ML052690117

From kanterella
Jump to navigation Jump to search
G20050661 - Representative Sue W. Kelly Ltr Re Indian Point - Spent Fuel Pool Leak
ML052690117
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 09/23/2005
From: Kelly S
US HR (House of Representatives)
To:
Office of Congressional Affairs
Shane R, OCA, 301-415-1699
Shared Package
ML052710475 List:
References
CORR-05-0147, G20050661, G20050732, LTR-05-0514
Download: ML052690117 (2)


Text

I EDO Principal Correspondence Control FROM:

DUE: 10/07/05 Representative Sue W. Kelley EDO CONTROL: G20050661 DOC DT: 09/23/05 FINAL REPLY:

Shane, OCA FOR SIGNATURE OF :

PRI CRC NO:

Chairman Diaz DESC:

ROUTING:

Indian Point -

Spent Fuel Pool Leak DATE: 09/23/05 Reyes Virgilio Kane Silber Dean Burns Dyer, NRR Zimmerman, NSIR Outlaw, OCA Cyr, OGC ASSIGNED TO:

RI CONTACT:

Collins SPECIAL INSTRUCTIONS OR REMARKS:

Prepare response to Rep. Kelley for Chairman's signature addressing the attached issues.

Coordinate response with NRR and NSIR.

OEDO

Contact:

Undine Shoop, OEDO lt C l Ae oD -DO

& 2 1~.Ei~- oi.0-

I Items to address in response to Representative Sue W. Kelley from meeting on Friday, September 23, 2005.

- A full written account on what happened and why

- Wants to know why NRC delayed telling the public about the leak

- What is happening to the contaminated soil

- Wants a sit-down with NRC on these issues Additional issues:

- On the siren power issue she wants to know if the two year timeframe is reasonable, should it take that long? Is Entergy making this a priority?

- Update on the cable separation issue

- Bullet on our reporting criteria for an incident like this

- Include Charter for Special Inspection of Indian Point Spent Fuel Pool and the inspection report from the Salem Special Inspection EDO 70r5