Nu Committed to Nudecar C '

xcell Monticello Nuclear Generating Plant Operated by Nuclear Management Company, LLC September 2, 2005 L-MT-05-095 RIS 2005-19 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Monticello Nuclear Generating Plant Docket 50-263 License No. DPR-22 Proposed Initial License Operator Examinations for 2006 - 2009 as Requested by NRC Regulatorv Issue Summary 2005-19

Reference:

1) NRC Regulatory Issue Summary 2005-19, 'Preparation and Scheduling of Operator Licensing Examinations, dated August 24, 2005.

In accordance with the request contained in Reference 1, Monticello Nuclear Generating Plant is voluntarily submitting the planned initial licensed operator examination data through 2009. The attached NRC Form 536 provides the estimated number of applicants to be tested and the proposed primary and alternate dates for the examinations.

This letter makes no new commitments or changes to any existing commitments.

Vie P t M iK o onway Ate Vice President. Monti oN eneratina Plant Nuclear Management Company, LLC Enclosure cc: Administrator, Region III, USNRC Project Manager, Monticello, USNRC Resident Inspector, Monticello, USNRC pmr5 2807 West County Road 75 . Monticello, Minnesota 55362-9637 Telephone: 763.295.5151 . Fax: 763.295.1454

ENCLOSURE I NRC FORM 536 - OPERATOR LICENSING EXAMINATION DATA

-I page follows

I NRC FORM 636 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO 3150-0131 EXPIRES: 08/31/2008 (8-2005) Estimated burden per response to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection is used to plan budgets end resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOA/Privacy Services Branch (T-5 F53). U.S.

Nuclear Regulatory Commission. Washington, DC 20555-0001. or by Internet e-mail to Infocollects nrc aov and to the Desk Officer, Office of Information EX NATION0 RAMI DATA(3150-0131). Office of Management and Budget. Washington DC 20503. If a means used to Impose an Information llection does not display a currently valid OMB control number, the NRC may not conduct or sponsor and a person Is not required to respond to, the information collection.

FACIUTY NRC REGION Monticello Nuclear Generating Plant 111 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2006 CY2007 CY2008 CY2009 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2006 C2007 CY2008 CW009 NUMBER OF REACTOR 0 5 6 6 OPERATORS NUMBER OF SENIOR REACTOR 0 4 6 6 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0 1 1 1 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 01/15/2007 05/12/2008 01/19/2009 ALTERNATE DATE 02/05/2007 06/0=2008 02/2009 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE I

NRC FORM 536 (8-2005) PRINTED ON RECYCLED PAPER