ML052090245
| ML052090245 | |
| Person / Time | |
|---|---|
| Site: | Saxton File:GPU Nuclear icon.png |
| Issue date: | 07/22/2005 |
| From: | Kuehn G GPU Nuclear Corp |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| E910-05-039 | |
| Download: ML052090245 (1) | |
Text
CdU NUCLEAR GPU Nuclear, Inc.
Three Mile Island Nuclear Station Route 441 South Post Office Box 480 Middletown, PA 17057-0480 Tel 717-948-8461 July 22, 2005 E910-05-039 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Gentlemen, Subject Saxton Nuclear Experimental Corporation (SNEC)
Operating License No., DPR-4 Docket No. 50-146 FSS Report for SSGS Discharge Tunnel Transition Area The purpose of this letter is to submit for your review the attached FSS Report for SSGS Discharge Tunnel Transition Area. One CD-ROM is included in this submission. The CD-ROM labeled: "FSS Report - SSGS Discharge Tunnel Transition Area-Publicly Available" contains the following 6 files:
Document Title File Name File Size (Mbytes)
Main Report 001 FSS Report-SSGS 0.734 Discharge Tunnel.pdf Appendix A (1-9) 002 - Appendix A (1 -9).pdf 10.8 Appendix A (attachments 1-1 to 9-8) 003 -Appendix A (attachments 35.8 1-1 to 9-8).pdf Appendix B (1-10) 004-Appendix B (1-10).pdf 11.4 Appendix 8 (attachments 1-1 to 9-10) 005 - Appendix B (attachments 49.4 1-1 to 9-10).pdf 44.0 Appendix C 006 - Appendix C.pdf 44.0 If you have any questions on this information, please contact Mr. Art Paynter at (717) 948-8425.
Sincerely, X. A. uehn Program Director, SNEC cc:
NRC Project Manager NRC Project Scientist, Region 1 Mr. Tim Bauer, ORISE Project Leader CVDO