ML052200497
ML052200497 | |
Person / Time | |
---|---|
Site: | Fermi |
Issue date: | 07/26/2005 |
From: | Detroit Edison |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
Download: ML052200497 (14) | |
Text
%
DETROIT EDISON - FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 07/26/05 To: 00935~
US NRC PAGE 1 DOCUMENT CNTRL DESK WASHINGTON, DC 20555 Media: 8 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lvl Date Sec Status TMTRM TRM VOL I 75 1 IR 07/26/05 AFC Please destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.
Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.
Ref: cb14612 A°SoI
LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 75 dated 7/26/05 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.
Destroy the removed pages. Be sure that Revision 74 has been inserted prior to inserting these pages.
Location Remove Insert In Front of TRM Manual Title Page Rev 74 2/17/05 Title Page Rev 75 7/26/05 Immediately following List of Effective Pages List of Effective Pages Title Pagc LEP-1 through LEP- 4 Rev 74 2/17/05 - LEP-1 through LEP- 4 Rev 75 7/26/05 3.12 Fire Protection Page TRM 3.12-1 Rev 31 Page TRM 3.12-1 Rev 75 Page TRM 3.12-13 Rev 31 Page TRM 3.12-13 Rev 75 Page TRM 3.12-16 Rev 31 Page TRM 3.12-16 Rev 75 Page TRM 3.12-18 Rev 31 Page TRM 3.12-18 Rev 75 Page TRM 3.12-20 Rev 31 Page TRM 3.12-20 Rev 75 Page TRM 3.12-26 Rev 31 Page TRM 3.12-26 Rev 75 Pace TRM 3.12-29 Rev 31 Page TRM 3.12-29 Rev 75 END
Fermi 2 Technical Requirements Manual Volume I Detroit Edison ARMS - INFORMATION DTC: TMTRM l File: 1754 1DSN: TRM VOL I l Rev: 75 Date 7/26/05 Recipient 935
t FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM Revision 31 TRM 3.3-31 Revision 31 TRM Revision 73 TRM 3.3-32 Revision 31 iv TRM iii Revision 31 TRM 3.3-33 Revision 31 TRM iv Revision 34 TRM 3.3-34 Revision 31 TRM v Revision 70 TRM 3.3-35 Revision 60 TRM Vi Revision 31 TRM 3.3-36 Revision 41 TRM 1.0-a Revision 31 TRM 3.3-37 Revision 72 TRM 1.0-1 Revision 31 TRM 3.3-38 Revision 31 TRM 2.0-1 Revision 31 TRM 3.3-39 Revision 31 TRM 3.0-a Revision 31 TRM 3.3-40 Revision 56 TRM 3.0-1 Revision 63 TRM 3.3-41 Revision 56 TRM 3.0-2 Revision 72 TRM 3.3-42 Revision 45 TRM 3.0-3 Revision 54 TRM 3.3-43 Revision 62 TRM 3.0-4 Revision 72 TRM 3.3-44 Revision 72 TRM 3.1-a Revision 31 TRM 3.3-45 Revision 31 TRM 3.1-1 Revision 31 TRM 3.3-46 Revision 31 TRM 3.2-1 Revision 31 TRM 3.3-47 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-48 Revision 31 TRM 3.3-b Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-c Revision 31 TRM 3.4-a Revision 31 TRM 3.3-d Revision 31 TRM 3.4-1 Revision 36 TRM 3.3-1 Revision 34 TRM 3.4-la Revision 71 TRM 3.3-2 Revision 59 TRM 3.4-lb Revision 71 TRM 3.3-3 Revision 31 TRM 3.4-2 Revision 31 TRM 3.3-4 Revision 31 TRM 3.4-3 Revision 31 TRM 3.3-5 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-6 Revision 31 TRM 3.4-5 Revision 31 TRM 3.3-7 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-8 Revision 31 TRM 3.4-7 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-10 