FENO C Frp.&w C.b2wqy Perry Nuclear Power Plant 10 Center Road Perry, Ohio 4408!
Richard Anderson Vice President, Nuclear 440-280-5646 Fax: 440-280-5681 September 9, 2005 PY-CEI/OEPA-0437L Ohio Environmental Protection Agency Division of Water Pollution Control Enforcement Section, ES/MOR P.O. Box 1049 Columbus, Ohio 43216-1049 Ladies and Gentlemen:
Enclosed are the NPDES monthly report forms for the month of August 2005. No violations occurred during this period.
If you have questions or require additional information, please contact Mr. Phil Lashley at (440) 280-5145.
Sincerely, Enclosures cc: NRC Region III NRC Resident Inspector NRC Project Manager NRC Document Control Desk (Docket No. 50-440) 11-r-S 3'e
MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP:
Station Code:
Reported Date (Month Year):
Application:
91612005 PerryNuclearPowerPlant 004 August 2005 3IB00016*GD Perry Nuclear Power Plant 10 Center Rd.
Samping Station Descrption PerryOH44081 Point Representative of Discharge in(1) - Enter 1 for Continuous, 2 for Composite. 3 for Grab Sample Reporting Lab:
Analyst:
in(2) - Enter frequency of sampling CCB125 P. Lashley (1
3 1
3 3
(2 1
1 1
999 1
999 1
(50060)
(00400)
(01119)
(00011)
(34044)
(50050)
(78739)
Chlorine, Total pH Copper, Total Water Temperature Oxidants, Total Flow Rate orination/Brominati Residual S.U.
Recoverable F
Residual MGD Duration Day mg/l ug/l mg/l Minutes i01 AA l
87 r
106.8 85 02 AA 8.7 5.8 _
89 106.9 80 03 AA I _
I 89 103.3 86 04 AA 89 88.2 86 05 AA 8.52 84 109.7 90 06 AA 86 112.1 85 07 AA 86 108.9 85 08 AA 85 105.9 80 09 AA 8.61 86 100 80 10 AA l
86 98.6 80 11 0.06 87 99.9 30 12 0.07 8.67 89 95.2 84 13 AA 88 85.7 85 14 AA 86 89.9 85 15 AA 1
1 1
86 106.1 40 16 AA 8.61 85 106.9 80 17 0.04 85 100.6 85 18 0.05 86 103.7 77 19 0.04 8.7 88 T
103.6 81 20 0.04 87 106.1 80 21 AA 87 104.9 78 22 AA 85 107.4 85 23 0.06 8.49 83 108.9 1
85 24 AA 84 107.4 40 25 AA 84 104 8
5 26 0.04 8.7 84 101.2 80 27 AA j
85 1
103.1 85 28 AA I _
83
__l_110.9 80 AA 86 104 80 30 0.04 8.7 86 T
104.4 45
[ 31j 0.07 j _
82 124.7 45 TOTALI 0.51 77.7 5.8 2663 0
3219 2352 l AVG [ 0.0165 N/A 5.8 85.9032 103.8387 75.871 MAX 0.07 8.7 5.8 89 124.7 j
90 MIN l
0 8.49
(
5.8 82 0
85.7 30 I certify under the penalty of law that I have personally examined and am familiar with the information submitted and based on my inquiry of those Individuals Immediately responsible for obtaining the Information, I believe the submitted Information Is true, accurate and complete. I am aware that there are significant penalties for submitting false Information, Including the possibility of fine and imprisonment.
Date Report Complete ature f Report Title of Reporter:
09/06/2005 2
Vice President, Nuclear
- I Form No EPA 4500 (8-91)
(Generated by SWIMS)
Formerly EPA SURI Page 1 of I
MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP:
Station Code:
Reported Date (Month Year):
Application:
91612005 PerryNucdear Power Plant 004 August 2005 3IB00016*GD Perry Nuclear Power Plant 10 Center Rd.
Sampling Station
Description:
Perry OH 44081 Paint Representative of Discharge Reporting Code
'Result Date Additional Remarks Mdl 50060 08/01/2005 Less than MDL.
.04 50060 08/02/2005 Less than MDL.
.04 50060 l08/0/2005 jL:ess than MDL.
.04 50060 08/04/2005 zess than MDL.
.04 50060 08/05/2005 Less than MDL.
.04 50060 08/06/2005 jLess than MDL.
.04 50060 08/07/2005 Less than MDL.
.04 50060 08/08/2005 Less than MDL.
.04 50060 08/09/2005 Less than MDL.
.04 50060 08/10/2005 Less than MDL.
.04 50060 08/11/2005
.04 50060 08/12/2005
.04 50060 08/13/2005 ILess than MDL.
