ML052060168

From kanterella
Jump to navigation Jump to search
E-mail Ennis, NRR, to Daflucas, Entergy Nuclear Northeast, VY EPU Steam Dryer Audit
ML052060168
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 07/20/2005
From: Richard Ennis
Office of Nuclear Reactor Regulation
To: Daflucas R
Entergy Nuclear Northeast
References
Download: ML052060168 (3)


Text

I Rick Ennis - Steam Drye-r-Audits- at GE-S-an Jose -and DC Offices Page Paae 1 IU Rick Ennis Steam Dryer Audits at GE San Jose and DC Offices From: Rick Ennis To: Ronda Daflucas Date: 7120/05 11:59AM

Subject:

Steam Dryer Audits at GE San Jose and DC Offices Ronda, I just talked to Tom Scarbrough and got some clarification on the details of the steam dryer audits EMEB would like to perform. The info is as follows:

1) Audit at GE's San Jose office: The purpose would be to see the VY steam dryer model including a test run. The staff would like to look at data from either that test run or previous test runs. Tom said Dan Summerville of GE set up something similar for us in August 2004 for Quad Cities. This would be a one day audit and the attendees would likely be John Wu and our contractor Dr. Samir Ziada. The timeframe on this is flexible. We understand that you are looking into the current status of the model (i.e., possibility that it is disassembled in preparation for moving to a new location) and that there may be concerns since Dr. Ziada is not a US citizen.
2) Audit at GE's DC office: The purpose would be to look at the background information/data which was used as a basis in preparing the RAI responses that are scheduled to be submitted by 8/1/05. This audit will likely involve several NRC headquarters staff members and all our contractors. We would like to perform the audit the week of 8/15. The audit would likely take 3 to 4 days.

Please let me know if you have any questions.

thanks, Rick 301-415-1420 CC: Brian Hobbs; Brian Sheron; Brooke Poole; Cheng-lh Wu; Christopher Grimes; Cornelius Holden; Craig Nichols; Darrell Roberts; Gene Imbro; Jennifer Uhle; Jim DeVincentis; Kamal Manoly; Len Gucwa; Michael Mayfield; Rebecca Karas; Tad Marsh; Thomas Scarbrough

I c~itempiGW}00001.TMP Pagqe Paqe I1 i I cAtemrAGWlOOOOl .TMP Mail Envelope Properties (42DE74C5.87D: 1: 372)

Subject:

Steam Dryer Audits at GE San Jose and DC Offices Creation Date: 7/20/05 11:59AM From: Rick Ennis Created By: RXE~nrc.gov Recipients Action Date & Time owfl2po.OWFNDO Delivered 07/20/05 11:59AM TGS CC (Thomas Scarbrough) owf4_po.OWFNDO Delivered 07/20/05 11:59 AM RXE BC (Rick Ennis) Opened 07/20/05 11:59 AM entergy.com bhobbs CC (Brian Hobbs) cnichol CC (Craig Nichols) jdevinc CC (Jim DeVincentis)

LGUCW90 CC (Len Gucwa) rdafluc (Ronda Daflucas) nrc.gov OWGWPOO2.HQGWDOO1 EXI CC (Gene Imbro) nrc.gov TWGWPO02.HQGWDO01 JXUI CC (Jennifer Uhle) nrc.gov owf2_po.OWFNDO Delivered 07/20/05 11:59 AM CIWI CC (Cheng-Ih Wu)

KAM CC (Kamal Manoly) nrc.gov owf4_po.OWFNDO BWS CC (Brian Sheron)

CFH CC (Cornelius Holden)

CIG CC (Christopher Grimes)

DJR CC (Darrell Roberts)

LBM CC (Tad Marsh)

RLK CC (Rebecca Karas) nrc.gov

I c:\temp\GW)00001.TMP IcAtemp\GW}00001 .TMP Page 22 !1 Page Ii owf5_po.OWFNDO Delivered 07/20/05 11:59 AM BDP CC (Brooke Poole) nrc.gov twf5_po.TWFNDO MEM2 CC (Michael Mayfield)

Post Office Delivered Route owf2_po.OWFNDO 07/20/05 11:59AM owf4_po.OWFNDO 07/20/05 11:59 AM Pending entergy.com OWGWPOO2.HQGWDOO1 Pending nrc.gov TWGWPO02.HQGWDOOI Pending nrc.gov owf2_po.OWFNDO 07/20/05 11:59 AM nrc.gov owf4po.OWFNDO Pending nrc.gov owf5_po.OWFNDO 07/20/05 11:59 AM nrc.gov tNf5_po.TWFNDO Pending nrc.gov Files Size Date & Time MESSAGE 2044 07/20/05 11:59AM Options Auto Delete: No Expiration Date: None Notify Recipients: Yes Priority: Standard Reply Requested: No Return Notification: None Concealed

Subject:

No Security: Standard To Be Delivered: Immediate Status Tracking: Delivered & Opened