Revision 31 TRM 3.4-9 Revision 31 TRM 3.3-11 Revision 31 TRM 3.4-10 Revision 31 TRM 3.3-12 Revision 67 TRM 3.5-1 Revision 31 TRM 3.3-13 Revision 74 TRM 3.6-a Revision 70 TRM 3.3-13a Revision 67 TRM 3.6-1 Revision 60 TRM 3.3-14 Revision 67 TRM 3.6-2 Revision 67 TRM 3.3-15 Revision 31 TRM 3.6-3 Revision 31 TRM 3.3-16 Revision 31 TRM 3.6-4 Revision 55 TRM 3.3-17 Revision 31 TRM 3.6-5 Revision 31 TRM 3.3-18 Revision 52 TRM 3.6-6 Revision 33 TRM 3.3-19 Revision 31 TRM 3.6-7 Revision 31 TRM 3.3-20 Revision 31 TRM 3.6-8 Revision 31 TRM 3.3-21 Revision 59 TRM 3.6-9 Revision 66 TRM 3.3-22 Revision 31 TRM 3.6-10 Revision 31 TRM 3.3-23 Revision 31 TRM 3.6-11 Revision 31 TRM 3.3-24 Revision 31 TRM 3.6-12 Revision 31 TRM 3.3-25 Revision 31 TRM 3.6-13 Revision 71 TRM 3.3-26 Revision 31 TRM 3.6-14 Revision 31 TRM 3.3-27 Revision 31 TRM 3.6-15 Revision 31 TRM 3.3-28 Revision 31 TRM 3.6-16 Revision 31 TRM 3.3-29 Revision 31 TRM 3.6-17 Revision 31 TRM 3.3-30 Revision 31 TRM 3.6-18 Revision 31 TRM Vol. I LEP-1 REV 75 7/26/05
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 3.6-19 Revision 31 TRM 3.8-13 Revision 61 TRM 3.6-20 Revision 31 TRM 3.8-14 Revision 46 TRM 3.6-21 Revision 31 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 31 TRM 3.8-17 Revision 43 TRM 3.6-24 Revision 58 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 65 TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 31 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 31 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 70 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 75 TRM 3.7-a Revision 73 TRM 3.12-2 Revision 31 TRM 3.7-b Revision 31 TRM 3.12-3 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-4 Revision 53 TRM 3.7-2 Revision 70 TRM 3.12-5 Revision 53 TRM 3.7-3 Revision 70 TRM 3.12-6 Revision 53 TRM 3.7-4 Revision 73 TRM 3.12-7 Revision 31 TRM 3.7-5 Revision 31 TRM 3.12-8 Revision 57 TRM 3.7-6 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-7 Revision 31 TRM 3.12-10 Revision 31 TRM 3.7-8 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-9 Revision 31 TRM 3.12-12 Revision 31 TRM 3.7-10 Revision 44 TRM 3.12-13 Revision 75 TRM 3.7-11 Revision 31 TRM 3.12-14 Revision 31 TRM 3.7-12 Revision 72 TRM 3.12-15 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-16 Revision 75 TRM 3.7-14 Revision 31 TRM 3.12-17 Revision 31 TRM 3.7-15 Revision 31 TRM 3.12-18 Revision 75 TRM 3.7-16 Revision 31 TRM 3.12-19 Revision 31 TRM 3.7-17 Revision 31 TRM 3.12-20 Revision 75 TRM 3.7-18 Revision 31 TRM 3.12-21 Revision 31 TRM 3.7-19 Revision 31 TRM 3.12-22 Revision 31 TRM 3.7-20 Revision 31 TRM 3.12-23 Revision 31 TRM 3.8-a Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-26 Revision 75 TRM 3.8-3 Revision 73 TRM 3.12-27 Revision 31 TRM 3.8-4 Revision 31 TRM 3.12-28 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-29 Revision 75 TRM 3.8-6 Revision 50 TRM 3.12-30 Revision 31 TRM 3.8-7 Revision 50 TRM 4.0-1 Revision 31 TRM 3.8-8 Revision 50 TRM 5.0-a Revision 31 TRM 3.8-9 Revision 50 TRM 5.0-1 Revision 31 TRM 3.8-10 Revision 50 TRM 5.0-2 Revision 31 TRM 3.8-11 Revision 50 TRM 5.0-3 Revision 31 TRM 3.8-12 Revision 31 TRM 5.0-4 Revision 31 TRM Vol. I LEP-2 REV 75 7/26/05
I FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 5.0-5 Revision 31 TRM B3.4.7-1 Revision 31 TRM 5.0-6 Revision 31 TRM B3.5-1 Revision 31 TRM 5.0-7 Revision 31 TRM B3.6.1-1 Revision 31 TRN 5.0-8 Revision 31 TRM B3.6.2-1 Revision 67 TRM 5.0-9 Revision 31 TRM B3.6.3-1 Revision 68 TRN B1.0-1 Revision 31 TRN B3.6.4-1 Revision 31 TRN B2.0-1 Revision 31 TRN B3.6.5-1 Revision 31 TRM B3.0-1 Revision 63 TRM B3.6.6-1 Revision 70 TRM B3.0-2 Revision 63 TRM B3.6.7-1 Revision 31 TRM B3.0-2a Revision 72 TRM B3.6.8-1 Revision 31 TRM B3.0-2b Revision 72 TRM B3.7.1-1 Revision 31 TRM B3.0-2c Revision 72 TRM B3.7.2-1 Revision 31 TRN B3.0-3 Revision 31 TRM B3.7.3-1 Revision 73 TRM B3.0-4 Revision 31 TRM B3.7.4-1 Revision 31 TRM B3.0-5 Revision 54 TRM B3.7.4-2 Revision 31 TRM B3.0-6 Revision 72 TRM B3.7.5-1 Revision 31 TRM B3.0-7 Revision 72 TRM B3.7.6-1 Revision 31 TRM 33.1-1 Revision 31 TRM B3.7.7-1 Revision 31 TRM B3.2-1 Revision 31 TRM B3.7.8-1 Revision 31 TRM B3.3.1-1 Revision 31 TRM B3.7.9-1 Revision 31 TRM B3.3.1-2 Revision 31 TRM B3.7.9-2 Revision 31 TRM B3.3.2-1 Revision 31 TRM B3.8.1-1 Revision 31 TRM B3.3.2-2 Revision 31 TRM B3.8.2-1 Revision 31 TRM B3.3.3-1 Revision 67 TRM B3.8.3-1 Revision 31 TRM B3.3.4-1 Revision 31 TRM B3.8.'4-1 Revision 31 TRM B3.3.4-2 Revision 31 TRM B3.8.5-1 Revision 31 TRM B3.3.5-1 Revision 31 TRN B3.8.6-1 Revision 43 TRM B3.3.5-2 Revision 31 TRM B3.9.1-1 Revision 31 TRM B3.3.6-1 Revision 31 TRM B3.9.2-1 Revision 65 TRM B3.3.6-2 Revision 31 TRM B3.9.3-1 Revision 31 TRM B3.3.6-3 Revision 31 TRM B3.9.4-1 Revision 31 TRM B3.3.6-4 Revision 31 TRM B3.10-1 Revision 31 TRM B3.3.6-5 Revision 31 TRM B3.11.1-1 Revision 31 TRM B3.3.7-1 Revision 31 TRM B3.12.1-1 Revision 31 TRM B3.3.7-2 Revision 31 TRM B3.12.2-1 Revision 44 TRM B3.3.8-1 Revision 31 TRM B3.12.3-1 Revision 31 TRM B3.3.9-1 Revision 31 TRN B3.12.4-1 Revision 31 TRM B3.3.10-1 Revision 56 TRN B3.12.5-1 Revision 31 TRM B3.3.11-1 Revision 45 TRM B3.12.6-1 Revision 31 TRM B3.3.12-1 Revision 62 TRM B3.12.7-1 Revision 31 TRM B3.3.13-1 Revision 31 TRM B3.12.8-1 Revision 31 TRM 33.3.14-1 Revision 31 TRM B3.4.1-1 Revision 31 TRM B3.4.1-2 Revision 71 TRM B3.4.1-3 Revision 71 TRM B3.4.1-4 Revision 71 TRM B3.4.1-5 Revision 71 TRM B3.4.2-1 Revision 31 TRM B3.4.3-1 Revision 31 TRM B3.4.4-1 Revision 31 TRM B3.4.5-1 Revision 31 TRM 33.4.6-1 Revision 31 TRM Vol. I LEP-3 REV 75 7/26/05
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 11, Revision 0 Page Revision Notation Page 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 0 10 0 11 0 12 0 13 0 14 0 15 0 16 0 17 0 18 0 19 0 20 0 21 0 22 0 TRM Vol. I LEP-4 REV 75 7/26/05
Fire Detection Instrumentation TR 3.12.1 TR 3.12 FIRE PROTECTION TR 3.12.1 Fire Detection Instrumentation TRLCO 3.12.1 The fire detection instrumentation for each fire detection zone shown in Table TR3.12.1-1 shall be OPERABLE.
