E-mail from M. Gray of USNRC to G. Meyer of USNRC, Regarding USA Assessment Preliminary Results
ML052620290
Person / Time
Site: Davis Besse, Salem, Hope Creek  
Issue date: 03/08/2004
From: Mel Gray
NRC Region 1
To: Meyer G
NRC Region 1
References
FOIA/PA-2004-0314
Download: ML052620290 (1)


Text

-

I I Glenn Meyer - Fwd: USA Assessment Preliminary Results Page 1 1 I~~

Gln Mee w:UAAssmn PeiiayRslsPg From:

Mel Gray\\D -

To:

Glenn Meyer Date:

3/8/04 1:49PM

Subject:

Fwd: USA Assessment Preliminary Results I talked to Jim Hutton this morning (and Steve Mannon) to further understand the USA verbal exit results.

Some background: USA Alliance is a confederation of mostly single unit nuclear plant operators from US and Canada. They dhall personnel equipment and techniques. After Davis Besse, they decided to develop and perform "Davis Besse assessment", later they changed the name to safety culture assessment. It involves questionaires and interviews throughout the organization and plant walkdowns.

Last Friday (3/5) USA held an exit for about 130-150 PSEG managers. They concluded that some of the issues shown to be precursers at Davis-Besse were here to varying degrees. No new equipment issues or events were identified by USA that were previously unknown to PSEG management. Specifics as already outlined by Marc:

1. Concerned with HC Ops senstivity to Rx management. two conditions identified, the 3/03 reactivity event documented in NRC IRs, and a 12/03 condition where plant went subcritial during start-up when RCIC pipe warming was commenced, and then Ops briefed on it with Rx Engineer and proceeded w/o clear procedure guidance. Example of erring in non-conservative direction when procedure guidance not clear. (This item was submitted by me to be a PIR sample this year when PS evaluation is complete).
2. Salem 13B condenser waterbox problems cited as example where corrective work and use of OE not used adequately that allowed problems to continue.
3. Trending in corrective action program not effective to repair equipment before it fails.
4. material condition is poor, especially in SW bays and EDGs (too many leaksil) (See most recent IR, PIR section.
5. organizational communication is inconsistent.

I don't see anything new here to us (residents) that warrants an increase to our response at this time.

We'll review the report when it comes out.

Mel Gray CC:

Daniel Orr; George Malone; Marc Ferdas; Scott Barber