E-mail Abdullahi, NRR, to Ennis & Sheron, VY EPU GE Methods
ML052150277
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 06/29/2005
From: Zena Abdullahi
Office of Nuclear Reactor Regulation
To: Richard Ennis, Sheron B
Office of Nuclear Reactor Regulation
References
Download: ML052150277 (5)


Text

I Rick Ennis - Re: 5-may of 6/8 conference call - GE methods Issue Pae91 I Rick Ennis -Re: Summary of 6128 conference call GE methods issue Page From: Zena Abdullahi To: Brian Sheron; Rick Ennis Date: 6/29105 9:51AM

Subject:

Re: Summary of 6/28 conference call - GE methods Issue Rick, 4:13f Pat (e at', (A.)S-c Ipemovevh boc 1 p You did a good summary. I modified Item 9, adding additional explanation.

,e4r bC D1 t4-1)ei

>>> Rick Ennis 06128105 06:14PM >>>

Brian, Attached for your Information Is a summary documenting our call today with Entergy and GE concerning the GE methods Issue.

thanks, Rick 415-1420 CC: Alan Wang; Anthony Ulses; Brooke Poole; Cornelius Holden; Darrell Roberts; Frank Akslulewicz James Lyons; Jared Wermlel; Jennifer Uhle; John Stang; Sheila Ray, Tad Marsh; Thomas Martin

IcUempNGW)00002.TMP Page I I c:'.tempGW)OOOO2.TMP Page II Mail Envelopc Propertics (42C2A73D.291 :23: 35280)

Subject:

Re: Summaxy of 6/28 conference call - GE methods issue Crcation Datc: 6/29/05 9:50AM From: Zena Abdullahi Crcated By: ZXA~nrc.gov Rccipicnts nrc.gov OWGWPO01 .HQGWDO01 FMA CC (Frank Akstulewicz) nrc.gov TWGWPOO1.HQGWDOO1 SXR4 CC (Sheila Ray) nrc.gov TWGWPO02.HQGWVDO01 JSWI CC (Jared Wermiel)

JXUI CC (Jennifer Uhle) nrc.gov owf4_po.OWFNDO ABW CC (Alan Wang)

BWS (Brian Sheron)

CFH CC (Cornelius Holden)

D1R CC (Darrell Roberts)

JEL CC (James Lyons)

JFS2 CC (John Stang)

LBM CC (fad Marsh)

RXE (Rick Ennis) nrc.gov oivf5po.OWVFNDO BDP CC (Brooke Poole) nrc.gov twf4_po.TNVFNDO TOM2 CC (Thomas Martin) nrc.gov twvf5_po.TWFN DO APU CC (Anthony Ulses)

I v.%temPNGVVI0002.MP Page I c:temp\GW1OUOO2.TMP Page 21 21 Post Office Route OWGNVPOD1.HQGWDOOi nrc.gov TWVGWPO01.HQGWDO01 nrc.gov TWGWPOO2.HQGWDOOI nrc.gov owf4_po.OWFN DO nrc.gov owf5.jo.OWFNDO nrc.gov tvf4_po.TWFNDO nrc.gov twf5_po.TWFNDO nrc.gov Files Size Date & Time MESSAGE 1010 06129105 09:50AM GE Methods 6-28-05 call.wpd 8062 06129105 09:48AM Options Expiration Date: None Priority: Standard Reply Requested: No Return Notification: None Concealed

Subject:

No Security: Standard

Summary of 6/28105 Call Regarding GE Methods Issue For Vermont Yankee EPU Participants NRC - TMarsh, ZAbdullahi, JWermiel, TUlses, JUhIe, SRay, JStang Entergy - CNichols, JMcCann, JDreyfus, RVida, LGucwa, EDuda GE - LQuintana, MHarding, BMoore, JKlapproth, JTuttle, MDick Purpose Followup call to 6123 management call between Entergy and NRC to discuss the GE methods Issue as it relates to the VY EPU and to make the 6130 public meeting more productive.

Call Summary

1) VY's EPU submittal relies on GE's Interim process. Based on draft RAls Issued recently, Entergy believe the overall EPU schedule would be delayed significantly If all the RAI Issues were to be addressed.
2) In order to have more timely resolution of the Issues, Entergy/GE will propose an alternate approach to resolve the staffs concerns pending long-term resolution of the issue.

,/-2 7.

10) The staff will review the existing RAls and determine which RAls would still need to be answered given the alternate approach and will revise the RANs as needed. The staff will try to complete this effort prior to the 6130 meeting and provide the revised RAls to Entergy.
11) Entergy and GE will continue discussions and determine if they would like another conference call prior to the meeting. Entergy will contact the staff if another call Is desired.
12) It was agreed that the goals for the 6/30 meeting were: (a) Entergy/GE will restate the proposed alternative approach; (b) the staff will decide which RAls need to be addressed either on the VY docket, or by GE generically.; (c) Entergy will determine the response time on the VY RAls so that the staff can re-establish the EPU review schedule.