ML052060178
| ML052060178 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 07/14/2005 |
| From: | James Shea Office of Nuclear Reactor Regulation |
| To: | Margie Kotzalas Office of Nuclear Reactor Regulation |
| References | |
| +sispjld120050727 | |
| Download: ML052060178 (2) | |
Text
I Rick Ennis -VY Status Page 1 1 1 Rick Ennis - VY Status Pane II From:
James Shea To:
Margie Kotzalas Date:
7/14/05 2:27PM
Subject:
VY Status
- Margie, I talked to the VY Licensing (Rhonda Daflucas) when you left my office and I asked them your questions.
- 1) The GE methods (Thermal Hydraulic methodology) and the Steam Dryer are equal critical path
- 2) Their original need date was last fall (15% epu) for this cycle. This cycle ends in November and they were gearing up for the 20% Uprate for this next cycle. They are now resigned to not getting this Uprate approved so they are re-designing the core and preparing for the ACRS meeting in November. They want a phone call with TAD tomorrow to make sure they are on the correct path in preparation of the ACRS meeting in November.
James Shea, PM NRR/DLPM/LPDI-2 U.S. Nuclear Regulatory Commission Office #: O-8F6 Phone #: 301-415-1388 Mail Stop: 0-8B1 E-Mail Bs@nrc.gov CC:
Darrell Roberts; Jennifer Uhle; Rick Ennis
I c:\\temp\\GW)00001.TMP Page 1 1 1 c:\\temp\\GWIOOOO1.TMP Page 1 I Mail Envelope Properties (42D6AE73.390: 9: 35204)
Subject:
VY Status Creation Date:
7/14/05 2:26PM From:
James Shea Created By:
JJS@nrc.gov Recipients nrc.gov OWGWPO02.HQGWDOOI MXK5 (Margie Kotzalas) nrc.gov TWGWPOO2.HQGWDOO1 JXU1 CC (Jennifer Uhle) nrc.gov owf4po.0WFNDO DJR CC (Darrell Roberts)
RXE CC (Rick Ennis)
Post Office Route OWGWPO02.HQGWDOOI nrc.gov TWGWPOO2.HQGWDOO1 nrc.gov owf4po.0WFNDO nrc.gov Files Size Date & Time MESSAGE 1598 07/14/05 02:26PM Options Expiration Date:
None Priority:
Standard Reply Requested:
No Return Notification:
None Concealed
Subject:
No Security:
Standard