Mel'G.
- Allegation Followup Activities - Hope Creek Page 1 l From:
To:
Glenn Meyer; Scott Barber Date:
2/12/04 3:54PM
Subject:
Allegation Followup Activities - Hope Creek
- Glenn, I completed the allegation followup concerning the in-progress maintenance work on the A control room chiller (AK400). Please see attached file.
If you have any questions please let me know.
CC:
David Vito; Mel Gray K>
I IVel Gra y- - tHC_Ak4_ AF.wpd POage 1 1 Mel Gray - Hc..Ak400_AF.wpd Page 1
[
Allegation Follow-up Hope Creek - In-Progress Work on "A" Control Room Chiller (AK400)
Prepared by: Marc S. Ferdas (2/12/2004)
Purpose Investigate work control concerns related to in-progress work on the "A" control room chiller (AK400).
Background
The work management/control process is described in PSEG's procedure NC.WM-AP.ZZ-0001
("Work Management Process"). The work management process is as followed:
T-1 6 Scoping Package Development T-14 Scoping Package Review T-1 2 Work Scoping T-7 Tier 1 Scope Review T-5 Workweek Scope Freeze T-4 Initial Schedule Review T-3 Final Schedule Review T-2 Schedule Freeze T-1 Complete Readiness Reviews T-0 Workweek Implementation T+1 Workweek Review Work that is either added or deleted after the scope freeze (T-5), a "Form 2 Online Schedule Change Request" must be completed. This form ensures that a proper risk analysis is performed to accommodate changes to the work schedule and communication of potential impact to probabilistic safety assessment.
During the T-4 week, maintenance receives the work packages to verify that it is adequate to perform the required work. This usually involves field walkdowns, verifying proper procedures are identified, ensuring correct parts are available and on-site, etc... Prior to work being (i.e.,
day before or day of) performed a job brief is conducted with the crew performing the work and the job supervisor.
Description On February 11, the A control room area chiller was taken out of service for scheduled maintenance; and a 7 day limiting condition of operation was entered for one control room emergency filtration (CREF) subsystem being inoperable.
The work package development for this job went as described below:
The original scope of work involved performing required preventative maintenance calibrations on system instrumentation. In mid January (T-4), the system engineer requested that additional work be added to the work scope and it was added in accordance with the work management procedure using Form 2. The system engineer requested the following additional work on the chiller: (1) outer bearing replacement, (2) oil filter housing replacement, and (3) inspection and/or replacement if necessary of the labyrinth seal. The work (order 60042095) was not added to the work schedule (T-1) till it was confirmed by the maintenance department (superintendent) that the parts were
[Mel-Gray - HQ-Ak400_AF.wPd Page 2 X 1 MeLGray - HC....Ak400_AF.wpd Pacze 2f available and on-site after being ordered.
Maintenance personnel responsible for performing the work were not aware that the additional work activities were added to the work scope till Monday January 9, one day prior to the start of work and after they conducted their necessary reviews.
Conclusion' Additional work was added to the work schedule and not communicated to maintenance personnel after they performed their final work scope reviews. The work was added in accordance with PSEG procedures however was not fully communicated among the maintenance department.
Individuals Contacted Rich Keenan, Maintenance Supervisor Jim Kepley, Operations Work Week Coordinator Edward Deppe, Maintenance Tech
t C IEMP\\GWIO001.TMP M er tBFA2 1
Mail Envelope P'roperties (402BE7F0.8A4: 22: 10166)
.. Page 1
Subject:
Creation Date:
From:
Created By:
Allegation Followup Activities - Hope Creek 2/12/04 3:54PM Marc Ferdas MSF2@nrc.eov Recipients kpl-po.KPDO DJV CC (David Vito)
GSB (Scott Barber)
GWM (Glenn Meyer)
Post Office kpl-po.KPDO Route Files HC_Ak400_AF.wpd MESSAGE Options Expiration Date:
Priority:
Reply Requested:
Return Notification:
Concealed
Subject:
Security:
Size 6214 742 Date & Time 02/12/04 03:46PM 02/12/04 03:54PM None Standard No None No Standard