Requalification Program Inspection, Fermi
ML052210307
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 08/05/2005
From: Hironori Peterson
Division of Reactor Safety III
To: O'Connor W
Detroit Edison
References
Download: ML052210307 (8)


Text

August 5, 2005 Mr. William OConnor, Jr.

Vice President Nuclear Generation Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION

Dear Mr. OConner:

In a conversation on August 5, 2005, Mr. A. Mann, General Supervisor Operations Training and Mr. M. Bielby, Lead Inspector, made arrangements for the NRC to inspect the licensed operator requalification program at the Fermi Power Plant. The inspection is planned for the week of October 24, 2005, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the written examinations and operating tests scheduled for the week of the inspection to the NRC by October 14, 2005. Additionally, to facilitate the efficient conduct of this inspection, please have available on site for review, the documents listed in the enclosure. Mr. Mann has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2006.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503-0001.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

W. OConnor In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact M. Bielby at 630-829-9762, or me at 630-829-9707.

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-341 License No. NPF

Enclosure:

Documentation Requested to be Available Onsite During the Inspection Week cc w/encl:

N. Peterson, Manager, Nuclear Licensing D. Pettinari, Legal Department Compliance Supervisor G. White, Michigan Public Service Commission L. Brandon, Michigan Department of Environmental Quality -

Waste and Hazardous Materials Division Monroe County, Emergency Management Division Planning Manager, Emergency Management Division MI Department of State Police E. Kokosky, Training Department

W. OConnor In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact M. Bielby at 630-829-9762, or me at 630-829-9707.

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-341 License No. NPF

Enclosure:

Documentation Requested to be Available Onsite During the Inspection Week cc w/encl:

N. Peterson, Manager, Nuclear Licensing D. Pettinari, Legal Department Compliance Supervisor G. White, Michigan Public Service Commission L. Brandon, Michigan Department of Environmental Quality -

Waste and Hazardous Materials Division Monroe County, Emergency Management Division Planning Manager, Emergency Management Division MI Department of State Police E. Kokosky, Training Department DOCUMENT NAME: ML052210307.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME MBielby:co HPeterson DATE 08/05/05 08/05/05 OFFICIAL RECORD COPY

W. OConnor ADAMS Distribution:

LXR1 NKR RidsNrrDipmIipb GEG KGO SJC4 DRPIII DRSIII PLB1 JRK1 DCT M. A. Bies, DRS

DOCUMENTATION REQUESTED TO BE AVAILABLE ONSITE DURING THE INSPECTION WEEK Training and Operations organization chart and site phone book Technical Specifications/License Operator Requalification Training (LORT) program procedures/Conduct of Operations administrative procedures Current cycle crew and individual examination evaluations for weeks prior to the exam week inspection Sample Plan (Master List) for this years annual examination and how derived The 24-month training plan for the training current cycle Attendance records for LORT Applicants pass/fail results for written exams, individual operating tests and simulator operating tests for each requalification cycle Records related to remediation of recent annual exam failures, and any past failures over the last two years Complete Annual Exam Schedule illustrating operating and staff crews: names, positions, dates, and times for exam administration LORT related condition reports written in the last year Reports related to NRC performance indicators - e.g., safety system failures, transients, scrams, risk important scrams The last QA audit that evaluated your requalification program Any operations and LORT self assessments done during the two year training cycle Operator, instructor, management feedback during the two year training cycle Curriculum review committee meeting minutes for past training year Proficiency watch list for active/reactivated licenses, including procedure for how you keep track of proficiency watches and license restrictions Access to complete licensed operator medical records Lesson plan(s) addressing: Plant Events/LERs/SOERs/Mods/Lessons Learned Enclosure

Applicable ANSI 3.5 Standard for simulator fidelity Simulator evaluations for any EOP operator response time(s) based on UFSAR time limits performed during the two year cycle (e.g., SGTR...)

Simulator open items list and performance indicators Simulator management and configuration control procedure(s)

List of open simulator discrepancies List of closed simulator discrepancies for the last 12 months.

Simulator performance tests: Transient, Malfunction, Core Performance, Normal Plant Evolution, Operator Conducted Surveillance...including applicable plots/trends Enclosure