Mid-Cycle Performance Review and Inspection Plan - Braidwood Station
ML052420281
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 08/30/2005
From: Richard Skokowski
NRC/RGN-III/DRP/RPB3
To: Crane C
Exelon Generation Co
References
Download: ML052420281 (6)


Text

August 30, 2005 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

BRAIDWOOD STATION

Dear Mr. Crane:

On August 9, 2005, the NRC staff completed its mid-cycle plant performance review of Braidwood Station, Units 1 and 2 for the first half of the calendar year 2005 assessment cycle.

Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.

Plant performance for the most recent quarter at Braidwood Station Units 1 and 2 was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only reactor oversight process (ROP) baseline inspections at your facility through March 31, 2007.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through March 31, 2007. Significant inspections planned for this year include a Problem Identification and Resolution Inspection on October 2005, Temporary Instruction (TI) 2515/150, Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (Unit 1),

in April 2006, and a Triennial Fire Protection Inspection in July 2006. The inspection plan is provided to minimize the resource impact on your staff and to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.

Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review meeting.

C. Crane In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9620 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Richard A. Skokowski, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77

Enclosure:

Braidwood Station Inspection/ Activity Plan See Attached Distribution DOCUMENT NAME:G:\\Branch TSS\\ALL MOC\\midcycle 2004 to 2005\\MOC letters\\Brai.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII NAME RSkokowski:dtp DATE 08/26/05 OFFICIAL RECORD COPY

C. Crane cc w/encl:

Site Vice President - Braidwood Station Plant Manager - Braidwood Station Regulatory Assurance Manager - Braidwood Station Chief Operating Officer Senior Vice President - Nuclear Services Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing Manager Licensing - Braidwood and Byron Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission Will County Executive Will County Sheriff Director, Will County Emergency Management Agency Mayor of Joliet City of Joliet Kendall County Board Chairman Kendall County Sheriff Grundy County Board Chairman Grundy County Sheriff Grundy County Emergency Management Agency Mayor of Morris Village President Mayor of Coal City Mayor of Carbon Hill Mayor of Diamond Mayor of Braidwood Mayor of Wilmington Channahon Village President Channahon Village Administrator Mayor of Shorewood Shorewood Village Administrator Mayor of Elwood Mayor of Braceville Mayor of Kankakee INPO

C. Crane ADAMS Distribution:

GYS DWW Project Director, NRR Project Mgr., NRR RidsNrrDipmlipb JLC1 GEG KGO RML2 SRI Braidwood DRPIII DRSIII PLB1 JRK1

Braidwood Inspection / Activity Plan 09/01/2005 - 03/31/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/29/2005 10:58:37 Report 22 5

SSDPC

- SAFETY SYSTEM DESIGN & PERFORMANCE Baseline Inspections 08/15/2005 09/02/2005 Safety System Design and Performance Capability IP 7111121 1, 2 2

71111.11

- LIC OPERATOR REQUAL PROGRAM EVALUATION Baseline Inspections 09/12/2005 09/16/2005 Licensed Operator Requalification Program IP 7111111B 1, 2 3

PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 10/10/2005 10/28/2005 Identification and Resolution of Problems IP 71152B 1, 2 3

FY 2006

- BRAIDWOOD INIT PREP 03/2006 Not Applicable 03/27/2006 03/31/2006 BRAIDWOOD - APR/MAY 2006 W90143 1

2 ISI

- BRAIDWOOD UNIT 1 ISI & TI-150 INSPECTION Safety Issues 04/10/2006 04/27/2006 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA IP 2515/150 1

Baseline Inspections 04/10/2006 04/27/2006 Inservice Inspection Activities - PWR IP 7111108P 1

1 IP 71121

- ALARA, ACCESS CONTROL Baseline Inspections 04/17/2006 04/28/2006 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 04/17/2006 04/28/2006 ALARA Planning and Controls IP 7112102 1, 2 3

FY 2006

- BRAIDWOOD INIT EXAM 05/2006 Not Applicable 05/15/2006 05/19/2006 BRAIDWOOD - APR/MAY 2006 W90143 1

3 FPI

- FIRE PROTECTION INSPECTION Baseline Inspections 06/12/2006 06/30/2006 Fire Protection [Triennial]

IP 7111105T 1, 2 1

ROUTINE

- INSTRUMENTATION, ACCESS CONTROL Baseline Inspections 07/31/2006 08/04/2006 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 07/31/2006 08/04/2006 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 2

IP 71114

- EP EXERCISE BASELINE Baseline Inspections 08/07/2006 08/11/2006 Exercise Evaluation IP 7111401 1, 2 Baseline Inspections 08/07/2006 08/11/2006 Performance Indicator Verification IP 71151 1, 2 1

H/S

- HEAT SINK INSPECTION Baseline Inspections 09/25/2006 09/29/2006 Heat Sink Performance IP 7111107B 1, 2 2

ISI

- BRAIDWOOD UNIT 2 ISI & TI-150 INSPECTION Safety Issues 10/16/2006 11/03/2006 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA IP 2515/150 2

Baseline Inspections 10/16/2006 11/03/2006 Inservice Inspection Activities - PWR IP 7111108P 2

1 OUTAGE

- ACCESS CONTROL, ALARA Baseline Inspections 10/16/2006 10/20/2006 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 10/16/2006 10/20/2006 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 10/16/2006 10/20/2006 Performance Indicator Verification IP 71151 1, 2 1

PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 11/27/2006 12/15/2006 Identification and Resolution of Problems IP 71152B 1, 2 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Braidwood Inspection / Activity Plan 09/01/2005 - 03/31/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/29/2005 10:58:37 Report 22 1

71122.01

- RAD EFFLUENTS Baseline Inspections 02/12/2007 02/16/2007 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1, 2 Baseline Inspections 02/12/2007 02/16/2007 Performance Indicator Verification IP 71151 1, 2 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.