Final As-Administered JPM RO-B.2-09 for the Palisades Initial Examination - May 2005
ML052240160
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/23/2005
From: Palagi B
NRC/RGN-III/DRS/OLB
To:
Nuclear Management Co
Shared Package
ML051930236 List:
References
50-255/05-301 50-255/05-301
Download: ML052240160 (14)


Text

FINAL AS-ADMINISTERED JPM RO-6.2-09 FOR THE PALISADES INITIAL EXAMINATION - MAY 2005

JPM RO-B.2-09 REGION 111 INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE JPM RO-6.2-09 Operate P-55C from Bus 13 CANDIDATE:

EXAMINER:

Page 1 of 9

JPM RO-6.2-09 REGION 111 INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Alternate Path: NONE Facility JPM #:

TBAM 03 (Modified)

Operate P-55C from Bus 13 WA Rating:

022AA1.01 Importance:

SRO 3.3 RO 3.4 WA Statement: Ability to operate and I or monitor the followino as they apply to the Loss of Reactor Coolant Pump Makeup: CVCS letdown and charoinq Task Standard: Charqino Pump P-55C is alioned to LCC-13.

Preferred Evaluation Location:

Simulator In Plant X

Preferred Evaluation Method:

Perform Simulate X

References:

SOP-2A. Chemical and Volume Control System Validation Time:

25 minutes Time Critical:

NO Candidate:

Time Start:

Time Finish:

Performance Time:

minutes Performance Rating:

SAT UNSAT Comments:

Examiner:

Date:

Signature Page 2 of 9

JPM RO-6.2-09 ToolslEquipmenVProcedures Needed:

SOP9A, Section 7.1.3. After candidate describes where and which procedure would be obtained, provide a copy to candidate.

READ TO OPERATOR DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

The Control Room is NOT habitable. Load Center 11 is NOT available. P-55A and P-55B are NOT available. P-55C was powered from LCC 11 and is NOT operating.

INITIATING CUES:

During the performance of ONP 25.2, "Alternate Safe Shutdown Procedure", the Shift Supervisor directs you to operate P-55C from Bus 13, referring to SOPQA, "Chemical and Volume Control System," Section 7.1.3.

Page 3 of 9

JPM RO-B.2-09 START TIME:

STEP 1:

Obtains current procedure STANDARD:

NOTES:

COMMENTS:

Obtains copy of SOP-2A, Section 7.1.3 STEP 2:

STANDARD:

Ensure P-55C not operating Determines P-55C not operating by observing green OPEN flag is showing on breaker 52-1 105 Cue: Green OPEN flag is showing.

NOTE: This was also provided in INITIAL CONDITIONS, so candidate may not check this.

NOTES:

COMMENTS:

  • STEP 3:

Rack out breaker 52-1 105 to disconnect position STANDARD:

NOTES:

Attaches racking tool and racks out breaker 52-1 105 Critical step to allow power to be aligned to alternate source.

Cue: Breaker 52-1 105 is racked out to disconnect.

COMMENTS:

Page 4 of 9 SAT UNSAT SAT UNSAT CRlTlCA L STEP SAT UNSAT

JPM RO-B.2-09

'STEP 4:

Ensure open and rack breaker 52-1308 into connect position and leave open STANDARD:

Observes green OPEN flag showing on breaker 52-1308, attaches racking tool, and racks into connect position NOTES:

Critical step to allow power to be aligned to alternate source.

Cue: Breaker 52-7308 has the green OPEN flag showing and is racked Into connect position.

COMMENTS:

~

~~

~~

STEP 5:

STANDARD:

Ensure OFF breaker 52-1 3086 At JL255 in charging pump room, verifies 52-13086 is OFF Cue: Breaker 52-13088 is OFF.

NOTES:

COMMENTS:

CRlTlCA L STEP SAT UNSAT SAT UNSAT Page 5 of 9

JPM RO-B.2-09

'STEP 6:

Place to ON breaker 52-1 308A STANDARD:

At JL255 in charging pump room, places breaker 52-1308A to ON position Critical step to allow power to be aligned to alternate source.

Cue: Breaker52-1308A is ON.

NOTES:

COMMENTS:

  • STEP 7:

Place to OFF breaker 52-1 105A STANDARD:

At JL257 in charging pump room, places breaker 52-1 105A to OFF position NOTES:

Critical step to allow power to be aligned to alternate source.

Cue: Breaker 52-1 105A is OFF.

COMMENTS:

CRlTlCA L STEP SAT UNS CRITICAL STEP SAT UNSAT Page 6 of 9

JPM RO-B.2-09

  • STEP 8:

Place to ON breaker 52-1 1053 STANDARD:

At JL257 in charging pump room, places breaker 52-1 1056 to ON position NOTES:

Critical step to allow power to be aligned to alternate source.

Cue: Breaker 52-1 1058 is ON.

COMMENTS:

STEP 9:

Place Seal Coolant Pump Control Switch for P-55C in HAND Places switch in HAND position Cue: The seal coolant pump is running.

If discharge pressure checked, provide cue that it is approximately 20 psi.

STANDARD:

NOTES:

COMMENTS:

CRITICAL STEP SAT UNSAT SAT UNSAT Page 7 of 9

JPM RO-B.2-09

'STEP 1 O:

Test operate breaker 52-1 308 to start and stop P-55C to ensure proper breaker operation Closes breaker 52-1308, verifying red CLOSED flag showing, then opens breaker 52-1 308, verifying green OPEN flag showing Cue: When closing 52-1308, the red CLOSED flag is showing.

When opening 52-1308, the green OPEN flag is showing.

