ML051950382

From kanterella
Jump to navigation Jump to search
Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML051950382
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/11/2004
From: Leiker J
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051950382 (3)


Text

{{#Wiki_filter:Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date: May 11, 2004 Time: 1400 Preparer: Jon Leiker U I R 28 NOTE: Refer to base procedure NP 10.3.6 for sasfed assessment checklist KSF definitions. NOTE: Whenever ftel has been reinovedfroyn the reactor vessel and refueling cavity, all key safety fitnctions are GREEN except spent fiel pool cooling. KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY

1.

RCS Boron concentration = 3006 ppm a.) For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.) For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C (0-1) 1

2.

Number of boration paths (0-2) 2

3.

No fuel motion (0-1) I

4.

SR instrumentation operable (0-1) I Cavity Boron concentration = 3001 ppin Subtotal 0-1 2 Condition RED ORANGE .. XW6 Subtotal = 5 CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (0-2) l 0 0-1 RED

2.

Refueling cavity filled (0-1) 1 2

3.

Number of trains RHR available (0-2) 1 V

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS Temperature =77 0F; 38 days shutdown; RCS Level = Refueling height; Reactor is refueled Subtotal = 3 RCS Time to Boil 40 hrs (Applicable at Cold or Refueling Shutdown) POWER AVAILABILITY Subtotal Condition

1.

Independent off-site power sources I RED available to A-05 and A-06 (totally 2 ORANGE independent at the 4160 V, 13.8 kV, 3 and 345 kV levels) (0-2) 2

2.

G-0I or G-02/A-051B-03 available (0-1) I G-03 or G-04/A-06/B-04 available (0-1) 1

3.

G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours. (0-1) 1 Subtotal = 5 INVENTORY Subtotal Condition 0-1 RED

1.

Pressurizer level 220 percent w/head on (0-1) 0 2 ORANGE

2.

Refueling Cavity filled (see definition) (0-3) 3 3 -A V

3.

RCS level above REDUCED INVENTORY (0-1) I 0 Q LEEgo

4.

Makeup from VCT/BLENDER and/or RWST available (0-2) 0 Subtotal = 4 PBF-1562 Revision 2 10/30/02 I -dma eedom ofirraff AexiorB a PnU I Of 9 U-{ 74L

References:

NP 10.36 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1.

Containment integrity (TS l5. J.D) I Containmcnt Operable) (ITS TS 3.6.1) set

2.

Containment Closurc CL-lE maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability: cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 ( or 2) 2 (0-1) 1 Subtotal 0 2-3 nA 5-6 Condition RED ORANGE (0-1) 1 Subtotal = 4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS) NOTE: Take creditfor only one P-12 independent offsite power source during periods of single X-03 or X-04 availability (*).

l.

"A" SFP cooling pump available with power available from: G-02 or G-01 via 2B-32 -(*) an independent off-site power source different than that for Train B below

2.

"B" SFP cooling pump available with power available from: G-03 or G-04 via IB-42 .(*) an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours. Subtotal 0-1 2 3 4-5 Condition RED ORANGE YELLOW GREEN (0-1) NA (0-1) NA (0-1) NA (0-1) NA (0-1) NA SFP Temperatures: NW NA 0F SE NA 0F SFP Average Temp NA SFP Time to Boil NA Subtotal = NA OF GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE: Look-ahead #1: When reactor cavity level falls below 23 ft above flange, we will lose I point for Power Availability. Look-ahead #2: While reactor vessel internals are being moved and also when rods are being latched, we will lose 1 point for Reactivity and 1 point for Containment. During internals movement, use TTB curves in Att. A of NP 10.3.6. Look-ahead #3: When reactor vessel internals are in place, we will lose 1 point for Inventory and 1 point for Containment (assuming no CFCs are available). Until cavity level is lowered, use TTB curves in Att. A of NP 10.3.6. PBF.1562 Revision2 1013(VO0

References:

NP 10.3.6 NP 10.2.1 Page 2 of 9

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT: I DATE: May 11, 2004 TIME: 1400 KEY SAFETY FUNCTIONS: REACTIVITY: CORE COOLING: POWER AVAILABLE: INVENTORY: CONTAINMENT: SFP COOLING: GREEN YELLOW GREEN GREEN GREEN NA PROTECTED EOUIPMENT: RCS Time to Boil is 40 hours Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency PBF-1562 Revision2 10/30/1X

References:

NP 10.3.6 NP 10.2.1 Page 5 of 9}}