.04 50060 08/14/2005 jLess than MDL.
.04 50060 08/15/2005 jLess than MDL.
1.04 50060 08/16/2005 Less than MDL.
1.04 50060 08/17/2005
.04 50060 08/18/2005
.04 50060 08/19/2005
.04 50060 08/20/2005
.04 50060 08/21/2005 Less than MDL.
.04 50060 08/22/2005 Less than MDL.
.04 50060 08/23/2005 j
.04 50060 08/24/2005 ess than MDL.
.04 50060 08/25/2005 lLess than MDL.
j.04 50060 08/26/2005 Less-tha.04 D
50060 08/27/2005 Less than MDL.
.04 50060__08/28/2005*jLe 50060 j 08/28/2005 jLess than MDL.
.04 50060 08/29/2005 Less than MDL.
.04 50060 j 08/30/2005 04 50060 08/31/2005 1.04 I
_ I_
MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP:
Station Code:
Reported Date (Month Year):
Application:
9/612005 Perry Nuclear Power Plant 601 August 2005 3IB00016*GD Perry Nuclear Power Plant 10 Center Rd.
Sampling Station Descnption PerryOH44081 Discharge from Regenerate Neutralization Pits in(1) - Enter 1 for Contnuous. 2 for Composite, 3 for Grab Sample Reporting Lab:
Analyst:
in(2) - Enter frequency of sampling CCB125 P. Lashley (1
3 99_9_____
(00400)
(00530)
(00550)
(50050) pH Total Suspended Oil and Grease, Flow Rate S.U.
Solids Total MGD Day mg/l mg/l 01 AH 02 8.22
_6 l
AA 0.021 1
03 0.0AH 1
04 AH 05 i
AH 06 l
I AH i
07 AH 08 AH 09 8.41 11 AA 0.008 10 AH 11 8.02 0.016 12 AH 14 AH 15 8.33 14 AA 0.019 16 l
AH 20
=A9 21 8.68 0.017 22 AH 23 AH 24 8.45 AA j
AA 0.017 25 i
AH 26 6.45 AH i
27 =
r 0.019 28 AH 29 AH
__I___
AH 31 l
I AH i
l i _
rTOTAL(
58.56 31 0
0.117 0
0 AVG l
N/A 7.75 0
0.0167 IaMAX 8.68 14 0
0.021 r
MIN 8.02 0
0 0.008 0
0 I certify under the penalty of law that I have personally examined and am fabmliar with the Information submitted and based on my inquiry of those Individuals Immediately responsible for obtaining the Information, I believe the submitted Information Is true, accurate and complete. I am aware that there are significant penalties for submitting false Information, Including the possibility of fine and Imprisonment.
Date Report Comple rter:
Title of Reporter:
[
09/06/2005 Vice President, Nuclear Form No EPA 4500 (8-91)
(Generated by SWIMS)
Formerly EPA SURI Page 1 of 1
MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP:
Station Code:
Reported Date (Month Year):
Application:
91612005 PerryNuclearPowerPlant 601 August 2005 3IB00016*GD Perry Nuclear Power Plant 10 Center Rd.
Sampling Station
Description:
Perry OH 44081 Discharge from Regenerate Neutralization Pits lReporting Code Result Date Additional Remarks Mdl 00530 08/24/2005 Less than MDL.
4.0 00550 08/02/2005 Less than MDL.
5.0 00550 08/09/2005 ILess than MDL.
5.
00550 08/15/2005 1uess than MDL.
5.
00550 08/24/2005 Less than MDL.
5.
50050 08/01/2005 N~o discharge performed this date.
50050 08/03/2005 No discharge performed this date.
50050 08/04/2005 'No discharge performed this date.
50050 08/05/2005 o discharge performed this date.
l 50050 l 08/06/2005 tNo discharge performed this date.
50050 I 08/07/2005 Ho discharge performed this date.
50050 08/08/2005 lo discharge performed this date.
50050 l 08/10/2005 No discharge performed this date.
50050 08/12/2005 No discharge performed this date.
50050 08/13/2005 No discharge performed this date.
50050 08/14/2005 No discharge performed this date.
50050 08/16/2005 No discharge performed this date.
50050 08/17/2005 o discharge performed this date.
50050 08/28/2005 No discharge performed this date.
50050 08/19/2005 No discharge performed this date.
50050 08/20/2005 No discharge performed this date.
50050 08/22/2005 No discharge performed this date.
50050 08/23/2005 No discharge performed this date.
50050 l08/2/2005 o discharge performed this date.
50050 08/26/2005 o discharge performed this date.
