ML052240113

From kanterella
Jump to navigation Jump to search

Tech Spec Pages for Amendment 225 Regarding Relocation of Certain Refueling Technical Specifications to the Technical Requirements Manual
ML052240113
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/11/2005
From:
NRC/NRR/DLPM
To:
References
TAC MC6915
Download: ML052240113 (6)


Text

INDEX LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS SECTION AGE 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES Operating.....

3/4 8-1 DELETED.....

3/4 8-9 Shutdown.....

3/4 8-10 3/4.8.2 D.C. SOURCES Operating....

3/4 8-11 TABLE 4.8-2a BATTERY SURVEILLANCE REQUIREMENTS.3/4 8-13 TABLE 4.8-2b BATTERY CHARGER CAPACITY.3/4 8-14 Shutdown.34 8-15 3/4.8.3 ONSITE POWER DISTRIBUTION Operating.3/4 8-16 Shutdown.3/4 8-18 3/4.8.4 ELECTRICAL EQUIPMENT PROTECTIVE DEVICES DELETED................................................................................................3/4 8-19 DELETED................................................................................................3/4 8-21 DELETED.3/4 8-22 3/4.9 REFUELING OPERATIONS 3/4.9.1 BORON CONCENTRATION.3/4 9-1 3/4.9.2 INSTRUMENTATION..................................................................................3/4 9-2 3/4.9.3 DECAY TIME.3/4 9-3 3/4.9.4 CONTAINMENT BUILDING PENETRATIONS........................................3/4 9-4 3/4.9.5 DELETED.

3/4 9-5 MILLSTONE - UNIT 3 xi Amendment No. 64, 4I 4, 4,94, 225

INDEX LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS SECTION PAGE 3/4.9.6 DELETED.............................

3/4 9-6 3/4.9.7 DELETED.....................

3/4 9-7 3/4.9.8 RESIDUAL HEAT REMOVAL AND COOLANT CIRCULATION High Water Level.

3/4 9-8 Low Water Level..............

3/4 9-9 3/4.9.9 DELETED......

3/4 9-10 3/4.9.10 WATER LEVEL -REACTORVESSEL...........................

3/49-11 3/4.9.11 WATER LEVEL - STORAGE POOL.........................

. 3/4 9-12 3/4.9.12 DELETED......

3/4 9-13 3/4.9.13 SPENT FUEL POOL -REACTIVITY.

3/49-16 3/4.9.14 SPENT FUEL POOL - STORAGE PATTERN.3/4 9-17 FIGURE 3.9-1 MINIMUM FUEL ASSEMBLY BURNUP VERSUS NOMINAL INITIAL ENRICHMENT FOR REGION I 4-OUT-OF-4 STORAGE CONFIGURATION............................................................3/4 9-18 FIGURE 3.9-2 REGION 1 3-OUT-OF-4 STORAGE FUEL ASSEMBLY LOADING SCHEMATIC.3/4 9-19 FIGURE 3.9-3 MINIMUM FUEL ASSEMBLY BURNUP VERSUS NOMINAL INITIAL ENRICHMENT FOR REGION 2 STORAGE CONFIGURATION....................

3/4 9-20 FIGURE 3.9-4 MINIMUM FUEL ASSEMBLY BURNUP AND DECAY TIME VERSUS NOMINAL INITIAL ENRICHMENT FOR REGION 3 STORAGE CONFIGURATION.....................

............................... 3/4 9-21 I

3/4.10 SPECIALTESTEXCEPTIONS 3/4.10.1 SHUTDOWNMARGIN......................

3/410-1 3/4.10.2 GROUP HEIGHT, INSERTION, AND POWER DISTRIBUTION LIMITS 3/4 10-2 3/4.10.3 PHYSICS TESTS.....................

3/4 10-4 3/4.10.4 REACTOR COOLANT LOOPS.3/4 10-5 3/4.10.5 DELETED 3/4.11 DELETED 3/4.11.1 DELETED 3/4.11.2 DELETED 3/4.11.3 DELETED MILLSTONE - UNIT 3 xii Amendment No. 39, 89,48,4-89, 20,

24i, 49, 225

INDEX BASES SECTION PAGE 3/4.7.11 DELETED...............................................

B 3/4 7-25 3/4.7.12 DELETED 3/4.7.13 DELETED 3/4.7.14 AREA TEMPERATURE MONITORING...............................................

B 3/4 7-25 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1, 3/4.8.2, and 3/4.8.3 A.C. SOURCES, D.C. SOURCES, AND ONSITE POWER DISTRIBUTION........................

....................... B 3/4 8-1 3/4.8.4 DELETED...............................................

B 3/4 8-3 314.9 REFUELING OPERATIONS 3/4.9.1 BORON CONCENTRATION.B 3/4 9-1 3/4.9.2 INSTRUMENTATION.B 3/4 9-1 3/4.9.3 DECAY TIME.B 3/4 9-1 3/4.9.4 CONTAINMENT BUILDING PENETRATIONS.B 3/4 9-1 3/4.9.5 DELETED.B 3/4 9-1 3/4.9.6 DELETED.B 3/4 9-2 3/4.9.7 DELETED.B 3/4 9-2 3/4.9.8 RESIDUAL HEAT REMOVAL AND COOLANT CIRCULATION B 3/4 9-2 3/4.9.9 DELETED

.B 3/4 9-7 3/4.9.10 and 3/4.9.11 WATERLEVEL-REACTORVESSELAND STORAGE POOL.B 3/4 9-8 3/4.9.12 DELETED......................................

B 3/4 9-8 3/4.9.13 SPENT FUEL POOL - REACTIVITY.............

......................... B 3/4 9-8 3/4.9.14 SPENT FUEL POOL - STORAGE PATTERN......................................

B 3/4 9-8 314.10 SPECIAL TEST EXCEPTIONS 3/4.10.1 SHUTDOWN MARGIN.B 3/4 10-1 3/4.10.2 GROUP HEIGHT, INSERTION, AND POWER DISTRIBUTION LIMITS.

B 3/4 10-1 3/4.10.3 PHYSICS TESTS.B 3/4 10-1 3/4.10.4 REACTOR COOLANT LOOPS.B 3/4 10-1 3/4.10.5 DELETED

.B 3/4 10-1 MILLSTONE - UNIT 3 xv Amendment No. 84,89,40, 4107, 49, 4-36,4S9,492,2&

0

,44,249, 225

THIS PAGE INTENTIONALLY LEFT BLANK MILLSTONE - UNIT 3 3/4 9-5 Amendment No. 225

THIS PAGE INTENTIONALLY LEFT BLANK MILLSTONE - UNIT 3 3/4 9-6 Amendment No. 225

T1IS PAGE INTENTIONALLY LEFT BLANK MILLSTONE - UNIT 3 3/4 9-7 Amendment No. 1,

%, 225