Malta A/ec Point Beach Nuclear Plant

' T PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

April 24,2004 Time:

.0300 Preparer-T. R. Branam NOTE:

Referto base procedure NP 10.3.6forsafety assessmient checkist KSFdefinitions.

U I

R 28 NOTE. !F~heniviifyel h~as been removed froms tote reactor vessel and refueling cavity -ill key safeiyfunctions are GREEN ecenispentfuilpool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False 0, Yes/True I through 4 REACTIVITY Subtotal Condition

1.

RCS Boron concentration = 2979 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C (0-1) 1 0-1 RED

2.

Number of boration paths (0-2) 2 2

ORANGE

3.

No fuel motion--

(0-1) 1 3-4

4.

SR instrumentation operable (0-1) 1 5

CiGEEN-7 Subtotal 5

CORE COOLING Subtotal Condition

1.

Number 6f SG available for DHR (0-2) 0 0-1 RED

2.

Refueling cavity filled (0-1) 1 2

ORANGE

3.

Nurbde of trains RHR available (0-2) 2 3

ay!_

4.

RCS levei above REDUCED INVENTORY (0-1) 1 4-5 r2E EN

.N RCS TEMP =90F; 21 days shutdown, Subtotal 4

RCS Level = Control Rod Latch Height An RCS Time to Boil 22 hrs (Applicable at Cold or Refueling Shutdown) t*,

POWER AVAILABILITY Subtotal C nditloui

1.

Independent off-site power sources 1

, RED available to A-05 and A-06 (totally 2

ORANGE independent at the 4160 V, 13.8 kV, 3

and 345 kVlevels)

(0-2) 2 4-5

2.

G-01 or G-02/A-05/B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1

3.

G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil > 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 0 Subtotal 4

INVENTORY Subtotal Condition

1.

Pressuriher level 220 percent w/head on 0-1 RED (0-1) 0 2

ORANGE

2.

Refueling Cavity filled (see definition)

(0-3) 3 3

3.

RCS level above REDUCED INVENTORY (0-1) 1 4

IGREEN1

4.

Makeup from VCT/BLENDER and/or RWST available (0-2) 1 Subtotal 5

Informatlon In this rarnrd woe daTfP#A A

_.......,~uu nIUb UIxIL~tU n accordance with the Freedom of Information PBFR1s62 Act, ee tS i of 9 Revision 2103/2FIIo C,~_ 106 Rererences: NP 103.6 NP 10.2;1

Point Beach Nuclear Plant

'

  • PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST i

CONTAINENT

1.

Containment integrity (TS 15.1.D) (Containment Operable) {ITS TS 3.6.1} set

2.

Containment Closure CL-IE maintained and clostire' ii 'me to boil

3.

No fulel motion.,

4.

DI-IR Capability cavity flooded and internals out OR-at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (O or 2) 2 (0-1)

..1

  • Subtol 0

2-3.

4-5-6.

tal Condition RED '

ORANGE

,, t.-FT,0 "

14......... ~ -

(0-l). I Subtotal

`'4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take creditfor only one P-12 independent offsite power source during periods of single X-03 or X-04 availability (*).

Subtotal Condition 1 A, SFP cooling pumrip available 0-1 2

RED.,

with power available from:

2 ORANGE.

G-62orG-0Ivia2B-32 (0-1) na

3.

YELLOW fainiundependent off-site power 4-5 GREEN

.,dsource different than that for Train B below'

2.

ABE SFP cooling pump available with power available from:

G-03 or G-04 via 1B-42 in andependert off-site power

source different'thaxithat for Tra'"

above

3.

Temporary power available to one SFP cooling pump, 6-05 available, and SFP time to boil 2 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />s:,.

(0-1).

n/a n/a

  • (0I) n/a (0-1) n/a SFP Temperatures:

NW n/a OF SE n/a OF SFP Average Temp n/a SFP Time to Boil n/a Subtotal =

nla OF GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

PBF-1562 Rcvision 2 10/30102

References:

NP 103.6 NP 101.1 Page 2 of 9

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

I DATE:

April 24, 2004 TIME:

0300 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

CONTAINMENT:

SFF COOLING:

GREEN GREEN GREEN GREEN GREEN NA PROTECTED EQUIPMENT:

COMMENTS:

Unit 1 is in Mode 6 Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency RCS Time to Boil is 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> Refueling Cavity is full Hot Leg Vent Path is the Pressurizer manway PBF-1562

References:

Revision 2 10/30/02 Page 5 of 9

-,I NP 10.3.6 NP 10.2.1