ML052580392

From kanterella
Jump to navigation Jump to search

Transmittal of Operator Licensing Examination Data
ML052580392
Person / Time
Site: Callaway Ameren icon.png
Issue date: 09/06/2005
From: Arbour W
AmerenUE, Union Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC-5202
Download: ML052580392 (3)


Text

Union Electric Callaway Plant PO Box 620 Fulton, MIO 65251 September 6, 2005 WAmeren UE U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 ULNRC-5202 Ladies and Gentlemen:

Operator Licensing Examination Data Enclosed is a NRC Form 536 for the Callaway Nuclear Plant, NRC Region IV.

If you need additional information, please contact Mr. William E. Arbour at (573)676-8349.

Respectfully, Wil mE rour WEA/mrw

.A.*-**"

ir.

poo-)

a subsidiary otAmeren Corporation

A.--.e ULNRC-5202 September 6, 2005 Page 2 bcc:

Mr. Bruce S. Mallett Regional Administrator U.S. Nuclear Regulatory commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 T160.0005 T210.0006 A160.0761 E210.0001

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/3132008 8-2005)

Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden 0P E RATOR LICENSING estimate to the Records and FOlAIPrivacy Services Branch

_T-5 F53). U.S.

OPERTOR ICENINGNuclear Regulatory Commission, Washington, DC 20555-0001 or by Internet EXAMINATION DATA e-mail to Infocollectsinnrc.gov. and to the Desk Officer. Office of Information Budget. Washington. DC 20503.

If a means used to impose an Informaiaon collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the

.Information collection.

FACILITY NRC REGION Callaway Nuclear Plant IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSEDNUMBER CY -6

-CY 07C

-Y 08

-CY 09 -

ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 06 CY 07 CY 08 CY 09 NUMBER OF REACTOR 0

7 6

0 OPERATORS NUMBER OF SENIOR REACTOR 0

5 6

0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 10/01/2007 08/18/2008 ALTERNATE DATE 10108/2007 08/25/2008 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 06 CY 07 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

12 0

0 0

0 0

12 CANDIDATES NRC FORM 536 (8-2005)

PRINTED ON RECYCLED PAPER