ML052420040

From kanterella
Jump to navigation Jump to search

G20050601/LTR-05-0432 - Ltr. from John F. Kerry Re Concerns About Entergy Nuclears Request to Increase Output at Vermont Yankee Power Plant by 20% (Susan Klein-Bernett)
ML052420040
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 08/12/2005
From: Kerry J
US SEN (Senate)
To: Diaz N
NRC/Chairman
Shared Package
ML052430394 List:
References
G20050601, LTR-05-0432
Download: ML052420040 (5)


Text

EDO Principal Correspondence Control FROM:

DUE: 09/19/05 EDO CONTROL: G20050601 DOC DT: 08/12/05 FINAL REPLY:

Sen. John F. Kerry Chairman Diaz FOR SIGNATURE OF :

    • GRN CRC NO: 05-0432 Reyes, EDO DESC:

ROUTING:

Concerns about Entergy Nuclear's Request to Increase Output at Vermont Yankee Ncuclear Power Plant by 20% (Susan Klein-Bernett)

DATE: 08/29/05 Reyes Virgilio Kane Silber Dean Cyr/Burns Collins, RI ASSIGNED TO:

NRR CONTACT:

Dyer SPECIAL INSTRUCTIONS OR REMARKS:

Prepare response to Sen. Kerry with a cc: to constituent.

Address response to the Senator's Massachusetts address.

I em see; - O i 7 526-s -a l0

OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed: Aug 26,2005 15.34 PAPER NUMBER:

ACTION OFFICE:

LTR-05-0432 EDO LOGGING DATE: 08/26/2005 AUTHOR:

AFFILIATION:

ADDRESSEE:

SUBJECT:

SEN John Kerry CONG Nils Diaz Concerns about Entergy's Nuclear's request to increase outpout at Vermont Yankee nuclear power plant by 20%

ACTION:

DISTRIBUTION:

LETTER DATE:

ACKNOWLEDGED SPECIAL HANDLING:

Signature of EDO Chairman, Comrs, OCA to Ack 08/12/2005 No NOTES:

FILE LOCATION:

ADAMS DATE DUE:

09/19/2005 DATE SIGNED:

  • ./

EDO -- C020050601

JOHN KERRY MASSACHUSETTS COMMITTEES:

COMMERCE, SCIENCE.

AND TRANSPORTATION FINANCE FOREIGN RELATIONS SMALL BUSINESS lUnSited bitNeCs 205102at2 WASHINGTON, DC 20510-2102 One Bowdoin Square Tenth Floor Boston, MA 02114 (617) 565-8519

__-August 12, 2005 Dr. Nils J. Diaz, Ph.D.

Chairman U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Dr. Diaz,

I am forwarding to you a copy of a correspondence from Ms. Susan Klein - Bernett expressing her concerns about Entergy Nuclear's request to increase output at Vermont Yankee Nuclear Powver Plant by 20%.

It is the desire of this office to be responsive to all inquiries and communications. I respectfully ask for your assistance in resolving the issues outlined in the attached correspondence.

In addition to sending a reply to Ms. Klein -Bernett, please convey a copy of your response to the issues raised in Ms. Klein-Bernett's correspondence to Tyke Crowley of my Boston office.

I thank you for your cooperation in this matter.

X nt;-

Enclosures:

Ms. Klein - Bernett's correspondence JFK/fbc httplv senate.goW-&erryl 11

 ItZf.

United States PRIN<TED ON RECYCLED PAPER

A/

IfI 1 / /

g6' K lo AJaWm

&4/2/ I 61

(

1I

I XAal Av ha, "12* ZM

+)/Gaw A

A3 Aa pee ly b i/

A&6 7

g a~

Ce el M

'4'I I

A 2&/

6o e

71

eat7, aL-4

I -

I -

'1 1:.

/K

/ f( SAg7rci St, bI~r/8l A o,'r°6 l

. A.

~~~'

\\& 01 AUG A

\\hi1)0 a>

o W *

 k- "r%

.ig-t-

.h- /-

m

'Al d

A}2

\\

/0~/[

+15-4/74 D2 /t Tlingit sculptures USA37 A