FENOC Beaver Valley Power Station P. 0. Box 4 Shippingport, PA 15077 L-05-1 19 July 8, 2005 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66
-Unit-2-*Docket No.-50-412,-License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
In ;.accordance.with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report",' and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of June, 2005. This information has also been inputted into the INPO Consolidated Data Entry (CDE) System.
No regulatory commitments are contained in this submittal.
Respectfully, W. Pearce Vice-President BVPS DTJ/cjg Enclosures cc:-.
NRC Regional Office
- l
-King of-Prussia, PA,..;
..,.^
.... ' '.*b.24
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIC 50-334 Beaver Vallev 1 Uuly-M-00 David T. Jones 724-682-4962 June 2005
- 1. Design Electrical Rating
- 2. Maximum Dependable Capacity (MWe-Net) 835.00 821.00 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 4,343.00 180,506.14
- 4.
Number of Hours Generator On-line 720.00 4,343.00 177,960.14 5.-ReserveShutdownHours__
Ad 0.00---
-0.00
_0.00
- 6. Net Electrical Energy Generated (MWHrs) 598,100.00 3,613,510.00 134,933,429.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason 1 Down 2 Comments NONE.
1 Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain) 2 Method:
1 Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
SUMMARY
The Unit operated at a nominal value of 100% output for the entire month of June 2005.
Page 1 of 1
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIC 50-412 Beaver Valley2 David T. Jones 724-682-4962 June 2005
- 1.
Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 836.00 831.00
- 3. Number of Hours the Reactor was Critical
- 4. Number of Hours Generator On-line 5S.--Reserve Shutdown Hours
-d
- 6. Net Electrical Energy Generated (MWHrs)
This Month Yr-to-Date Cumulative 720.00 3,766.75 130,159.23 720.00 3,752.17 129,400.55
.- -O.000 0 __ -
0.0-0.00 _-
593,184.00 2,999,622.00 102,133,852.0 UNIT SHUTDOWNS NONE.
2 Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
SUMMARY
The Unit operated at a nominal value of 100% output for the entire month of June 2005.
Page 1 of 1