MONTHYEARML24016A1612024-01-10010 January 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms - Two Atlantic Sturgeon 1/9/2024 ML24002A7222023-12-29029 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - 2023 Annual Report - Inspection of the Circulating Water Intake Structure (Cwis) Trash Rack Bars ML24002A7242023-12-28028 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form - Sturgeon 12/28/2023 ML24002A7252023-12-21021 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Shortnose Sturgeon 12/21/23 ML23355A2732023-12-21021 December 2023 NRR E-mail Capture - (External_Sender) PSEG Response to Questions Associated with Supplement to Salem-Hope Creek Eab Reduction LAR ML23346A0962023-12-0606 December 2023 NRR E-mail Capture - Reminder - Final Report - Completion of Required Additional Protocol (AP) Information in Accordance with the U.S. - IAEA Treaty Obligations ML23311A0792023-11-0101 November 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Atlantic Sturgeon Collected on 10/31/2023 ML23277A0482023-10-0404 October 2023 NRR E-mail Capture - 10/4/2023 Email: Acceptance Review - Hope Creek and Salem 1 and 2 - LAR to Modify Exclusion Area Boundary ML23277A0732023-09-29029 September 2023 NRR E-mail Capture - (External_Sender) 9/29/2023 Email from PSEG: Supplement to Proposed Amendment to PSEG Master Decommissioning Trust Amendment ML23226A0702023-08-11011 August 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form for Sturgeon Collected on 8/10/2023 ML23226A0732023-08-10010 August 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Submittal of Necropsy Reports Regarding Sea Turtles Collected on 06/12/2022 ML23201A0132023-07-20020 July 2023 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML23172A0982023-06-21021 June 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemp'S Ridley Sea Turtle Collected on 06/20/2022 ML23164A2062023-06-13013 June 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemp'S Ridley Sea Turtle Collected on 06/12/2023 ML23163A0442023-06-0606 June 2023 NRR E-mail Capture - (External_Sender) Biological Opinion GAR-2020-02842; FIN Clip Analysis Facilities ML23153A1552023-06-0202 June 2023 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon 6/1/2023 ML23151A6582023-05-31031 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms Sturgeon 5/30/2023 ML23137A2632023-05-17017 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms Sturgeon 5/16/2023 ML23135A0102023-05-11011 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report Sturgeon 5/11/2023 ML23136B2832023-05-0404 May 2023 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon 5/3/2023 ML23122A1672023-05-0202 May 2023 NRR E-mail Capture - Acceptance Review - Hope Creek and Salem 1 and 2 - Revise TS to Delete TS Section 5.5 - Meteorological Tower Location ML23122A1982023-05-0202 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms for Atlantic Sturgeon 5/1/2023 ML23117A2722023-04-17017 April 2023 NRR E-mail Capture - (External_Sender) Salem Generating STATION-INCIDENTAL Take of Atlantic Sturgeon Collected on 04/14/2023 ML23079A0032023-03-17017 March 2023 NRR E-mail Capture - Hope Creek, Salem 1 and 2 - Evacuation Time Estimate Review ML23065A0452023-02-23023 February 2023 NRR E-mail Capture - (External_Sender) Salem & Hope Creek Generating STATIONS-ANNUAL Incidental Take REPORT-STATION & REMP ML23033A0302023-02-0808 February 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report Sturgeon 1/24/2023 ML23010A2882023-01-10010 January 2023 NRR E-mail Capture - (External_Sender) Salem Generating STATION-INCIDENTAL Take of Atlantic Sturgeon Collected on 01/09/2023 ML23003A2412023-01-0303 January 2023 NRR E-mail Capture - Final Nvib RAI - Salem Unit 2 Relief Request S2-I4R-211, Fourth Inservice Inspection (ISI) Interval Limited Examinations ML23003A2402022-12-21021 December 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form for Atlantic Sturgeon Collected on 12/20/2022 ML22357A0102022-12-21021 December 2022 NRR E-mail Capture - Final Nphp RAI - Salem Unit 2 Relief Request S2-I4R-211, Fourth Inservice Inspection (ISI) Interval Limited Examinations ML23003A2392022-12-20020 December 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms for Atlantic Sturgeons Collected 12/19/2022 ML22333A9022022-11-29029 November 2022 NRR E-mail Capture - Final Iolb RAI - Salem 1 and 2 LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG ML22291A3702022-10-18018 October 2022 NRR E-mail Capture - Acceptance Review - Salem 2 - Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations (L-2022-LLR-0066) ML22290A2202022-10-17017 October 2022 NRR E-mail Capture - Final RAI - Salem 1 and 2 LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG ML22285A1562022-10-12012 October 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report Atlantic Sturgeon 10/11/2022 (Bottom Trawl) ML22280A1302022-10-0707 October 2022 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report - Sturgeon 10/06/2022 ML22269A4822022-09-26026 September 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report: Kemp'S Ridley Sea Turtle 09/23/2022 ML22269A0352022-09-23023 September 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report: Kemp'S Ridley Sea Turtle 09/22/2022 ML22265A1512022-09-22022 September 2022 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Relocate TS Requirements for Reactor Head Vents to TRM ML22286A2062022-09-14014 September 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report: Kemp'S Ridley Sea Turtle 09/13/2022 ML22244A0422022-09-0101 September 2022 NRR E-mail