ML052370318

From kanterella
Jump to navigation Jump to search
Fitness for Duty Program Performance Data Report for Period January 1, 2005 Through June 30, 2005
ML052370318
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/16/2005
From: Korsnick M
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML052370318 (3)


Text

Maria Korsnick 1503 Lake Road Vice President Ontario, New York 14519-9364 585.771.3494 585.771.3943 Fax maria.korsnick@ constellation.com

'Constellation Energy R.E. Ginna Nuclear Power Plant August 16, 2005 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk

SUBJECT:

R.E. Ginna Nuclear Power Plant Docket No. 50-244 Fitness for Dutv Program Performance Data Renort In accordance with the requirements set forth in 10 CFR 26.71(d), R.E. Ginna Nuclear Power Plant, LLC has compiled and is submitting the enclosed semi-annual Fitness for Duty (FFD) Program Performance Data Report covering the period January 1, 2005 through June 30, 2005.

Very truly yours, Mary G. Korsnick Enclosure cc: S. J. Collins, NRC P. D. Milano, NRC Resident Inspector, NRC

_AOA;)1 10 F23-7

Fitness for Duty Program Performance Data Personnel Subject to 10 CFR Part 26 CONSTELLATION ENERGY-GROUP ,' 06/30/200 company . .6 Months Ending

.E.Ginnha Nuclear PoePan  ;-many Z.- di ;

Tammy L.,Huffer, Fitness for DutyAdministrator (585) 771-5285l

Contact Name Phone)

' F .; ' . '  ; ',' , ' , ,.  :', ,:. ' i" , .' n ' " ^:i .

CUTOFFS: ScreenlConfirmation (ngIml) [X] Appendix A to 10 CFR Part 26 Marijuana 50/15 Amphetamines Cocaine Phenc clidine Opiates Alcohol (% BAC)

Annual (Jan-Dec) Random testing rates: Employees & Contractors by 50%.

,. Long-term Short-term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with .436 128 241 Unescorted Access Categories Tested Positive - Tested Positive Tested Positive Pre-Access 5 l O . 12 0 606 8 For Cause Post-accident 1 0 0 0 2 0 Observed Behavior 0 0 0 3 1 Random 118 0 46 1 66 1 Follow-up 4 0 10 0 14 0 Other* 0 ,0; 0 0 9 0 TOTAL -127 ;1

,700 0 8 0;,

'. ;V~ 4' -' -S .ss -

Long Tenrn Contractors: Wackenhut security.And fire~brigade

  • Primarily refers to tests conducted for samples that were hydrated (diluted).
    • The total number of positives on this page diffeirsfrom' the breakdown on the next page due to 2 individuals testing positive for both marijuana and cocaine.

2 steroid tests were also conducted on an individual per MRO recommendation. Both test results were negative. They are not included in the above count as they are not NRC mandated tests.

Visitor testing:

3 Odor of alcohol:

I: Negative, Allowed to proceed on site

2. .008, Held in FFD until result was0.00 then allowed to return to work.
3. Positive, Not allowed on site. Placed on the Ginna denial list.

5 possession of alcohol tests: All tested negative andyreturned to work after the breath test.

.. .  :. .4 4

BREAKDOWN OF CONFIRMED POSITIVE TESTS FOR SPECIFIC SUBSTANCES Marijuana Cocaine Opiates tAmphe-tamines lidineToa Alcohol Phency- Refusal Total to test Licensee .

Employees 0 0 0 0 0 0 0 0 Long-Term Contractors 0 1 0 . .0 0 0 0 1 Short-Term Contractors 8 3 0 O 0 1 0 12*

TOTAL<h.- - 8 . -' 02 ' M: 0I 1: . 13°*-

All individuals were denied unescorted access 'after their positive test results were confirmed.

  • The total number of positives on this page differs from the breakdown on the previous page due to 2 individuals testing positive for both marijuana and cocaine.

NRC Reportable Events (Per 10CFR Part 26.73)

There were no reportable events during this performance data period.