August 30, 2005 Mr. Thomas Palmisano Site Vice-President Prairie Island Nuclear Generating Plant Nuclear Management Company, LLC 1717 Wakonade Drive East Welch, MN 55089
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
PRAIRIE ISLAND NUCLEAR GENERATING PLANT
Dear Mr. Palmisano:
On August 9, 2005, the NRC staff completed its mid-cycle plant performance review of Prairie Island Nuclear Generating Plant, Units 1 and 2 for the first half of the calendar year 2005 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.
Plant performance for the most recent quarter at Prairie Island Nuclear Generating Plant Units 1 and 2 was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only reactor oversight process (ROP) baseline inspections at your facility through March 31, 2007.
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through March 31, 2007. Significant inspections planned for this year include a Reactor Vessel Head Replacement Inspection in May 2006, Emergency Preparedness Exercise in June 2006, and a Triennial Fire Protection Inspection in September 2006. The inspection plan is provided to minimize the resource impact on your staff and to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review meeting.
T. Palmisano In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9620 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Richard A. Skokowski, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60
Enclosure:
Prairie Island Nuclear Generating Plant Inspection/ Activity Plan See Attached Distribution
DOCUMENT NAME:G:\\Branch TSS\\ALL MOC\\midcycle 2004 to 2005\\MOC letters\\Prai.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII NAME Skokowski:dtp DATE 08/26/05 OFFICIAL RECORD COPY
T. Palmisano cc w/encl:
C. Anderson, Senior Vice President, Group Operations J. Cowan, Executive Vice President and Chief Nuclear Officer Regulatory Affairs Manager J. Rogoff, Vice President, Counsel & Secretary Nuclear Asset Manager Tribal Council, Prairie Island Indian Community Administrator, Goodhue County Courthouse Commissioner, Minnesota Department of Commerce Manager, Environmental Protection Division Office of the Attorney General of Minnesota Council Administrator President, Prairie Island Tribal Council Goodhue County Sheriff Director, Pierce County Emergency Management Agency Chair, Pierce County Board of Commissioners Chair, Dakota County Board of Commissioners Mayor of Red Wing Director, Goodhue County Emergency Management Agency Chair, Goodhue County Board of Commissioners Pierce County Sheriff Dakota County Sheriff INPO
T. Palmisano ADAMS Distribution:
DWW MLC Project Director, NRR RidsNrrDipmlipb JLC1 GEG KGO RML2 SRI Prairie Island DRP III DRSIII PLB1 JRK1
Prairie Island Inspection / Activity Plan 09/01/2005 - 03/31/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/29/2005 11:09:30 Report 22 2
- LIC OPERATOR REQUAL PROGRAM EVALUATION Baseline Inspections 10/03/2005 10/07/2005 Licensed Operator Requalification Program IP 7111111B 1, 2 1
INSPECT
- TRANSPORTATION RAD WASTE Baseline Inspections 10/03/2005 10/07/2005 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 10/03/2005 10/07/2005 Radioactive Material Processing and Transportation IP 7112202 1, 2 2
INSPECTI
- ISFSI INSPECTION Other Routine 11/01/2005 11/30/2005 Operation of an Independent Spent Fuel Storage Installation at Operating Plants IP 60855.1 1
2 MOD
- MOD/50.59 INSPECTION Baseline Inspections 03/06/2006 03/24/2006 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2 Baseline Inspections 03/06/2006 03/24/2006 Permanent Plant Modifications IP 7111117B 1, 2 1
MAINT
- MAINTENANCE EFFECTIVENESS Baseline Inspections 03/20/2006 03/24/2006 Maintenance Effectiveness IP 7111112B 1, 2 1
BI
- GASEOUS AND LIQUID EFFLUENTS Baseline Inspections 03/13/2006 03/17/2006 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1, 2 1
ME
- MAINTENANCE EFFECTIVENESS Baseline Inspections 04/03/2006 04/07/2006 Maintenance Effectiveness IP 7111112B 1, 2 4
- PRAIRIE ISLAND UNIT 1 ISI & HD FAB INSP Other Routine 05/08/2006 05/26/2006 Reactor Vessel Head Replacement Inspection IP 71007 1
Baseline Inspections 05/08/2006 05/26/2006 Inservice Inspection Activities - PWR IP 7111108P 1
2 BI
- OUTAGE ALARA AND ACCESS CONTROL Baseline Inspections 05/08/2006 05/12/2006 Access Control to Radiologically Significant Areas IP 7112101 2
Baseline Inspections 05/08/2006 05/12/2006 ALARA Planning and Controls IP 7112102 2
2 7111401
- EP EXERCISE BASELINE Baseline Inspections 07/17/2006 07/21/2006 Exercise Evaluation IP 7111401 1, 2 Baseline Inspections 07/17/2006 07/21/2006 Performance Indicator Verification IP 71151 1, 2 3
FPI
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 07/31/2006 08/18/2006 Fire Protection [Triennial]
IP 7111105T 1, 2 2
INSPECTI
- ISFSI INSPECTION Safety Issues 08/01/2006 09/30/2006 Mitigating Systems Performance Index Pilot Verification IP 2515/149 1
1 BI
- RAD INSTRUMENTATION Baseline Inspections 09/11/2006 09/15/2006 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 2
- PRAIRIE ISLAND UNIT 2 ISI INSPECTION Baseline Inspections 12/18/2006 12/31/2006 Inservice Inspection Activities - PWR IP 7111108P 2
1 BI
- OUTAGE ACCESS CONTROL AND ALARA Baseline Inspections 01/02/2007 01/06/2007 Access Control to Radiologically Significant Areas IP 7112101 1
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Prairie Island Inspection / Activity Plan 09/01/2005 - 03/31/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/29/2005 11:09:30 Report 22 1
BI
- OUTAGE ACCESS CONTROL AND ALARA Baseline Inspections 01/02/2007 01/06/2007 ALARA Planning and Controls IP 7112102 1
1 71122.02
- TRANSPORTATION Baseline Inspections 02/12/2007 02/16/2007 Radioactive Material Processing and Transportation IP 7112202 1, 2 This report does not include INPO and OUTAGE activities.