Capture - Acceptance Review - Salem 2 - Revise and Relocate Reactor Coolant System PT Limits and Pops Limits to PTLR ML22244A1192022-09-0101 September 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report: Kemp'S Ridley Sea Turtle 08/31/2022 ML22206A0262022-07-25025 July 2022 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Revise TS to Extend Allowed Outage Time for Inoperable EDG ML22206A1032022-07-22022 July 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report: Kemp'S Ridley Sea Turtle 07/21/2022 ML22194A0522022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review - Hope Creek, Salem 1 and 2 - Relocate Staff Qualification Requirements to Licensee Quality Assurance Topical Report ML22188A0762022-07-0707 July 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report: Kemp'S Ridley Sea Turtle 07/06/2022 ML22187A1482022-07-0606 July 2022 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection - Sturgeon 07/05/2022 ML22199A2432022-06-29029 June 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report: Kemp'S Ridley Sea Turtle 06/28/2022 ML22129A0682022-05-0505 May 2022 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report - 2 Sturgeon 05/04/2022 ML22122A0442022-05-0202 May 2022 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Request for Relief from ASME Code Defect Removal for Service Water Buried Piping (L-2022-LLR-0040) 2024-01-10
[Table view] |
Text
Vito - M re-review of transcrip tallegation file re: the Salem Hilti bolt guy Ayav, Page 1 From: Scott Barber To: David Vito Date: 1/29/03 2:10PM
Subject:
My re-review of transcript/allegation file re: the Salem Hilti bolt guy Thanks for the thoruigh review. I'm at Salem this week. I'll have to pick this after I return to the office.
>>> David Vito 01/29/03 11:35AM >>>
Scott, As I indicated at the end of our ARB discussion last week (1/22103), I wanted to re-review Allegation File RI-2002-A-0137 because it was my impression that at least one of the issues you documented as a new item derived from the 01 interview transcript review appeared to be something that we may have already documented and acknowledged. I finished my re-review this morning. The concerns provided on your Allegation Receipt Report form were as follows:
- 1. Alleger indicated that installed Hilti Bolts should have fire endurance identification markings and should be fire wrapped.
- 2. Alleger indicated that a fire wrap butt joint was installed in a location installed that called for a lap joint.
- 3. Alleger indicated that he was directed to install the fire wrap in a configuration other than the design as-drawn configuration on at least one occasion.
After my re-review, I agree that Concerns 1 and 3 are new (I found more detail re: Concern 3 in the alleger's earlier submitted package of information and I will add that to the allegation receipt form).
Regarding Concern 2, I believe that it is referring to the Airdrop Cable to Conduit interface matter, and is an issue that was addressd both in the RI-2002-A-0137 acknowledgment letter to the alleger and in the first referral letter to the licensee. Also, in the transcript of the telephone interview between Eileen Neff, Suresh Chaudhary, and the alleger on November 26, 2002, I noticed another statement that we didn't specifically acknowledge as an alleger concern that perhaps we should have. Specifically, the alleger informed Suresh that there were no approved written procedures for the installation of the fire lagging (I will add this to the new allegation receipt form as an additional issue).
Re: Concern 2, the following excerpts from the 121902 interview transcript and the transcript of the 11/26/02 telephone interview are what I believe demonstrate that this issue has already been acknowledged and referred:
From 1219102 transcript, pgs 94-96:
".Ilmade a report on it. I am going from a cable, conduit, forming the conduit...... to a side entry ..... I t's still called an airdrop on the envelope ..... you have to put the first two layers on this before you put the envelope around the cable tray itself."
"(the alleger) looked at it...... the design stated ...... you have your 2-4 inch lap, and it's like a funnel and you bring it down."
"the QC engineer'came ...... I said, "I'm having a problem with this. I was told to put the two layers ..... but he (supervisaor) told me not to do it according to design. I'm going to do it according to design." (alleger said)....well, because it's not per design and we were taught that per design means that this had been fire tested, and without fire testing, I can't do this other configuration ........ It's a butt joint, is what he's trying to tell me to do.... instead of the overlap.... which is a good thing...."
From 11.26.02.telecon transcript, pg. 19:
".... and the interface between the cable and the conduit I spoke (of), if you would step on that conduit, it would break the barrier."
Dv Vio- My re-review of transcriet/allegation file re: the Salem Hilti bolt guy 'Page 2 The corresponding item that was referred to PSEG on 1/3/03 was as follows:
- 2. Regarding the application of the fire wrap material, it has been asserted that the interface between the air drop cable and conduit is not adequate in that the overlap joint (cable to conduit) will break open if stepped upon. It was also asserted that these applications are not fire tested.
Please review the above informalon. If you agree with my assessment, I will modify the new allegation receipt report accordingly, and start to draft up the referral letter. Le me know what you think.