U. S. Nuclear Regulatory Commission Attention: Document Control Desk 1 1555 Rockville Pike Rockville, MD 20852 Serial No.

05-251A NLOS/PRW RO Docket Nos. 50-336 License Nos. DPR-65 DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNIT 2 SUPPLEMENT TO ASSOCIATED PROPOSED TECHNICAL SPECIFICATIONS CHANGES DOMINION CONSOLIDATED QUALITY ASSURANCE PROGRAM In a letter dated September 8, 2004 (Serial No.04-314), Dominion Nuclear Connecticut, Inc.

(DNC) submitted requests for amendments in the form of changes to the Millstone Power Station Units 1, 2 and 3 (MPS 1, 2, 3) technical specifications (TS) associated with the transition to a consolidated quality assurance program for all Dominion sites.

In a conference call held on July 7, 2005, DNC agreed to supplement the September 8, 2004 submittal to correct a discrepancy between the MPS2 and MPS3 proposed TS changes. The attachment to this letter contains the supplement to the September 8, 2004 submittal. of this letter contains the marked up TS page and Enclosure 2 contains the replacement TS page.

The additional information provided in this letter does not affect the conclusions of the safety summary and significant hazards considerations discussion in the DNC letter dated September 8, 2004.

Should you have any questions regarding the responses provided, please contact Mr. Paul R.

Willoughby at (804) 273-3572.

Very truly yours, Leslie N. Hartz Vice President - Nuclear Engineering

Serial No. 05-251A Supplement to Associated Tech Spec Changes Dominion Consolidated Quality Assurance Program Page 2 of 3 Attachments: (1)

1. Description of Change

Enclosures:

(2)

1. Marked Up Technical Specification Page
2. Replacement Technical Specification Page Commitments in this letter: None cc:

U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, Pennsylvania 19406-1 41 5 Mr. S. M. Schneider NRC Senior Resident Inspector Millstone Power Station Mr. V. Nerses NRC Senior Project Manager Millstone Power Station Unit 2 Mr. S. R. Monarque NRC Project Manager North Anna Power Station, Surry Power Station

Serial No. 05-251A Supplement to Associated Tech Spec Changes Dominion Consolidated Quality Assurance Program Page 3 of 3 COMMONWEALTH OF VIRGINIA

)

)

COUNTY OF HENRICO 1

The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Leslie N. Hartz, who is Vice President - Nuclear Engineering, of Dominion Nuclear Connecticut, Inc. and Virginia Electric and Power Company. She has affirmed before me that she is duly authorized to execute and file the foregoing document in behalf of those companies, and that the statements in the document are true to the best of her knowledge and belief.

Acknowledged before me this 47% day of 99

, 2005.

n I

My Commission Expires:

(SEAL)

Serial No. 05-251A Docket No. 50-336 ATTACHMENT 1 SUPPLEMENT TO ASSOCIATED PROPOSED TECHNICAL SPECIFICATIONS CHANGES RELATED TO THE DOMINION CONSOLIDATED QUALITY ASSURANCE PROGRAM DESCRIPTION OF CHANGE DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNIT 2

Serial No. 05-251A Supplement to Associated Tech Spec Changes Dominion Consolidated Quality Assurance Program Page 1 of 1 SUPPLEMENT TO ASSOCIATED PROPOSED TECHNICAL SPECIFICATIONS CHANGES RELATED TO THE DOMINION CONSOLIDATED QUALITY ASSURANCE PROGRAM DESCRIPTION OF CHANGE In a letter dated September 8, 2004 (Serial No.04-314), Dominion Nuclear Connecticut, Inc. (DNC) submitted requests for amendments in the form of changes to the Millstone Power Station Units 1, 2 and 3 (MPS 1, 2, 3) technical specifications (TS) associated with the transition to a consolidated quality assurance program for all Dominion sites.

In a conference call held on July 7, 2005, the NRC staff advised DNC that there appears to be a discrepancy between the MPS2 and MPS3 submittals.

