Category:Letter
MONTHYEARML24024A2372024-01-31031 January 2024 Examination Confirmation Letter No. 50-223/OL-24-01, University of Massachusetts-Lowell IR 05000223/20232012023-11-24024 November 2023 University of Massachusetts, Lowell U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000223/2023201 ML23241A0502023-08-29029 August 2023 Univ. of Massachusetts - Lowell, Submittal of Annual Report ML23152A1582023-06-0101 June 2023 to the Emergency Preparedness Plan for the University of Massachusetts Lowell Research Reactor (Umlrr) ML23107A1862023-04-21021 April 2023 Examination Results Letter No. 50-223/OL-23-01 ML23024A1412023-03-0707 March 2023 Examination Confirmation Letter, University of Massachusetts-Lowell, OL-23-01 IR 05000223/20222012022-10-16016 October 2022 University of Massachusetts Lowell - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000223/2022201 ML22243A1412022-08-30030 August 2022 Annual Report for the University of Massachusetts Lowell Research Reactor ML22154A4812022-06-0909 June 2022 Examination Confirmation Letter No. 50-223/OL-22-01, University of Massachusetts-Lowell ML22075A1172022-03-15015 March 2022 University of Massachusetts-Lowell Research Reactor - Designation of Level-1 and Level-2 Per License Technical Specifications 6.1.2(1 and 2) and 6.7.2(3) ML21168A0532022-02-0303 February 2022 University of Massachusetts Lowell, Transmittal Letter for Renewal of Facility Operating License No. R-125 IR 05000223/20212022021-12-17017 December 2021 University of Massachusetts Lowell U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000223/2021202 IR 05000223/20212012021-12-17017 December 2021 University of Massachusetts-Lowell - Nuclear Regulatory Commission Security Inspection Report No. 05000223/2021201 - Cover Letter ML21302A0552021-11-0909 November 2021 University of Massachusetts Lowell Update Regarding the Renewal of Facility Operating License No. R-125 ML21229A0812021-08-30030 August 2021 University of Massachusetts Lowell, Update Regarding the Renewal of Facility Operating License No. R-125 ML21214A1102021-08-0202 August 2021 Univ of Massachusetts - Lowell, Submittal of Routine Annual Report ML21133A1682021-05-19019 May 2021 University of Massachusetts Lowell, Update Regarding the Renewal of Facility Operating License No. R-125 ML21110A0532021-04-20020 April 2021 University of Massachusetts-Lowell Research Reactor - Draft Renewed License ML20317A1942021-04-13013 April 2021 University of Massachusetts Lowell Routine Reactor Inspection Report - October 2020 ML21095A2452021-04-0505 April 2021 University of Massachusetts, Lowell Research Reactor - Request for Additional Language to Item 2.B of the Proposed Renewed Facility Operating License ML21042B8572021-03-0404 March 2021 University of Massachusetts Lowell, Report on the Regulatory Audit Re the Renewal of Facility Operating License No. R-125 ML21047A2452021-02-16016 February 2021 University of Massachusetts-Lowell Research Reactor - Response to Items Discussed in NRC Telephone Conference with Uml on 02/11/21 ML21030A0052021-01-30030 January 2021 University of Massachusetts-Lowell Research Reactor - Response to NRC License Renewal Audit Letter Dated 12/17/2020 (ML20303A305) ML21007A1722021-01-11011 January 2021 University of Massachusetts Lowell, Status of the Regulatory Audit and Update Regarding the Renewal of Facility Operating License No. R-125 ML21005A2372021-01-0505 January 2021 Univ. of MA-Lowell Research Reactor - Response to NRC Letter Dated December 17, 2020, Report on Regulatory Audits the Renewal of Facility Operating License No. R-125 ML20303A3052020-12-17017 December 2020 University of Massachusetts Lowell, Report on the Regulatory Audits the Renewal of Facility Operating License No. R-125 ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20274A2492020-09-30030 September 2020 University of Massachusetts-Lowell Research Reactor - Response to NRC License Renewal Audit Letter Dated 9/1/2020 (ML20240A043) ML20274A2552020-09-30030 September 2020 Opto 22 Procedures: Software Quality Assurance Plan ML20240A0432020-09-0101 September 2020 University of Massachusetts Lowell, Status of the Regulatory Audit and Update Regarding the Renewal of Facility Operating License No. R-125 ML20196L9762020-07-16016 July 2020 University of Massachusetts Lowell, Status of the Regulatory Audit and Update Regarding the Renewal of Facility Operating License No. R-125 ML20114E0592020-04-27027 April 2020 University of Massachusetts Lowell, Status of the Regulatory Audit and Update Regarding the Renewal of Facility Operating License No. R-125 ML20055F6042020-02-24024 February 2020 University of Massachusetts-Lowell - Closeout of Open RAI Items 7.4c and 7.5a, NRC Letter Dated July 19, 2019 - Request for Additional Information Regarding the Renewal of Facility Operating License No. R-125 ML20036E5012020-02-13013 February 2020 Request for Withholding of Information from