July 19, 2005 Mr. Charles D. Naslund Senior Vice President and Chief Nuclear Officer Union Electric Company Post Office Box 620 Fulton, MO 65251

SUBJECT:

CALLAWAY PLANT, UNIT 1 - RESPONSE TO GENERIC LETTER 2004-01, "REQUIREMENTS FOR STEAM GENERATOR TUBE INSPECTIONS" (TAC NO. MC4806)

Dear Mr. Naslund:

On August 30, 2004, the Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2004-01, "Requirements for Steam Generator Tube Inspections." The purpose of GL 2004-01 was to obtain information that would enable the NRC staff to determine whether licensees' steam generator (SG) tube inspection programs for nuclear power plants comply with the existing tube inspection requirements, which are in the plant technical specifications in conjunction with Appendix B to Part 50 of Title 10 of the Code of Federal Regulations.

By letter dated October 27, 2004 (ULNRC-05), Union Electric Company (UEC) responded to GL 2004-01 for Callaway Plant, Unit 1 (Callaway) and stated that the Callaway SGs are four Westinghouse Model F SGs, with a combination of Inconel 600 mill-annealed and Inconel 600 thermally treated (first 10 rows) tubes. In the letter, it was also stated that (1) an assessment, which includes operating experience, is made prior to each inspection to identify degradation mechanisms that may be present and to verify that the eddy current techniques are capable of detecting the targeted degradation mechanisms and (2) the entire length of the tubesheet is not inspected with a rotating probe beyond the depth where defects do not constitute a structural or leak integrity issue based on WCAP-15932, "Improved Justification of Partial-Length RPC Inspection of Tube Joints of Model F Steam Generators of Ameren UE Callaway Plant,"

Revision 1, dated May 2003. UEC stated that Revision 0 of the WCAP had been submitted to the NRC in UEC's letter dated October 3, 2002, and reviewed, but not approved, by the NRC staff. Revision 1 of the WCAP incorporated the changes based on discussions with the NRC staff regarding Revision 0. UEC also provided a safety assessment of the inconsistency of the Callaway inspection methodology with respect to the NRC staff's position in GL 2004-01 in Attachment II to its letter.

The NRC staffs review of the GL response in the October 27, 2004, letter did not identify any safety concerns with the SG tube inspection practices at Callaway. Although your response to the "method of evaluation" item did not focus on the staff's area of concern, we concluded that your overall response to the GL is acceptable, as discussed below. Although stress corrosion cracking is an active damage mechanism in the tubesheet region, you identified that the entire length of the tubesheet is not inspected with a rotating probe. You indicated that inspections in the tubesheet region are performed in accordance with WCAP-15932. This document is

C. Naslund intended to provide the inspection length needed to ensure the structural and leakage integrity of the tubes. Since the inspections performed in the tubesheet region at Callaway are not consistent with the NRC's position, you indicated that this item was entered into your corrective action program. You further indicated that the SGs at Callaway will be replaced at the next refueling outage and that no other corrective action is required. The NRC finds this acceptable since (1) the inspections performed in the tubesheet region, based on your safety assessment and the analysis in WCAP-15932, provide reasonable assurance of tube integrity in this area of the tube bundle until your next outage, (2) you plan to replace your SGs next outage and the tubes in these replacement SGs will be fabricated with thermally treated Alloy 690 which is intended to reduce the likelihood of stress corrosion cracking in this region, and (3) we expect you will follow the regulatory requirements as given in GL 2004-01 when these new SGs are installed.

This letter closes out TAC No. MC4806. If you have any questions regarding this matter, please contact me at (301) 415-1307.

Sincerely,

/RA/

Jack Donohew, Senior Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-483 cc: See next page

C. Naslund intended to provide the inspection length needed to ensure the structural and leakage integrity of the tubes. Since the inspections performed in the tubesheet region at Callaway are not consistent with the NRC's position, you indicated that this item was entered into your corrective action program. You further indicated that the SGs at Callaway will be replaced at the next refueling outage and that no other corrective action is required. The NRC finds this acceptable since (1) the inspections performed in the tubesheet region, based on your safety assessment and the analysis in WCAP-15932, provide reasonable assurance of tube integrity in this area of the tube bundle until your next outage, (2) you plan to replace your SGs next outage and the tubes in these replacement SGs will be fabricated with thermally treated Alloy 690 which is intended to reduce the likelihood of stress corrosion cracking in this region, and (3) we expect you will follow the regulatory requirements as given in GL 2004-01 when these new SGs are installed.

This letter closes out TAC No. MC4806. If you have any questions regarding this matter, please contact me at (301) 415-1307.

Sincerely,

/RA/

Jack Donohew, Senior Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-483 DISTRIBUTION:

PUBLIC LLund cc: See next page PDIV-2 Reading MBanerjee RidsNrrDlpmLpdiv (HBerkow)

RidsNrrDlpmLpdiv2 DCollins RidsNrrDlpmDpr RidsNrrPMJDonohew RidsNrrLALFeizollahi RidsOgcRp RidsAcrsAcnwMailCenter RidsRegion4MailCenter (BJones)

ACCESSION NO.: ML051940401 NRR-106 OFFICE PDIV-2/PM PDIV-2/LA EMCB-C/SC PDIV-2/(A)SC NAME JDonohew:sp LFeizollahi LLund DCollins DATE 7/15/05 7/18/05 07/15/2005 7/19/05 DOCUMENT NAME: E:\\Filenet\\ML051940401.wpd OFFICIAL RECORD COPY

Updated: July 2005 Callaway Plant, Unit 1 cc:

Professional Nuclear Consulting, Inc.

19041 Raines Drive Derwood, MD 20855 John ONeill, Esq.

Shaw, Pittman, Potts & Trowbridge 2300 N. Street, N.W.

Washington, D.C. 20037 Mr. Mark A. Reidmeyer, Regional Regulatory Affairs Supervisor Regulatory Affairs AmerenUE P.O. Box 620 Fulton, MO 65251 U.S. Nuclear Regulatory Commission Resident Inspector Office 8201 NRC Road Steedman, MO 65077-1302 Mr. Les H. Kanuckel Manager, Quality Assurance AmerenUE P.O. Box 620 Fulton, MO 65251 Missouri Public Service Commission Governor Office Building 200 Madison Street Jefferson City, MO 65102-0360 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Mr. Mike Wells, Deputy Director Missouri Department of Natural Resources P.O. Box 176 Jefferson City, MO 65101 Mr. Rick A. Muench President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KA 66839 Mr. Dan I. Bolef, President Kay Drey, Representative Board of Directors Coalition for the Environment 6267 Delmar Boulevard University City, MO 63130 Mr. Lee Fritz, Presiding Commissioner Callaway County Court House 10 East Fifth Street Fulton, MO 65151 Mr. David E. Shafer Superintendent, Licensing Regulatory Affairs AmerenUE P.O. Box 66149, MC 470 St. Louis, MO 63166-6149 Mr. Keith D. Young Manager, Regulatory Affairs AmerenUE P.O. Box 620 Fulton, MO 65251 Mr. Scott Clardy, Director Section for Environmental Public Health P.O. Box 570 Jefferson City, MO 65102-0570 Certrec Corporation 4200 South Hulen, Suite 630 Fort Worth, TX 76109 Director, Missouri State Emergency Management Agency P.O. Box 116 Jefferson City, MO 65102-0116