APPLICABILITY: When equipment protected by the fire detection instrumentation is required to be OPERABLE.
ACTIONS
NOTE-------------------------------------
Separate Condition entry is allowed for each instrument.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more zones with A.1 Restore Function A 14 days
< the total number of instruments) to instruments shown in OPERABLE status.
Table TR3.12.1-1 for Function A, but > one half of the total number of instruments shown in Table TR3.12.1-1 for Function A.
(continued)
TRM Vol. I TRM 3.12-1 REV 75 07/05
Spray and Sprinkler Systems TR 3.12.3 TR 3.12 FIRE PROTECTION TR 3.12.3 Spray and Sprinkler Systems TRLCO 3.12.3 The spray and sprinkler system shown in Table TR3.12.3-1 shall be OPERABLE.
APPLICABILITY: When equipment protected by the spray and/or sprinkler systems is required to be OPERABLE.
ACTIONS
NOTE-------------------------------------
Separate Condition entry is allowed for each system.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 --------NOTE---------
spray and/or sprinkler Only applicable to systems inoperable. areas l.a, 1.d, 1.e, 2.a, 2.b, and 2.d.
Establish a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> continuous fire watch with backup fire suppression equipment.
AND A.2 -------- NOTE---------
Only applicable to areas 1.b, l.c, 1.f, 2.c, 3.a, and 4.a.
Establish an hourly l hour fire watch patrol.
TRM Vol. I TRM 3.12-13 REV 75 07/05
CO2 Systems TR 3.12.4 TR 3.12 FIRE PROTECTION TR 3.12.4 CO2 Systems TRLCO 3.12.4 The following low pressure CO2 systems shall be OPERABLE:
- a. Emergency diesel generators, RHR complex;
- b. Standby gas treatment system charcoal filters, Auxiliary Building, elevation 677 ft 6 in;
- c. Cable tray area, Auxiliary Building, elevation 631 ft; and
- d. Outside Division II switchgear room, Auxiliary Building, elevation 643 ft 6 in.
APPLICABILITY: When equipment protected by the CO2 systems is required to be OPERABLE.
ACTIONS
NOTE-------------------------------------
Separate Condition entry is allowed for each system.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more of the A.1 ---------NOTE--------
above required CO2 Only applicable to systems inoperable. systems c and d above.
Establish a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> continuous fire watch with backup fire suppression equipment.
AND A.2 ---------NOTE--------
Only applicable to systems a and b above.
Establish an hourly 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> fire watch patrol.
TRM Vol. I TRM 3.12-16 REV 75 07/05
II Halon Systems TR 3.12.5 TR 3.12 FIRE PROTECTION TR 3.12.5 Halon Systems TRLCO 3.12.5 The following halon systems shall be OPERABLE with the storage tanks of either the main bank or the reserve bank having at least 95% of the main bank or the reserve bank full charge weight and 90% of the main bank or the reserve bank full charge pressure:
- a. Relay room, elevation 613 ft 6 in;
- b. Cable spreading room, elevation 630 ft 6 in; and
- c. Computer room, and under floor, elevation 655 ft 6 in.