Specifically, the MPS3 Technical Specification 6.2.2, facility Staff, contained a note committing MPS3 to the Commission Policy Statement on Engineering Expertise on Shift whereas the MPS2 TS does not contain the note. Therefore, DNC is providing a replacement page for MPS2 Technical Specification 6.2.2, Facility Staff, which contains wording similar to the MPS3 note. Enclosure 1 of this letter contains the marked up TS page and Enclosure 2 contains the replacement TS page.

While reviewing the MPS2 TS page in question, it was determined the page contained typographical errors. Note 1 of page 6-4 currently reads, (1) Does not include the licensed Senior Reactor or Senior Reactor Operator Limit to Fuel Handling individual supervision CORE ALTERATIONS after initial fuel loading.

It should read, (I) Does not include the licensed Senior Reactor Operator or Senior Reactor Operator Limit to Fuel Handling individual supervising CORE ALTERATIONS after initial fuel loading. It is requested that these errors be corrected in addition to the changes discussed above. The marked up page and retyped page reflect the corrections.

The additional information provided in this letter does not affect the conclusions of the safety summary and significant hazards considerations discussion in the DNC letter dated September 8, 2004.

Serial No. 05-251A Docket No. 50-336 ENCLOSURE 1 SUPPLEMENT TO ASSOCIATED PROPOSED TECHNICAL SPECIFICATIONS CHANGES RELATED TO THE DOMINION CONSOLIDATED QUALITY ASSURANCE PROGRAM MARKED UP TECHNICAL SPECIFICATION PAGE DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNIT 2

September 17, 2002 TABLE 6.2-113' MINIMUM SH I FT-CREW COMPOSITION'*'

LICENSE CATEGORY APPLICABLE MODES 1, 2, 3 & 4 5 & 6 1"'

Senior Reactor Operator 2

Reactor Operator 2

1 Non-Licensed Operator 2

1 S h i f t Technical Advisor None Required (1)

Does n o t include t h e licensed Senior Reactor eactor Operator Limited t o Fuel Handling i n d i v i d u a l ERATIONS a f t e r t h e i n i t i a l f u e l loading.

The above s h i f t crew composition and t h e q u a l i f i e d r a d i a t i o n p r o t e c t i o n technician o f Section 6.2.2 may be l e s s than t h e minimum requirements f o r a p e r i o d o f time n o t t o exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> i n order t o accommodate unexpected absence provided expeditious actions are taken t o fill t h e r e q u i r e d p o s i t ion.

( 2 )

( 3 )

Requirements f o r minimum number o f licensed operators on s h i f t d u r i n g operation i n modes other than c o l d shutdown o r r e f u e l i n g are contained i n 10CFR50.54(m).

( 4 )

The S h i f t Technical Advisor p o s i t i o n can be f i l l e d by e i t h e r o f t h e two

, i f he meets t h e MILLSTONE - UNIT 2 6-4

Serial No. 05-251A Docket No. 50-336 ENCLOSURE 2 SUPPLEMENT TO ASSOCIATED PROPOSED TECHNICAL SPECIFICATIONS CHANGES RELATED TO THE DOMINION CONSOLIDATED QUALITY ASSURANCE PROGRAM REPLACEMENT PAGE DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNIT 2

TABLE 6.2-1(3)

MINIMUM SHIFT-CREW COMPOSITION(^)

LICENSE CATEGORY APPLICABLE MODES l, 2, 3 & 4 5 & 6 Senior Reactor Operator Reactor Operator Non-Licensed Operator Shift Technical Advisor 2

2 2

1(4) 1(')

1 1

None Required Does not include the licensed Senior Reactor Operator or Senior Reactor Operator Limited to Fuel Handling individual supervising CORE ALTERATIONS after the initial fuel loading.

The above shift crew composition and the qualified radiation protection technician of Section 6.2.2 may be less than the minimum requirements for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in order to accommodate unexpected absence provided expeditious actions are taken to fill the required position.

Requirements for minimum number of licensed operators on shift during operation in modes other than cold shutdown or refueling are contained in 10CFR50.54(m).

The Shift Technical Advisor position can be filled by either of the two Senior Reactor Operators (a dual-role individual), if he meets the Shift Technical Advisor qualifications of the Commission Policy Statement on Engineering Expertise on Shift.

MILLSTONE - UNIT 2 6-4 Amendment No. &,%, 92,436,463,

=,