Midcycle 2005 Performance Review and Inspection Plan - Diablo Canyon Power Plant
ML052430066
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/30/2005
From: William Jones
NRC/RGN-IV/DRP/RPB-B
To: Rueger G
Pacific Gas & Electric Co
References
Download: ML052430066 (6)


Text

UNITED STATES NUCLEAR REGULATORY CO M M ISS IO N REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-4005 August 30,2005 Gregory M. Rueger, Senior Vice Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 3 Avila Beach, CA 93424 President, Generation and Chief Nuclear Officer

SUBJECT:

MIDCYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

DIABLO CANYON POWER PLANT

Dear Mr. Rueger:

On August 2, 2005, the NRC staff completed its performance review of the Diablo Canyon Power Plant for the first half of the calendar year 2005 assessment cycle. Our technical staff reviewed performance indicators (PIS) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility in order for you to inform us of any planned inspections that may conflict with your plant activities.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.

Plant performance for the most recent quarter at Diablo Canyon Power Plant Units 1 and 2 was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIS indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process baseline inspections at your facility.

In our annual assessment letter dated March 3,2004, and as updated in our midcycle and annual assessment letters dated August 30, 2004, and March 2, 2005, respectively, we advised you of a substantive crosscutting issue in the area of problem identification and resolution. This crosscutting issue was identified based on a number of corrective action findings described in the previous letters. The problem identification and resolution substantive crosscutting issue was of concern because inspection findings, particularly those involving long-standing degraded conditions and the adequacy of evaluations, continued to be identified subsequent to the implementation of corrective action program improvements. Based on our review of your recent performance in this area, we have noted improvements in your staffs implementation of the corrective action program. Specifically, we noted that the quality of evaluations and the

Pacific Gas and Electric Company effectiveness of resulting corrective actions taken to address equipment reliability issues have improved. We also noted your continuing efforts to sustain improvement in the implementation of the site corrective action program.

The enclosed inspection plan details the inspections, except those related to physical protection, scheduled through March 31, 2007. In addition to baseline inspections, Temporary Instructions (TI) Reactor Vessel Head Penetration (TI-I 50) and Pressurizer Nozzle Weld Safety Issue inspections (TI-I 60), and Independent Spent Fuel Storage Installation (ISFSI) inspections will be conducted as necessary. The inspection plan is provided to minimize the resource impact on your staff and to allow for the early resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle review meeting.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at httr>://www.nrc.aov/readina-rmladams. html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (817) 860-8141 with any questions you may have regarding this letter or the inspection plan.

Sincerely, William B. Jones Project Branch B Division of Reactor Projects Dockets: 50-275 Licenses: DPR-80 50-323 DPR-82

Enclosure:

Diablo Canyon Power Plant Inspection/Activity Plan

Pacific Gas and Electric Company cc w/enclosure:

David H. Oatley, Vice President and General Manager Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Donna Jacobs Vice President, Nuclear Services Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 James R. Becker, Vice President Diablo Canyon Operations and Station Director, Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box3 Avila Beach, CA 93424 Sierra Club San Lucia Chapter ATTN: Andrew Christie P.O. Box 15755 San Luis Obispo, CA 93406 Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, CA 93448 Chairman San Luis Obispo County Board of Room 370 County Government Center San Luis Obispo, CA 93408 Supervisors Truman Burns\\Robert Kinosian California Public Utilities Commission 505 Van Ness Ave., Rm. 4102 San Francisco, CA 941 02-3298 Diablo Canyon Independent Safety Committee Robert R. Wellington, Esq.

Legal Counsel 857 Cass Street, Suite D Monterey, CA 93940 Ed Bailey, Chief Radiologic Health Branch State Department of Health Services P.O. Box 997414 (MS 7610)

Sacramento, CA 95899-7414 Richard F. Locke, Esq.

Pacific Gas and Electric Company P.O. Box 7442 San Francisco, CA 94120 City Editor The Tribune 3825 South Higuera Street P.O. Box 112 San Luis Obispo, CA 93406-01 12 James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 34)

Sacramento, CA 95814 Jennifer Tang Field Representative United States Senator Barbara Boxer 1700 Montgomery Street, Suite 240 San Francisco, CA 941 11 Institute of Nuclear Power Operations (INPO)

Records Center 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339

u ) u ) u ) u ) u )

C C

C C

C u ) u ) m u ) u )

C K

C C

S a, a, a, a, a,

.E.E.E.E.E 5 5 5 5 5 3 3 3 3 3 m

m m

m m

N

U F

V

)

a, m

0 Q

B 8

z" c

b 0

0 r

m s

0 b

0 0

In m

0

??

B l - l -

b B e m

v 2

w

-I E

z t

r z

3 z

z 0

9 9

a m

n a -

a, E

Q 8

c 0

z b

0 0

r m e m

0 b

0 0

In m

0 r

B

Pacific Gas and Electric Company Electronic distribution by RIV:

Regional Administrator (BSMI )

DRP Director (ATH)

DRS Director (DDC)

DRS Deputy Director (KMK)

Senior Resident Inspector (TWJ)

Branch Chief, DRP/B (WBJ)

Senior Project Engineer, DRP/E (RAKI)

Team Leader, DRPRSS (RLNI)

RITS Coordinator (KEG)

V. Dricks, PA0 (VLD)

W. Maier, RSLO (WAM)

C. Gordon (CJG)

DRS Branch Chiefs (LJS, MPSI, REL, NFO)

S. Richards, Chief, NRR/DIPM/IIPB (SAR)

M. Case, Deputy Dir. for Inspection and Programs (MJC)

B. Sheron, Associate Dir. for Project Licensing and Technical Analysis (BWS)

T. Bergman, Chief, TRPSOEDO (TAB)

H. Berkow, Director, LPD4, NRR/DLPM (HNB)

D. Collins, Chief, PDIV-2, NRRlDLPM (DXCI)

G. Shukla, NRR Project Manager (GSS)

SlSP Review Completed:

ADAMS: lid Yes 0 No Initials:

Publicly Available 0

blicly Available Sensitive lid No OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax