ML051950613
| ML051950613 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 05/02/2005 |
| From: | Mcneil D NRC/RGN-III/DRS/OLB |
| To: | |
| References | |
| 50-263/05-301 50-263/05-301 | |
| Download: ML051950613 (1) | |
Text
2005 NRC ILT Student Handouts for the Written Exam Ops Manual B.01.02-06, Revision 1*, Figure 9 Example of Uploaded Scram Timing Data Report, P 11 Ops Manual B.01.02-06, Revision 1*, Figure 10 Scram Insertion Time Vs. Reactor Pressure, P. 12 Ops Manual B.01.04-06, Revision 11, Figure 16 Loop B: Jet Pump Loop Flow/Pump Speed, P. 18 Ops Manual B.01.04-06, Revision 11, Figure 17 Recirculation Pump Flow vs Speed, P. 19 Ops Manual B.06.02.04-06, Revision 2, Figure 2 Current Flow Comparator, P 4 Ops Manual C.4-B.05.01.02.A, Revision 9, Figure 1 Exclusion Region Boundary, P. 6 Ops Manual C.4-B.06.03.A, Revision 8, Figure 1 Turbine Exhaust Pressure Limits, P. 8 Ops Manual C.4-C, Revision 23, Table 1, Initial Control Switch Lineup for ASDS Panel C-292, P. 4 Ops Manual C.4-C, Revision 23, Heat Capacity Limit (SPDS 78), P. 28 Ops Manual C.4-C, Revision 23, Figure 2 Reactor Depressurization Rate, P. 29 Ops Man C.2-05, Revision 21, Parts A, B, and C, PP. 26-29 Procedure 0000-B, Revision 87, Operations Daily Log - Part B, PP. 1-13 (entire procedure)
Procedure 0255-06-III-1, Revision 5, HPCI Comprehensive Pump and Valve Tests, P. 8 Procedure A.2-101, Revision 33, Classification of Emergencies, PP. 1-55 (entire procedure)