ML052290315
| ML052290315 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 08/15/2005 |
| From: | Bezilla M FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 3180 | |
| Download: ML052290315 (1) | |
Text
-
FENOC i
.5501 North State Route 2 FtrstEnergy Nuclear Operating Company Oak Harbor. Ohio 43449 Mark B. Bezilla SF uAD Nrl¶Tih3419-321-7676 Vice President-Nuclear SAFEGUARDS INFORMATION Fax419-321-7582 WHEN SEPARATED FROM ATTACHMENT 2, HANDLE THIS DOCUMENT AS DECONTROLLED Docket Number 50-346 License Number NPF-3 Serial Number 3180 1 OCFR50.54(p)
August 15, 2005 United States Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555-0001
Subject:
Physical Security Plan (Revision 1)
Ladies and Gentlemen:
In accordance with provisions of 1 OCFR50.54(p), the Davis-Besse Nuclear Power Station (DBNPS) hereby submits the Physical Security Plan, Revision I (Attachment 2). A report of the changes made is attached with the revised plan. contains Safeguards Information and pursuant to I OCFR73.21 is to be withheld from public disclosure.
Should you have any questions or require additional information, please contact Mr. Clark A. Price, Manager, Regulatory Compliance, at (419) 321-8585.
Very truly yours, AWB/s Attachments cc:
Regional Administrator, NRC Region III DB-I NRC/NRR Project Manager (w/o Attachment 2)
DB-1 NRC Senior Resident Inspector (w/o Attachment 2)
Utility Radiological Safety Board (w/o Attachment 2)
SAFEGUARDS INFORMATION WHEN SEPARATED FROM ATTACHMENT 2, HANDLE THIS DOCUMENT AS DECONTROLLED
) X,*