Public Disclosure Documents in Support of Licensing Requests Initiated by the University of Massachusetts Lowell ML20021A3152020-02-0404 February 2020 University of Massachusetts Lowell - Regulatory Audit the Renewal of Facility Operating License No. R-125 ML20009E8482020-01-13013 January 2020 University of Massachusetts Lowell, Response to Request for Extension of Time to Respond to Request for Additional Information Regarding the Renewal of Facility Operating License No. R-125 ML20017A1552020-01-0808 January 2020 Request by General Atomics to Withhold Certain Information from Public Disclosure Under 10CFR2.390 ML19354A6102019-12-20020 December 2019 Supplement to University of Massachusetts Lowell Letter Dated 12/19/2019 in Response to Letter from NRC ML19353C5232019-12-19019 December 2019 Second Supplement to Response Dated October 18, 2019 (First Supplement Dated 10/24/19) Regarding NRC Letter Dated July 19, 2019 - Request for Additional Information Regarding the Renewal of Facility Operating License No. R-125 and Second Re ML19296E2792019-10-30030 October 2019 University of Massachusetts Lowell, Response to Request for Extension of Time to Respond to Request for Additional Information Regarding the Renewal of Facility Operating License No. R-125 ML19297F4332019-10-24024 October 2019 University of Massachusetts-Lowell Research Reactor - Supplement to Response Dated October 18, 2019 Regarding NRC Letter Dated July 19, 2019 - Request for Additional Information Regarding the Renewal of Facility Operating License No. R-125 ML19291C2932019-10-18018 October 2019 University of Massachusetts - Lowell - Response to NRC Letter Dated July 19, 2019 - Request for Additional Information Re the Renewal of Facility Operating License No. R-125 Instrumentation and Controls (EPID No. L-2015-RNW-0001) & Request ML19248C1162019-08-30030 August 2019 Submittal of Routine Annual Report for the University of Massachusetts Lowell Research Reactor ML19214A0192019-08-27027 August 2019 University of Massachusetts Lowell, Review of Emergency Plan in Support of License Renewal ML19214A0172019-08-27027 August 2019 University of Massachusetts Lowell, Review of Physical Security Plan in Support of License Renewal ML18092B0902019-07-19019 July 2019 University of Massachusetts Lowell - Request for Additional Information Regarding the Renewal of Facility Operating License No. R-125 for the University of Massachusetts Lowell Research Reactor and Primarily Related to Instrumentation and C IR 05000223/20192012019-07-17017 July 2019 University of Massachusetts Lowell - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000223/2019201 ML19100A2732019-04-10010 April 2019 University of Massachusetts-Lowell - Log Power Measuring Channel - Revised SAR Section 7.4.1.2 for Renewal of Facility Operating License R-125 ML19058A3452019-03-0505 March 2019 Examination Report No. 50-223/OL-19-01, University of Massachusetts - Lowell ML19064B3752019-03-0505 March 2019 Response to NRC Letter Dated November 5, 2018 - Request for Additional Information Regarding the Renewal of Facility Operating License No. R-125 for the University of Massachusetts-Lowell Research Reactor Primarily Related to Technical Spec 2024-01-31
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML21007A1032021-01-0505 January 2021 University of Massachusetts Lowell, Draft Discussion Summaries for Follow-up Questions from Interim Audit Report ML18092B0902019-07-19019 July 2019 University of Massachusetts Lowell - Request for Additional Information Regarding the Renewal of Facility Operating License No. R-125 for the University of Massachusetts Lowell Research Reactor and Primarily Related to Instrumentation and C ML18253A0882018-11-0505 November 2018 University of Massachusetts at Lowell - Request for Additional Information Regarding the Renewal of Facility Operating License No R-125 for the University of Massachusetts at Lowell Research Reactor and Primarily Related to Technical Specif ML18263A0282018-09-19019 September 2018 University of Massachusetts at Lowell, Draft Request for Additional Information for License Renewal ML17276B7832017-11-0707 November 2017 University of Massachusetts at Lowell, Request for Additional Information Regarding the Renewal of Facility Operating License No. R-125 for the University of Massachusetts at Lowell Research Reactor ML17166A0892017-06-21021 June 2017 University of Massachusetts at Lowell Request for Additional Information Regarding the Renewal of Facility Operating License No. R-125 for the University of Massachusetts at Lowell Research Reactor and Related to Financial Qualifications ML16112A0062017-02-0101 February 2017 University Of Massachusetts At Lowell - Request For Additional Information Regarding The Renewal Of Facility Operating License No. R-125 For The University Of Massachusetts At Lowell Research Reactor (MF7199) ML16061A0812016-11-0202 November 2016 University of Massachusetts at Lowell- Request for Additional Information Regarding the Requalification Plan for Renewal of Facility Operating License No. R-125 for the University of Massachusetts at Lowell Research Reactor ML0920300202010-05-0404 May 2010 University of Massachusetts, Request for Additional Information Regarding Application for Special Nuclear Material Possession Limit Increase (Tac No. MD8109) ML0527103692005-10-0707 October 2005 RAI Letter - Security Measures - Bobek 2021-01-05
