Inspection/Activity Plan 09/01/2005 - 03/31/2007
ML052420467
Person / Time
Site: Surry, 07200002  Dominion icon.png
Issue date: 08/29/2005
From: Landis K
NRC/RGN-II/DRP/RPB5
To: Christian D
Virginia Electric & Power Co (VEPCO)
Shared Package
ML052420455 List:
References
Download: ML052420467 (2)


Text

Page 1 of 2 Surry 08/29/2005 16:21:03 Inspection / Activity Plan Report 22 09/01/2005 - 03/31/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB1-MODS - MODIFICATIONS/10CFR50.59 5 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 09/19/2005 09/23/2005 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 09/19/2005 09/23/2005 Baseline Inspections EB1SSDPC - SSDPC PRE-INSPECTION VISIT 1 1, 2 IP 7111121 Safety System Design and Performance Capability 12/12/2005 12/16/2005 Baseline Inspections OL PREP - INITIAL EXAM PREP 4 1 V23210 SURRY/EXAMS AT POWER FACILITIES 01/09/2006 01/13/2006 Not Applicable EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY 6 1, 2 IP 7111121 Safety System Design and Performance Capability 01/09/2006 01/13/2006 Baseline Inspections 1, 2 IP 7111121 Safety System Design and Performance Capability 01/23/2006 01/27/2006 Baseline Inspections 1, 2 IP 7111121 Safety System Design and Performance Capability 02/06/2006 02/10/2006 Baseline Inspections OL EXAM - EXAM WEEK 1 4 1 V23210 SURRY/EXAMS AT POWER FACILITIES 01/23/2006 01/27/2006 Not Applicable OL EXAM - EXAM WEEK 2 4 1 V23210 SURRY/EXAMS AT POWER FACILITIES 02/06/2006 02/10/2006 Not Applicable PS2 EP - EP EXERCISE 4 1, 2 IP 7111401 Exercise Evaluation 02/06/2006 02/10/2006 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 02/06/2006 02/10/2006 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 02/06/2006 02/10/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 02/06/2006 02/10/2006 Baseline Inspections EB3-ISI - U1 INSERVICE INSPECTION 2 1 IP 7111108P Inservice Inspection Activities - PWR 05/01/2006 05/05/2006 Baseline Inspections EB3SGISI - U1 STEAM GENERATOR ISI 1 1 IP 7111108P Inservice Inspection Activities - PWR 05/08/2006 05/12/2006 Baseline Inspections EB3-HS - HEAT SINK 1 1, 2 IP 7111107B Heat Sink Performance 05/22/2006 05/26/2006 Baseline Inspections EB2-TFP - TRIENNIAL FP PRE-INSPECTION VISIT 4 1, 2 IP 7111105T Fire Protection [Triennial] 05/16/2006 05/18/2006 Baseline Inspections EB2-TFP - TRIENNIAL FIRE PROTECTION INSPECTION 4 1, 2 IP 7111105T Fire Protection [Triennial] 06/12/2006 06/16/2006 Baseline Inspections EB2-TFP - TRIENNIAL FIRE PROTECTION INSPECTION 4 1, 2 IP 7111105T Fire Protection [Triennial] 06/26/2006 06/30/2006 Baseline Inspections PS1-RP - RP PREINSPECTION VISIT PUBLIC/ ISFSI 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 07/10/2006 07/12/2006 Baseline Inspections This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.

Page 2 of 2 Surry 08/29/2005 16:21:03 Inspection / Activity Plan Report 22 09/01/2005 - 03/31/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PS1-RP - RP BASELINE PUBLIC 4 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 07/31/2006 08/04/2006 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 07/31/2006 08/04/2006 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 07/31/2006 08/04/2006 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 07/31/2006 08/04/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 07/31/2006 08/04/2006 Baseline Inspections EB3-MR - MR EFFECTIVENESS 2 1, 2 IP 7111112B Maintenance Effectiveness 08/28/2006 09/01/2006 Baseline Inspections PS2-EP - EP INSP 1 1, 2 IP 7111402 Alert and Notification System Testing 10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/23/2006 10/27/2006 Baseline Inspections EB3-ISI - U2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 10/30/2006 11/03/2006 Baseline Inspections EB3SGISI - U2 STEAM GENERATOR ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 11/06/2006 11/10/2006 Baseline Inspections OL RQ - REQUAL INSPECTION 2 1, 2 IP 7111111B Licensed Operator Requalification Program 03/05/2007 03/09/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.