03-A I NNEc Cornnairtcc to Nuclear Ercdflcncc PWRIDEWY 0F ru intl EECu

  • U2R23 Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda Friday, May 28, 2004 Start Time:

0600 NSB Cafeteri; ATTENDEES Shift Outage Directors Shift Outage Managers (SOM)

Operations Coordinators (SOC)

Maintenance Coordinators (MOC)

Engineer/ Projects Coordinators (EOM)

Rad Protection Manager (RPM)

Site Safety Coordinator (SSC)

Shutdown Safety Assessor (SSA)

Site Management (SSM)

General Supervisors First Line Supervisors Agenda

1. Safety Issue Discussion (SSC)
2. Radiation Protection (RPM)
3. Operations Coordinator Turnover (SOC)
4. Shutdown Safety Assessment (SSA)
a. Containment Fire Loading SAT /

UNSAT -+ Review Deficiencies

5. Maintenance Coordinator Turnover (MOC)
6.

Engineering Coordinator Turnover (EOM)

7.

Major Projects Update (EOM)

8.

Schedule Review (SOM)

9.

Management Expectations (SSM)

10. ACEMAN Assessment Results (SOM)
11. Shift Goals (SOM) a BRIEFING NOTES Ax P24 YINJI' 7y

/Z Is-E 7-WtAr-C //VzaI.,

A".

Items Included in Daily Package:

Site Communication Safety Snippet Outage Alara Report Outage Status Report Shutdown Safety Assessment Defined Critical Path Work Activity Risk Assignment Outage Schedule

\\0> P 1

Commited to Nucicar E lJIl flE ii 1

Point Beach Nuclear Plant U1R28 Refueling Outage

'p.--.~:aC

-r;'

ai;.¢aeWy oplc.io rw e ofay2-29 204:.-

'<ll a-v Theme for the week This week's theme deals with odds and ends for Comrleting the Outage. We are almost done.

A number of critical work activities will be conducted this week in containment and we will begin a major battery change out. It is time to review industry OE from other sites to make sure we've learned from their experiences. Nothing will stop our progress faster than a serious iniury!

. Daily Safety Snippets Sunday

.rs there an obstruction in your way that might not stay?

OE13857 May 2002, Fort Calhoun -While moving the reactor vessel head assembly during a refueling outage, the control pendant for the polar crane caught a handrail vertical support pipe, lfting the pipe out of its mount and causing it to fail 20 ft to the walkway below. Individuals were In the area at the time, but not injured. A review Indicated the pendant caught on nearby equipment many times during past refueling outages and corrective actions were not put in place.

Are there any Items were ourequipment gets caught during moves that we have not resolved?

Monday

'The big picture do we see? And communication is the key.

OE12357 January 2001, River Bend - A worker focused on a moving load and did not pay attention to the movement of the crane. He ended up being forced against a handrail by the cab of the crane, luckily resulting only In minor injuries.

The entire crew was focused on the load with no one person having oversight of the whole evolution.

During crane operations, do we designate an Individual to 'watch the big picture?

Tuesday "Peer checks - do we use them?

December 1997, Byron -An electrician was taken to the hospital for treatment of second-degree burns on his hand and flash bums to his eyes as a result of a mishap. He was one of three electricians assisting a system engineer during a battery discharge test on a new battery bank when he accidentally shorted across the battery with one of the cables used to connect the battery to a resistor bank. An investigation showed that the electricians and the system engineer had not verified the correct cable configuration. Also, the injured electrician was not wearing low voltage gloves and had rolled up the sleeves of the long-sleeve shirt he was required to wear for this job.

VMat PPE do we wear during battery work?

Wednesday

.Vust a reminder to be told, balance that loadYP OE10902 March 2000, Seabrook - Electricians were offloading battery cells from a metal pallet on a forklift. The offload sequence went from Inside, closest to the forklift, to the outside, furthest from It The result - Instability in the load and the pallet tipped under the weight of the batteries. The cells fractured spilling 19 gallons of sulfuric acidlwater electrolyte In the switchgear room. This OEIs not lust forbatteryrenmoval Balance alyourloadrs Thursday Make sure the scaffold doesn't slip and come down too quick.

OE14551 July 2002, Davis-Besse -A diamond deck plate slipped through a gap between two pieces of floor grating and dropped 20 ft to the level below, damaging an instrument line. The rest of our scaffolding Is coming down.

Are we aware of the potential Wholesformaterialto go through?