[Table view] |
Text
OFFICIAL USE ONLY - 10 CFR 2.390(d)
October 7, 2005 Mr. Leo Bobek, Nuclear Radiation Laboratory University of Massachusetts Lowell One University Avenue, Pinanski Energy Center Lowell, MA 01854
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION - SECURITY MEASURES FOR RESEARCH AND TEST REACTORS WITH LICENSED POWER LEVELS LESS THAN 2 MEGAWATTS, WHICH RECEIVED CONFIRMATORY ACTION LETTERS
Dear Mr. Bobek:
By letter dated January 23, 2003, the Nuclear Regulatory Commission (NRC) provided you with a list of security compensatory measures (CMs) intended to enhance the physical security of your facility in the heightened post-September 11, 2001, threat environment. In that letter, the NRC requested that you (1) review each of the CMs to ensure that they could be implemented without having an adverse impact on safety, and (2) prepare a site-specific implementation plan for each CM. In response, you provided an implementation plan, which the NRC agreed to and documented in a Confirmatory Action Letter (CAL) dated October 22, 2003.
In that CAL, the NRC indicated that there was a potential for the NRC to take additional actions on your planned security measures. The NRC finds it necessary to re-verify implementation of the January 23, 2003, CMs implemented at applicable RTR facilities. Accordingly, the NRC is seeking additional information regarding your security-related CM implementation plan. Your response to the enclosed request for additional information should be mailed within 30 days of your receipt of this letter.
The attachment to this letter should be controlled as 10 CFR 2.390(d) information and as such will not be made publicly available. Additionally, the security CMs are unclassified-sensitive information exempted from public disclosure under the provisions of 10 CFR 73.21 (safeguards information). Your response to this letter may contain safeguards information, and thus, would not be authorized for public release. If safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.
WHEN SEPARATED FROM ENCLOSURE, THIS LETTER IS UNCONTROLLED OFFICIAL USE ONLY - 10 CFR 2.390(d)
This request contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501, et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0011, which expires August 31, 2006.
The burden to the public for these information collections is estimated to average 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collection. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0012), Office of Management and Budget, Washington, D.C. 20503.
If you have any questions regarding this request, please contact Mr. Alexander Adams, Jr. or Mr. Marvin Mendonca of my staff at 301-415-1127 or 301-415-1128, respectively.
Sincerely,
/RA/
Brian E. Thomas, Section Chief Research and Test Reactors Section New, Research and Test Reactors Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket No. 50-223
Enclosure:
As stated
This request contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501, et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0011, which expires August 31, 2006.
The burden to the public for these information collections is estimated to average 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collection. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0012), Office of Management and Budget, Washington, D.C. 20503.
If you have any questions regarding this request, please contact Mr. Alexander Adams, Jr. or Mr. Marvin Mendonca of my staff at 301-415-1127 or 301-415-1128, respectively.
Sincerely,
/RA/
Brian E. Thomas, Section Chief Research and Test Reactors Section New, Research and Test Reactors Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket No. 50-223
Enclosure:
As stated DISTRIBUTION:
PUBLIC RNRP/R&TR r/f DHughes MMendonca AAdams RBorchardt BThomas WBeckner OGC-Winsberg EHylton JDyer CBassett FGillespie PIsaac DMatthews WEresian RZimmerman TDragoun GHill (2) VOrdaz SMorris GTracy RCaldwell TBloomer KWitt RAI PACKAGE ACCESSION NO.: ML052710355 RAI LETTER ACCESSION NO.: ML052710369 RAI ENCLOSURE ACCESSION NO.: ML052780294 TEMPLATE No.: NRR-106 OFFICE RNRP:PM NSIR OGC RNRP:SC NAME MMendonca RZimmerman JGoldberg BThomas DATE 10/03/05 10/04/05 10/04/05 10/04/05 OFFICE DRIP:D NRR:D EDO RNRP:SC NAME DMatthews JDyer /BSheron for LReyes BThomas (signature)
DATE 9/22/05 10/04/05 10/04/05 10/07/05 C = COVER E = COVER & ENCLOSURE N = NO COPY OFFICIAL RECORD COPY