, KS 66612-1366
Daniel K. McGhee
Bureau of Radiological Health
Iowa Department of Public Health
401 SW 7th Street, Suite D
Des Moines, IA 50309
Nebraska Public Power District
-4-
William J. Fehrman, President
and Chief Executive Officer
Nebraska Public Power District
1414 15th Street
Columbus, NE 68601
Jerry C. Roberts, Director of
Nuclear Safety Assurance
Nebraska Public Power District
P.O. Box 98
Brownville, NE 68321
Nebraska Public Power District
-5-
Electronic distribution by RIV:
Regional Administrator (BSM1)
DRP Director (ATH)
DRS Director (DDC)
DRS Deputy Director (vacant)
Senior Resident Inspector (SDC)
Branch Chief, DRP/C (KMK)
Senior Project Engineer, DRP/C (WCW)
Team Leader, DRP/TSS (RLN1)
RITS Coordinator (KEG)
RidsNrrDipmIipb
SISP Review Completed: _Y_____ ADAMS: : Yes
G No Initials: ___REl___
- Publicly Available G Non-Publicly Available G Sensitive
- Non-Sensitive
SOE:OB
C:OB
M. E. Murphy
R. E. LANTZ
/RA/
/RA/
9/29/2005
9/29/2005
FFICIAL RECORD COPY
T=Telephone E=E-mail F=Fax