Transmittal of Technical Report NE-1454, Rev. 0, Surry Unit 2, Cycle 20 Startup Physics Tests Report
ML052220497
Person / Time
Site: Surry Dominion icon.png
Issue date: 08/10/2005
From: Funderburk C
Virginia Electric & Power Co (VEPCO)
To:
NRC/RGN-II
References
05-521
Download: ML052220497 (2)


Text

VIRGINIA ELECTRIC AND POWER COMPANY

RICHMOND, VIRGINIA 2326 1 August 10, 2005 Regional Ad mi nistrator U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, S. W., Suite 23 T85 Atlanta, Georgia 30303-8931 Serial No.05-521 N LOS/vI h Docket No. 50-281 License No. DPR-37 As required by Surry Technical Specification 6.6.A.1, enclosed is the Virginia Electric and Power Company (Dominion) Technical Report NE-1454 Revision 0, entitled Surry Unit 2, Cycle 20 Startup Physics Tests Report. This report summarizes the results of the physics testing program performed after the initial criticality of Cycle 20 on May 22, 2005.

The results of the physics tests were within the applicable Technical Specification limits.

If you have any questions or require additional information, please contact Mr. Gary Miller at (804) 273-2771.

Very truly yours,

--e.

t. Funderburk, Director Nuclear Licensing and Operations Support Dominion Resources Services, Inc.

for Virginia Electric and Power Company Enclosure Commitment Summary: There are no new commitments as a result of this letter.

Serial No.05-521 Docket No. 50-281 Page 2 of 2 cc:

U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555-0001 Mr. R. E. Martin NRC Lead Project Manager - North Anna and Surry U. S. Nuclear Regulatory Commission One White Flint North 1 1555 Rockville Pike Mail Stop 8G9A Rockville, Maryland 20852 Mr. S. R. Monarque U. S. Nuclear Regulatory Commission One White Flint North 1 1555 Rockville Pike Rockville, Maryland 20852-2738 Mr. N. P. Garrett NRC Senior Resident Inspector Surry Power Station