STANDARD:

NOTES:

COMMENTS:

STEP 11 :

Notify Shift Supetvisor that P-55C is aligned to LCC-13 STANDARD:

Notifies Shift Supervisor NOTES:

CUE: If asked, tell candidate to leave P-55C OFF.

COMMENTS:

END OF TASK STOP TIME:

CRITICAL STEP SAT UNSAT SAT UNSAT Page 8 of 9

JPM RO-B.2-09 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

The Control Room is NOT habitable. Load Center 11 is NOT available. P-55A and P-556 are NOT available. P-55C was powered from LCC 11 and is NOT operating.

INITIATING CUES:

During the performance of ONP 25.2, "Alternate Safe Shutdown Procedure", the Shift Supervisor directs you to operate P-5% from Bus 13, referring to SOPQA, "Chemical and Volume Control System," Section 7.1.3.

Page 9 of 9

PALISADES NUCLEAR PLANT SYSTEM OPERATING PROCEDURE TITLE: CHEMICAL AND VOLUME CONTROL SYSTEM Proc No SOP-2A Revision 57 Page14of 114 7.1.3 To Transfer P-55B (or P-55C) from Normal Power Supply to Bus 13 NOTE:

Operation of molded case breakers and load control center breakers locally is a Hazard Category 0 requiring 100% natural fabric.

CAUTION All interlocks and permissive features are lost while operating the pump on the alternate power supply.

a.

Refer to System Operating Procedure SOP-30, "Station Power," for all load center breaker racking operations in this section.

To supply P-556 power from Bus 13, PERFORM the following:

1.

ENSURE P-556 not operating.

2.
3.

e

b.

RACK OUT breaker 52-1206 to DISCONNECT position.

ENSURE OPEN AND RACK breaker 52-1308 into CONNECT position AND LEAVE OPEN.

At JL255 in charging pump room:

(a)

ENSURE OFF breaker 52-1308A.

(b)

PLACE to ON breaker 52-13086.

At JL256 in charging pump room:

(a)

(b)

4.
5.

PLACE to OFF breaker 52-1206A.

PLACE to ON breaker 52-12066.

NOTE:

Seal Lube Pump is not required for emergency operations.

6.
7.

PLACE in HAND Seal Lube Pump Control Switch for P-55B.

Test operate breaker 52-1308 to start and stop P-556 to ensure proper breaker operation.

OPERATE breaker 52-1308 to start and stop P-558 as needed.

8.

PALISADES NUCLEAR PLANT Proc No SOP-2A Page 15 of 114 SYSTEM OPERATING PROCEDURE Revision 57 TITLE: CHEMICAL AND VOLUME CONTROL SYSTEM

c.

To supply P-55C power from Bus 13, PERFORM the following:

1.

ENSURE P-55C not operating.

2.
3.

RACK OUT breaker 52-1 105 to DISCONNECT position.

ENSURE OPEN AND RACK into CONNECT position breaker 52-1308 AND LEAVE OPEN.

At JL255 in charging pump room:

(a)

ENSURE OFF breaker 52-13086.

(b)

PLACE to ON breaker 52-1308A.

At JL257 in charging pump room:

(a)

(b)

4.
5.

PLACE to OFF breaker 52-1 105A.

PLACE to ON breaker 52-1 105B.

NOTE:

Seal Lube Pump is not required for emergency operations.

6.
7.

PLACE in HAND Seal Lube Pump Control Switch for P-55C.

Test operate breaker 52-1308 to start and stop P-55C to ensure proper breaker operation.

OPERATE breaker 52-1308 to start and stop P-55C as needed.

8.

TASK MATRIX Task Operating breakers (door closed)

Operating breakers (door open)

Racking Load Center breakers Racking Load Center breakers Diagnostic testing (door closed)

(door open) verifying voltage verifyinq current Proc No 8.10 Revision 1 Page 6 of 7 HazardlRis k Cateaory Refer to (0)

(1)

(2)

(3)

(2')

SwitchgeadLoad Centers (600V or Less)

Opening hinged covers to expose live Boundaries:

Flash protection bOundary - 10 feet for (racking) of breakers, 4 feet for other activities EXCEPTION: (engineering arc flash calculations have been performed for these specific areas):Plant 480 VAC MCCslLCCs ALL activities: 4 FEET Limited Approach (Unqualified Emplovees) - 3 feet 6 inches (2) a installing/removing test equipment I Workina on Control Circuits while within I (2*)

the restricted approach boundary of exposed energized parts

>I 20VAC/I25VDC Working on Control Circuits while within the restricted approach boundary of exposed energized parts 120VAC/I 25VDC or below Working on energized parts Removing bolted covers to expose live (2')

Rated Tools Gloves See Note 8 a shock or flash hazard I Flash Protection Fatiric FR Clothing Arc Face Shield FR Clothing Arc Face Shield Flash Suit Switching Hood

' FR Clothing Arc Face Shield See Note 12 FR Clothing Switching Hood 100% Natural Fabric FR Clothing Switching Hood FR Clothing Switching Hood FR Clothing Switching Hood FR Clothing Arc Face Shield parts (line voltage)

Proc No 8.10 Revision 1 Page 1 of 3 EXAMPLES OF ARC PROTECTIVE APPAREL NOTE:

The tables below depict the minimum calorie requirements required for arc flash protection for various Hazard Categories per NFPA 70E. Personnel should be familiar with the process of layering clothing, natural and FR, to achieve the desired calorie (equirements for arc flash protection.

100% natural cotton denim pants of average weight satisfies the 4 calorie requirement.

The site has purchased specific kits with FR clothing that exceeds the minimum I

Protective Clothing and Personal Protective Equipment