Saint Lucie Inspection / Activity Plan 09/01/2005 - 03/31/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2005 08:06:27 Report 22 1
PS-RP
- RADIATION PROTECTION - PRE-INSP VISIT Baseline Inspections 09/19/2005 09/21/2005 Access Control to Radiologically Significant Areas IP 7112101 1, 2 4
MTN-HEAD - REACTOR HEAD REPLACEMENT Other Routine 09/26/2005 09/30/2005 Reactor Vessel Head Replacement Inspection IP 71007 1
Other Routine 11/07/2005 11/10/2005 Reactor Vessel Head Replacement Inspection IP 71007 1
Other Routine 11/07/2005 11/11/2005 Reactor Vessel Head Replacement Inspection IP 71007 1
2 EB3-ISI
- U1 INSERVICE INSPECTION Baseline Inspections 10/10/2005 10/14/2005 Inservice Inspection Activities - PWR IP 7111108P 1
2 EB3SGISI
- STEAM GENERATOR ISI Baseline Inspections 10/17/2005 10/21/2005 Inservice Inspection Activities - PWR IP 7111108P 1
3 PS-RP
- RP OCCUPATIONAL BASELINE & RX HEAD WK-1 Safety Issues 10/17/2005 10/21/2005 Transportation of Reactor Control Rod Drives in Type A Packages IP 2515/161 1, 2 Other Routine 10/17/2005 10/21/2005 Reactor Vessel Head Replacement Inspection IP 71007 1, 2 Baseline Inspections 10/17/2005 10/21/2005 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 10/17/2005 10/21/2005 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 10/17/2005 10/21/2005 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 10/17/2005 10/21/2005 Performance Indicator Verification IP 71151 1, 2 1
EB3 PZR
- PRESSURIZER REPLACEMENT Safety Issues 10/17/2005 10/21/2005 Pressurizer Replacement Inspection IP 50003 1
Safety Issues 11/07/2005 11/11/2005 Pressurizer Replacement Inspection IP 50003 1
3 PS1-RP
- RP OCCUPATIONAL BASELINE & RX HEAD WK-2 Other Routine 11/14/2005 11/18/2005 Reactor Vessel Head Replacement Inspection IP 71007 1, 2 Baseline Inspections 11/14/2005 11/18/2005 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 11/14/2005 11/18/2005 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 11/14/2005 11/18/2005 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 11/14/2005 11/18/2005 Performance Indicator Verification IP 71151 1, 2 2
EB3-MR
- MR EFFECTIVENESS Baseline Inspections 01/09/2006 01/13/2006 Maintenance Effectiveness IP 7111112B 1, 2 3
PS2-EP
- EP EXERCISE Baseline Inspections 02/13/2006 02/17/2006 Exercise Evaluation IP 7111401 1, 2 Baseline Inspections 02/13/2006 02/17/2006 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 02/13/2006 02/17/2006 Performance Indicator Verification IP 71151 1, 2 3
OL PREP
- INITIAL EXAM PREP Not Applicable 02/27/2006 03/03/2006 ST. LUCIE/EXAMS AT POWER FACILITIES V23220 1
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Saint Lucie Inspection / Activity Plan 09/01/2005 - 03/31/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2005 08:06:27 Report 22 3
OL EXAM
- INITIAL EXAM Not Applicable 03/20/2006 03/31/2006 ST. LUCIE/EXAMS AT POWER FACILITIES V23220 1
2 EB3-ISI
- U2 INSERVICE INSPECTION Baseline Inspections 05/08/2006 05/12/2006 Inservice Inspection Activities - PWR IP 7111108P 2
1 EB3SGISI
- U2 STEAM GENERATOR ISI Baseline Inspections 05/15/2006 05/19/2006 Inservice Inspection Activities - PWR IP 7111108P 2
5 DRP
- PI&R Baseline Inspections 06/12/2006 06/16/2006 Identification and Resolution of Problems IP 71152B 1, 2 Baseline Inspections 06/26/2006 06/30/2006 Identification and Resolution of Problems IP 71152B 1, 2 4
EB2-TFP
- TRIENNIAL FP PRE-INSPECTION VISIT Baseline Inspections 09/05/2006 09/07/2006 Fire Protection [Triennial]
IP 7111105T 1, 2 4
EB2-TFP
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 10/02/2006 10/06/2006 Fire Protection [Triennial]
IP 7111105T 1, 2 Baseline Inspections 10/16/2006 10/20/2006 Fire Protection [Triennial]
IP 7111105T 1, 2 1
PSB1 RP
- RP PUBLIC PRE-INSP VISIT Baseline Inspections 10/09/2006 10/11/2006 Access Control to Radiologically Significant Areas IP 7112101 1, 2 4
PSB1
- RP PUBLIC BASELINE Baseline Inspections 10/30/2006 11/03/2006 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 10/30/2006 11/03/2006 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 Baseline Inspections 10/30/2006 11/03/2006 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P IP 7112203 1, 2 1
EB3-HS
- HEAT SINK Baseline Inspections 01/08/2007 01/12/2007 Heat Sink Performance IP 7111107B 1, 2 1
PS2-EP
- EP INSP Baseline Inspections 01/29/2007 02/02/2007 Alert and Notification System Testing IP 7111402 1, 2 Baseline Inspections 01/29/2007 02/02/2007 Emergency Response Organization Augmentation Testing IP 7111403 1, 2 Baseline Inspections 01/29/2007 02/02/2007 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 01/29/2007 02/02/2007 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1, 2 Baseline Inspections 01/29/2007 02/02/2007 Performance Indicator Verification IP 71151 1, 2 3
EB1-MODS
- MODIFICATIONS/10CFR50.59 Baseline Inspections 02/26/2007 03/02/2007 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2 Baseline Inspections 02/26/2007 03/02/2007 Permanent Plant Modifications IP 7111117B 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.