ML052420476

From kanterella
Jump to navigation Jump to search
Fitness for Duty Program Performance Report
ML052420476
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/22/2005
From: Harden P
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML052420476 (5)


Text

I Committed to Nuclear Exce1lo Palisades Nuclear Plant Operated by Nuclear Management Company, LLC August 22, 2005 10 CFR 26.71 (d)

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Fitness For Duty Program Performance Report In accordance with 10 CFR 26.71(d), Nuclear Management Company, LLC, is providing the Fitness For Duty Program Performance Report for the Palisades Nuclear Plant (PNP) for the period of January 1, 2005, through June 30, 2005.

Enclosures 1 and 2 summarize the test results at the PNP.

Summary of Commitments This letter ontains no new commitments and no revisions to existing commitments.

Paul A. Harden Site Vice President, Palisades Nuclear Plant Nuclear Management Company, LLC Enclosures (2)

CC Administrator, Region l1l, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC 27780 Blue Star Memorial Highway . Covert, Michigan 49043-9530 Telephone: 269.764.2000

ENCLOSURE 1 SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE

SUMMARY

January 1 though June 30, 2005

1. MANAGEMENT

SUMMARY

A. RANDOM TESTING During this reporting period, Nuclear Management Company, LLC conducted a total of 202 random tests with the following results:

Donor Group Random Tests Results Employees 146 Random testing identified one positive drug/alcohol result.

Contractors 56 Random testing identified no positive drug/alcohol results.

The percentage of random tests conducted during this period was 50%.

The positive drug/alcohol rate for 2005 indicates a stable trend for employees and contractors:

Random Tests Positive Rate Leading Substance Emplovees CN's Emnlovees CN's Cocaine THC 1995 665 207 0.0% 0.5% I 1996 629 216 0.2% 0.9% 2 1997 891 120 0.2% 0.8% 3 1998 767 208 0.5% 0.0% 3 1999 496 140 0.2% 0.0% 1 2000 536 53 0.0% 0.0%

2001 438 131 0.0% 0.0%

2002 482 122 0.0% 0.0%

2003 366 156 0.3% 0.0% I 2004 390 219 0.2% 0.0% I 2005 (YTD) 146 - 56 0.7% 0.0% I B. PRE-ACCESS TESTING A total of 196 pre-access tests were conducted during this reporting period. One individual was denied access based on a positive test result.

Page 1 of 2

ENCLOSURE I SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE

SUMMARY

January 1 through June 30, 2005 C. FOR CAUSE TESTING One uFor Cause" test was required during the reporting period. The test was given because of observed behavior. The results of that test were positive for alcohol.

D. FOLLOW-UP TESTING No individuals tested positive during "Follow-Up" testing.

E. APPEALS The appeal process was not initiated during this reporting period.

2. REPORTABLE EVENTS UNDER 10 CFR 26.73 During this six-month interval, Palisades Nuclear Plant reported that a non-licensed licensee supervisor tested positive for cocaine during a random test. This was reported under 10 CFR 26.73.

Page 2 of 2

ENCLOSURE 2 SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE DATA January 1 through June 30, 3005 Nuclear Management Company, LLC June 30,2005 Company 6 Months Ending Palisades Nuclear Plant Location Mike Nock 269-764-2565 Contact Name Phone (include Area Code)

Cutoffs: Screen/Confirmation (ng/ml): Appendix A to 10 CFR 26 Marijuana / Amphetamines / /

Cocaine / Phencyclidine / /

Opiates / Alcohol (% BAC)* /

  • Any detectable amount for situations other than random.

Long-Term Short-Term Testing Results Licensee Contractor Contractor Employees Personnel Personnel Average Number With Unescorted Access 599 N/A 211

  1. Tested #Positive #Tested #Positive #Tested #Positive Categories Pre-Access 32 0 =- 164 1 FOR Post-Accident 0 0 - 0 0 CAUSE Observed 1 1 - 0 0 Behavior Random 146 1 --- - 56 0 Follow-up 15 0 --- - 0 0 Other 0 0 0 0 TOTAL 194 2 220 1 Page 1 of 2

ENCLOSURE2 SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE DATA A January 1 through June 30, 3005 Breakdown of Confirmed Positive Tests for Specific Substances Licensee Employees Long-Term Contractors 11Marijuana Cocaine Opiates

==

rAmphe-tamines Phency-clidine Alcohol 1

Refusal to Test

=

1

=

2

=

3

=

4 5 Short-Term Contractors 1 Total I i I i I IiIIIII 13 Page 2 of 2