August 30, 2005 Mr. Thomas Palmisano Site Vice-President Prairie Island Nuclear Generating Plant Nuclear Management Company, LLC 1717 Wakonade Drive East Welch, MN 55089

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

PRAIRIE ISLAND NUCLEAR GENERATING PLANT

Dear Mr. Palmisano:

On August 9, 2005, the NRC staff completed its mid-cycle plant performance review of Prairie Island Nuclear Generating Plant, Units 1 and 2 for the first half of the calendar year 2005 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.

Plant performance for the most recent quarter at Prairie Island Nuclear Generating Plant Units 1 and 2 was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only reactor oversight process (ROP) baseline inspections at your facility through March 31, 2007.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through March 31, 2007. Significant inspections planned for this year include a Reactor Vessel Head Replacement Inspection in May 2006, Emergency Preparedness Exercise in June 2006, and a Triennial Fire Protection Inspection in September 2006. The inspection plan is provided to minimize the resource impact on your staff and to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review meeting.

T. Palmisano In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9620 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Richard A. Skokowski, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60

Enclosure:

Prairie Island Nuclear Generating Plant Inspection/ Activity Plan See Attached Distribution

DOCUMENT NAME:G:\Branch TSS\ALL MOC\midcycle 2004 to 2005\MOC letters\Prai.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII NAME Skokowski:dtp DATE 08/26/05 OFFICIAL RECORD COPY

T. Palmisano cc w/encl: C. Anderson, Senior Vice President, Group Operations J. Cowan, Executive Vice President and Chief Nuclear Officer Regulatory Affairs Manager J. Rogoff, Vice President, Counsel & Secretary Nuclear Asset Manager Tribal Council, Prairie Island Indian Community Administrator, Goodhue County Courthouse Commissioner, Minnesota Department of Commerce Manager, Environmental Protection Division Office of the Attorney General of Minnesota Council Administrator President, Prairie Island Tribal Council Goodhue County Sheriff Director, Pierce County Emergency Management Agency Chair, Pierce County Board of Commissioners Chair, Dakota County Board of Commissioners Mayor of Red Wing Director, Goodhue County Emergency Management Agency Chair, Goodhue County Board of Commissioners Pierce County Sheriff Dakota County Sheriff INPO

T. Palmisano ADAMS Distribution:

DWW MLC Project Director, NRR RidsNrrDipmlipb JLC1 GEG KGO RML2 SRI Prairie Island DRP III DRSIII PLB1 JRK1

Page 1 of 2 Prairie Island 08/29/2005 11:09:30 Inspection / Activity Plan Report 22 09/01/2005 - 03/31/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71111.11 - LIC OPERATOR REQUAL PROGRAM EVALUATION 2 1, 2 IP 7111111B Licensed Operator Requalification Program 10/03/2005 10/07/2005 Baseline Inspections INSPECT - TRANSPORTATION RAD WASTE 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 10/03/2005 10/07/2005 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 10/03/2005 10/07/2005 Baseline Inspections INSPECTI - ISFSI INSPECTION 2 1 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 11/01/2005 11/30/2005 Other Routine MOD - MOD/50.59 INSPECTION 2 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 03/06/2006 03/24/2006 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 03/06/2006 03/24/2006 Baseline Inspections MAINT - MAINTENANCE EFFECTIVENESS 1 1, 2 IP 7111112B Maintenance Effectiveness 03/20/2006 03/24/2006 Baseline Inspections BI - GASEOUS AND LIQUID EFFLUENTS 1 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 03/13/2006 03/17/2006 Baseline Inspections ME - MAINTENANCE EFFECTIVENESS 1 1, 2 IP 7111112B Maintenance Effectiveness 04/03/2006 04/07/2006 Baseline Inspections ISI - PRAIRIE ISLAND UNIT 1 ISI & HD FAB INSP 4 1 IP 71007 Reactor Vessel Head Replacement Inspection 05/08/2006 05/26/2006 Other Routine 1 IP 7111108P Inservice Inspection Activities - PWR 05/08/2006 05/26/2006 Baseline Inspections BI - OUTAGE ALARA AND ACCESS CONTROL 2 2 IP 7112101 Access Control to Radiologically Significant Areas 05/08/2006 05/12/2006 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 05/08/2006 05/12/2006 Baseline Inspections 7111401 - EP EXERCISE BASELINE 2 1, 2 IP 7111401 Exercise Evaluation 07/17/2006 07/21/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 07/17/2006 07/21/2006 Baseline Inspections FPI - TRIENNIAL FIRE PROTECTION INSPECTION 3 1, 2 IP 7111105T Fire Protection [Triennial] 07/31/2006 08/18/2006 Baseline Inspections INSPECTI - ISFSI INSPECTION 2 1 IP 2515/149 Mitigating Systems Performance Index Pilot Verification 08/01/2006 09/30/2006 Safety Issues BI - RAD INSTRUMENTATION 1 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 09/11/2006 09/15/2006 Baseline Inspections ISI - PRAIRIE ISLAND UNIT 2 ISI INSPECTION 2 2 IP 7111108P Inservice Inspection Activities - PWR 12/18/2006 12/31/2006 Baseline Inspections BI - OUTAGE ACCESS CONTROL AND ALARA 1 1 IP 7112101 Access Control to Radiologically Significant Areas 01/02/2007 01/06/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Prairie Island 08/29/2005 11:09:30 Inspection / Activity Plan Report 22 09/01/2005 - 03/31/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type BI - OUTAGE ACCESS CONTROL AND ALARA 1 1 IP 7112102 ALARA Planning and Controls 01/02/2007 01/06/2007 Baseline Inspections 71122.02 - TRANSPORTATION 1 1, 2 IP 7112202 Radioactive Material Processing and Transportation 02/12/2007 02/16/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.