ML052010540
| ML052010540 | |
| Person / Time | |
|---|---|
| Site: | Saxton File:GPU Nuclear icon.png |
| Issue date: | 07/14/2005 |
| From: | Kuehn G GPU Nuclear |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML052010538 | List: |
| References | |
| E910-05-032 | |
| Download: ML052010540 (1) | |
Text
GmU NUCLEAR GPU Nuclear, Inc.
Three Mile Island Nuclear Station Route 441 South Post Office Box 480 Middletown, PA 17057-0480 Tel 717-948-8461 July 14, 2005 E910-05-032 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Gentlemen, Subject Saxton Nuclear Experimental Corporation (SNEC)
Operating License No., DPR-4 Docket No. 50-146 FSS Report - Penelec Switch Yard Control Building The purpose of this letter is to submit for your review the attached FSS Report - Penelec Switch Yard Control Building. One CD-ROM is included in this submission. The CD-ROM labeled: 'FSS Report - Penelec Switch Yard Control Building - Publicly Available" contains the following 9 files:
Document Title File Name File Size (Mbytes)
Main Report 001 FSS Report-Penelec Main________
ReprtSwitch Yard Control Bldg.pdf 10.1 Appendix A-1 (1-9) 002 Appendix A-1 (1-9).pdf 47.5 Appendix A-1 (attachments 1-1 to 3-3) 003 Appendix A-1 (attachments 23.9
__________________________1-1 to 3-3).pdf Appendix A-1 (attachments 4-1 to 4-8) 004 Appendix A-1 (attachments 12.2 AppendixA-1_(attahments_5-1_to_6-3)4-1 to 4-8).pdf Appendix A-1 (attachments 5-1 to 6-3) 005 Appendix A-1 (attachments 37.8 5-1 to 6-3).pdf Appendix A-1 (attachments 7-1 to 7-14 006 Appendix A-1 (attachments 27.1
___________________________7-1 to 7-I14).pdf 2.
Appendix A-i (attachments 8-1 to 8-4) 007 Appendix A-i (attachments 33.8
___________________________8-1 to 8-4).pdf Appendix A-I (attachments 9-1 to 1 0-008 Appendix A-i (attachments 25.7
- 1) 9-1 to 10-1).pdf Appendix A-2 and A-3 009 Appendix A-2 and A-3.pdf 15.0 If you have any questions on this information, please contact Mr. Art Paynter at (814) 635-4384.
G.A-Program Director, SNEC cc:
NRC Project Manager NRC Project Scientist, Region 1 Mr. Tim Bauer, ORISE Project Leader
9\\