APPLICABILITY: When equipment protection by the halon systems is required to be OPERABLE.
ACTIONS
NOTE------------------------------------
Separate Condition entry is allowed for each system.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more of the A.1 ---------NOTE--------
above required Halon Only applicable to systems inoperable. systems a and b above.
Establish a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> continuous fire watch with backup fire suppression equipment.
AND A.2 --------- NOTE--------
Only applicable to system c above.
Establish an hourly 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> fire watch patrol.
TRM Vol. I TRM 3.12-18 REV 75 07/05
i Fire Hose Stations TR 3.12.6 TR 3.12 FIRE PROTECTION TR 3.12.6 Fire Hose Stations TRLCO 3.12.6 The fire hose stations shown in Table TR3.12.6-1 shall be OPERABLE.
APPLICABILITY: When equipment in the areas protected by the fire hose stations is required to be OPERABLE.
ACTIONS
_------------------------NOTE-------------------------------------
Separate Condition entry is allowed for each fire hose station.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more fire hose ------------- NOTES------------
stations shown in 1. One outlet of the wye shall Table TR3.12.6-1 be connected to the inoperable. standard length of hose provided for the hose station.
- 2. The second outlet of the wye shall be connected to a length of hose sufficient to provide coverage for the area left unprotected by the inoperable hose station.
- 3. Where it can be demonstrated that the physical routing of the fire hose would result in a recognizable hazard to operating technicians, plant equipment, or the hose itself, the fire hose shall be stored in a roll at the outlet of the OPERABLE hose station.
- 4. Signs shall be mounted above the gated wye(s) to identify the proper hose to use.
(continued)
TRM Vol. I TRM 3.12-20 REV 75 07/.05
Yard Fire Hydrants and Hydrant Hose Houses TR 3.12.7 TR 3.12 FIRE PROTECTION TR 3.12.7 Yard Fire Hydrants and Hydrant Hose Houses TRLCO 3.12.7 The yard fire hydrants and associated hydrant hose houses shown in Table TR3.12.7-1 shall be OPERABLE.
APPLICABILITY: When equipment in the areas protected by the yard fire hydrants is required to be OPERABLE.
ACTIONS
NOTE-------------------------------------
Separate Condition entry is allowed for each yard fire hydrant.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more of the A.1 --------- NOTE--------
yard fire hydrants or Only applicable if associated hydrant the inoperable fire houses shown in Table hydrant or associated TR3.12.7-1 inoperable. hydrant hose house is the primary means of fire suppression.
Have additional 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> lengths of 2 % inch diameter hose located in an adjacent OPERABLE hydrant hose house to provide service to the unprotected area(s).
AND A.2 --------- NOTE--------
Only applicable if the inoperable fire hydrant or associated hydrant hose house is not the primary means of fire suppression.
Have additional 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> lengths of 2 % inch diameter hose located in an adjacent OPERABLE hydrant hose house to provide service to the unprotected area(s).
TRM Vol. I TRM 3.12-26 REV 75 07/05
t Fire Rated Assemblies TR 3.12.8 TR 3.12 FIRE PROTECTION TR 3.12.8 Fire Rated Assemblies TRLCO 3.12.8 All fire rated assemblies, including walls, floor/ceilings, cable tray enclosures and other fire barriers, separating safety related fire areas or separating portions of redundant systems important to safe shutdown within a fire area, and all sealing devices in fire rated assembly penetrations including fire doors, fire dampers, cable, piping and ventilation duct penetration seals and ventilation seals, shall be OPERABLE.
APPLICABILITY: At all times.
ACTIONS
NOTE-------------------------------------
Separate Condition entry is allowed for each fire rated assembly.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more of the A.1 Establish a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> above required fire continuous fire watch rated assemblies on at least one side and/or sealing devices of the affected inoperable. assembly(s) and/or sealing device(s).
OR A.2.1 Verify the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> OPERABILITY of fire
-detectors on at least one side of the inoperable assembly(s) and sealing device(s).
AND A.2.2 Establish an hourly 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> fire watch patrol.