2005 ANO NRC RO/SRO Written Examination Post-Exam Changes

  1. 16 RO and SRO QID #0554 (RO Tier 1 Group 1)

Following further review of the reference material, it was determined there are two correct answers to this question, A and C. The question reference, 1203.028 step 10.A, refers to the primary reason for slowly restoring SW to the DH cooler (i.e., water hammer), but it also refers to thermal shock as a secondary concern in the note. Credit will therefore be given to all who chose A or C. The question will be corrected prior to future use.

  1. 73 RO and SRO QID #0579 (RO Tier 3)

After class review of the exam, it was determined that there was no correct answer due to a typo. The typo was in the correct answer C which states HPI vs. the system in the reference, 1202.010 step 13, which is LPI. The question was therefore dropped from the exam. The question will be corrected prior to future use.

  1. 94 SRO QID #0601 (SRO Tier 3)

No misses, however, a comment was made on this question during the exam. The comment suggested that since the Tech Spec 3.2.4, Required Action A.1.2.2, states 2%,

then both C and D are correct. Answer C was listed as the correct answer as the QPT given exceeds the limit by 3% and 3 x 2 = 6. However, answer D is also correct since 8% is greater than 6%. The question will be corrected prior to future use.