ML052550058

From kanterella
Jump to navigation Jump to search

ANO Unit 2, Technical Specification Pages Re Addition of Cask Loading Restrictions
ML052550058
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 09/06/2005
From:
Office of Nuclear Reactor Regulation
To:
Holland D, NRR/DLPM, 415-1436
References
TAC MC7648
Download: ML052550058 (2)


Text

REFUELING OPERATIONS FUEL STORAGE LIMITING CONDITION FOR OPERATION 3.9.1 2.a Storage in the spent fuel pool shall be restricted to fuel assemblies having initial enrichment less than or equal to 4.55 +/- 0.05 w/o U-235. The provisions of Specification 3.0.3 are not applicable.

3.9.12.b Storage in the spent fuel pool shall be further restricted by the limits specified in Figure 3.9.2. The provisions of Specification 3.0.3 are not applicable.

3.9.1 2.c The boron concentration in the spent fuel pool shall be maintained (at all times) at greater than 2000 parts per million.

3.9.12.d Storage in the MPC-32 shall be further restricted by the limits specified in Figure 3.9-1. The provisions of Specification 3.0.3 are not applicable.

I APPLICABILITY: During storage of fuel in the spent fuel pool ACTION:

Suspend all actions involving the movement of fuel in the spent fuel pool if it is determined a fuel assembly has been placed in an incorrect location until such time as the correct storage location is determined. Move the assembly to its correct location before resumption of any other fuel movement.

Suspend all actions involving the movement of fuel in the spent fuel pool if it is determined the pool boron concentration is less than 2001 ppm, until such time as the boron concentration is increased to 2001 ppm or greater.

SURVEILLANCE REQUIREMENTS 4.9.1 2.a Verify all fuel assemblies to be placed in the spent fuel pool have an initial enrichment of less than or equal to 4.55 +/-t 0.05 w/o U-235 by checking the assemblies' design documentation.

4.9.12.b Verify all fuel assemblies to be placed in the spent fuel pool are within the limits of Figure 3.9.2 by checking the assemblies' design and burnup documentation.

4.9.12.c Verify at least once per 31 days the spent fuel pool boron concentration is greater than 2000 ppm.

4.9.12.d Verify all fuel assemblies to be placed in a storage cask are within the limits of Figure 3.9-1 by checking the assemblies' design and burnup documentation.

I 261 ARKANSAS - UNIT 2 3/4 9-14 Amendment No. 43,4,74,224,290,

Figure 3.9-1 Loading Restrictions for MPC-32 30.

25 lon-Restricted 7/"O Acceptable Region 20 -_ _ _

I.

C Unacceptable 0,0~~Region M2 10 .- 7 5

2 2.5 3 3.5 4 5 Initial Enrichment (wt%/ U-235) 261 ARKANSAS - UNIT 2 314 9-15 SAS UNI ARKA No. 4-3269, 2 /4-15Amendment