50050 l 08/28/2005 So discharge performed this date.
l l_
50050_l_
0/28/2005 So dischargepefrdthsae.ll 50050 08/29/2005 go discharge performed this date.
l._i 50050 l 08/30/2005 iNo discharge performed this date.
50050 08/31/2005 No discharge performed this date.
MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP:
Station Code:
Reported Date (Month Year):
Application:
916/2005 Perry Nuclear Power Plant 602 August 2005 3IB00016*GD Perry Nuclear Power Plant 10 Center Rd.
Sampling Station Descrption:
PerryOH44081 Discharge from Chemical Cleaning Lagoon in(1) - Enter 1 for Continuous, 2 for Composite, 3 for Grab Sample Reporting Lab:
Analyst:
in(2) - Enter frequency of sampling CCB125 P. Lashley (1
2 f
2 3 3 2
3 1.
l (2
998 998 1
998 1_1 999 (00980)
(01119)
(00400)
(00530)
(00550)
(50050)
Iron, Total Copper, Total pH Total Suspended Oil and Grease, Flow Rate Recoverable Recoverable S.U.
Solids Total MGD Day ug/l ug/l mg/l Mg/l 01 AL 02
.04 05iI 08 09 I
I 13 i
14-_
0 36 1
_ 1 17 18 l
22 i
23 24 25 26 ll 28 i_
I__
19 20 r
31 F
_ I i
j'T-0TA L
° l
O 0
O l
I AVG I O
I
__N/A
_II
_I I _
I I
_I_
jMAX 0
jMIN l O
l O
0 O
l 0
I certify under the penalty of Law that I have personally examined and am familiar with the informatUon submitted and based on my Inquiry of those individuals immediately responsible for obtaining the information. I believe the submitted informaiaon is true, accurate and complete. I am awfare that there are significant penallies for submitting false informaiaon, Including the possibility of fine and Imprisonment lDate Report Completed
- ,iLaue0Rpre:
Title of Reporter:
09/06/2005 sVice President, Nuclear 2 6 _ _ _ _
Form No EPA 4500 (8-91)
(Generated by SWIMS)
Formerly EPA SURI Page I of I
MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP:
Station Code:
Reported Date (Month Year):
Application:
9/612005 PerryNuclearPowerPlant 602 August 2005 31B00016*GD Perry Nuclear Power Plant 10 Center Rd.
Sampling Station
Description:
Perry OH 44081 Discharge from Chemical Cleaning Lagoon
.Reporting Code Result Date Additional Remarks IMdl t
00980 08/01/2005 o discharge performed this month.
MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP:
Station Code:
Reported Date (Month Year):
Application:
916/2005 Perry Nuclear Power Plant 800 August 2005 3IB00016'GD Perry Nuclear Power Plant Sampling Station
Description:
PerryOH44081 Intake Water from Lake Erie in()
- Enter 1 for Continuous. 2 for Composite. 3 for Grab Sample Reporting Lab:
Analyst:
in(2) - Enter frequency of sampling CCB125 P. Lashley (1
3 I
~~~i
~
~
u~-~~-~~--~-~----
-~
(2 1 1 999 (01119) 1 (00011)
Copper, Total Water Temperature Recoverable F
Day ug/l 8
01 I
77 02 2.2 78 03 1
79 04 I_
05 79 06 I
79 07 78 08 78 09 ii 75 10 78 11 j
78 12 78 13 78 14 78 15 j
77 1
16 75 j
i 17 75 18 76 19 73 j
20 1
76 21 77 22 76 23 75 24 75 25 4
i 26 1
74 i
27 74 28 731 73 1
I I
I I _
2973 i
30 74 i
I 31 1 73
',TOTAL 2.2 2363 0
l 0
0 0
0 j AVG 2.2 76.2258 1 MAX 2.2 J
80 0
0 0
0 0
iMIN 2.2 73 0
0
_0 0
°
__0 I certify under the penalty of law that I have personally examined and am familiar with the Information submitted and based on my Inquiry of those Individuals Immediately responsible for obtaining the Information. I believe the submitted Information Is true, accurate and complete. I am aware that there are significant penalties for submitting false Information. Including the possibility of fine and Imprisonment Date Report Complet ig of Reporter:
Title of Reporter:
09/06/2005 n
Vice President, Nuclear Form No EPA 4500 (8-91)
(Generated by SWIMS)
Formerly EPA SURI Page 1 of I
MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP:
Perry Nuclear Power Plant Perry Nuclear Power Plant 10 Center Rd.
Perry OH 44081 Station Code:
oO Reported Date (Month Year):
August 2005 Application:
3IB00016*GD 916/2005 Sampling Station
Description:
Intake Water from Lake Erie