- August 10, 2004 Next ARB: 08/18/2004 (back to usual Wed Reactors ARB.)
Allegation Pit.
Description Next Step Target Date 2004-0104 Sal UCS-PSEG manipulated Unplanned Referral letter to be sent to licensee.
Referral response Downpowers for U1 When response received, PB3 to review for adequacy.
review by PB3:
PB3 sent referral end to OAC 07/30/2004.
no date on ARB form.
Allegation is public.
Date Received: 07/23/2004 Day 180: 01/19/2004
________Day 150: 12/21/2004 2004-0020 Sal Notif system. Boric Acid viv.1 1 Closeout projected for 08/31/04. uStatuse letter enclosure to Memo to OAC ORA 07/23/2004.
asap Response to 2nd 14-day limit referral came in by fax 08/02/2004.
Date Received: 03/08/04 Day 180: 09/04/04 Day 150: 08/06/2004.
2004-0010 SaV 8 concerns. Relief viv histor op.
Response to 2r4 14-day limit referral came in by fax HC 08/0212004. PB3 wrote closeout memo and gave to OAC Friday, August 6. Closed.
Date Received: 02111/04 Day 180: 08108104 Day 150: 07/10/2004
/
August 10,2004 Next ARB: 08/18/2004 (back to usual Wed Reactors ARB.)
2..
- 1
--7(
w ______________
2003-0110 SaV HC wrongdoing Involv dctlon over safety concerns Seek agreement from NRC stakeholders about Deviation Memo details. Mid-cycle assessment letter will outline our unsaid thoughts removed from the final SCWE letter that went out 07/30/2004.
Possible update meeting week of 08/09/04 i
Date Received: 09/03/2003 Day 180: 03/01/2003 2004-0035 Sal Switchgear ventilation strong across Draft Enclosure memo needs to be reviewed and submitted 08/18/04 fire doors to OAC.
Date Received: 03/22/04 Day 180: 09/18/04 Day 150: 08/18/04 2004-0036 Sal S/G blowdown process rad monitors It was determined that no violations have occurred and 08/18/04 remaining action Is for the draft closeout memo to be plant vent process rad monitor action reviewed and submitted to OAC.
statement references Date Received: 03/23/04 Day 180. 09/19/04 Day 150: 08/18/04 2002-0099 HC SRO-licensed Ops Superintendent With 01 2002-027, H&l claimed H&I.