Friday "Before heat up, make sure someone has done the clean-upr OE57698 April 2004, Palo Verde -Two mechanics received second degree burns to the face as the result of a flash fire that occurred as they began pre-heating for welding. Isopropyl alcohol was used to dean and liquid had accumulated in the casing of the equipment. The oncoming crew was not aware of this buildup as theY began work.

Saturdav "Always remember to verify first, or you may take a ride In a hearse. -

1992, Palisades - An experienced electrical technician at Palisades was electrocuted when he failed to Install a circuit Jumper before removing test equipment from a current transformer. The existing circuit configuration had not been anticipated during work planning, and the decision to use jumpers to maintain energized current transformer circuits during testing had not been reviewed by supervision.

2

Point Beach Nuclear Plant Outage 1R28 DAY Supporting Operational Excellence Outaae Radiation Performance 53 Path Picture Meets r%--.4 RA__f C--A.

I I

JUVQI I& I *VIWI L*I.%A I.

aMt A

A This indicator measures cumulative dose radiation exposure and total number of personnel-contamination events (PCE's > 5000 cpm) during refueling outages. The dose indicator is measured in Rem and individual PCE events.

Meets:

<=92 Rem Actual Cum.

Exceeds:

<=88 Rem*

Dose:

81.868 Rem Day 53 - May 26 Actual = 1.318 Cumulative = 81.868 Cumulative Forecast =85.896 Meets: <= 18 Exceeds: <= 12 Actual PCE's:

11 S.

S

.S*

01 Stu Thomas Cumulative Dose Exposure Personnel Contamination Events 20 18 r16 ii 14 V12 E 10 0

8 46 2

0 4

.I 0

5 10 15 20 25 30 35 40 45 50 55 60 80 4

Actual Forecast

~

Goal E

a 60 0

040 0o

= 20 Actual Forecast Goal 0 2 45 6 5 O,2141616"222426213032345384#0424446*85052U545658m

NCce Cotnmitted to Nuclear Excellence Outage Status Report Plant:

Point Beach Unit 1 Day:

Friday Today's Date / Time:

5/28/04 0300 Outage Duration: Day k 55 Of Refueling Outage Number U1IR28 Safety Status Industrial - Within the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OSHA Recordables 0

First Aid cases 0

Near misses 0

Total for this outage I

Summary:

Radiological Dose to date 81.868 Projected to date

  • 85.896 Outage Goal

_ 92 R Difference 4.028

  • Reforecast on 5/23 Number of PCEs 11 Summary:

Nuclear Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0

Summary:

Plant Status Mode:

El Hot Standby (Mode 3) 0 Hot Shutdown (Mode 4) K DCold Shutdown (Mode5) 0 Refueling Shutdown (Mode 6)

RCS:

Temperature: -p92.

Pressure:

Veited to Atmosphere RV Level:

.70%

Time to Boil:

  • 98 minutes (l butdown Safety Assessment Protected Equipment:

Major Activities Completed In Last 24 Hours Critical Path and Near Critical Path Activities (Next 24 Hours)

  • Continued Containment Cleanup
  • Conitainment Cleanup
  • Rod Latch Tool Removed From Containment
  • RCS Fill & Vent
  • Installed Conoseals 4-Fill Pressurizer Solid
  • Installed Pressurizer Manway RCS Intact
  • I&C Cavity Restoration Containment Fan Cooler Testing Significant Outstanding Issues Date Issue Due Responsibility 5/17/04 Rx Head Relief Request 6/1/04 Jim Schweitzer Upcoming MAlor Milestones Scheduled Actual Scheduled Actual Date Time Date Time Date Time Date Time Cooldown <200° 410/04 2100 4/03/04 2230 RCS Fill & Vent 4/23/04 1500 Head Lift 4/09/04 0900 4/21/04 1550 Heatup >2000 4/25/04 0900 Refueled 4/14/04 0300 5/02/04 1848 Reactor Critical 4/28/04 0800 RV Headset 4/18/04 1900 5/23/04 1338 On-Line.

4/30/04 0100 A.

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

1 DATE:

May 28, 2004 TIME:

0200 KEY SAFETY FUNCTIONS:

REACTIVITY:

GREEN CORE COOLING:

POWER AVAILABLE:

INVENTORY:

YELLOW GREEN YELLOW CONTAINMENT:

SFP COOLING:

GREEN NA PROTECTED EQUIPMENT:

COMMENTS:

  • Fire Protection Condition II: "A" and "B" SG's will be unavailable during drain and refill. Credit is taken for fire rounds as fire prevention contingency PBF-1562 Revision 2 10130/02

References:

NP 10.3.6 NP 10.2.1 Page 5 of 9