Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda Tuesday Apr11 20, 2004 Start Time:
0600 NSB Cafeteria BRIEFING NOTES ATTENDEES Shift Outage Directors Shift Outage Managers (SOM)
Operations Coordinators (SOC)
Maintenance Coordinators (MOC)
Engineer/ Projects Coordinators (EOM)
Rad Protection Manager (RPM)
Site Safety Coordinator (SSC)
Shutdown Safety Assessor (SSA)
Site Management (SSM)
General Supervisors First Une Supervisors Agenda.
- 1. Safety Issue Discussion (SSC)
- 2.
Radiation Protection (RPM)
- 3. Operations Coordinator Turnover (SOC)
- 4. Shutdown Safety Assessment (SSA)
- 5.
Maintenance Coordinator Turnover (MOC)
- 6.
Engineering Coordinator Turnover (EOM)
- 7.
Major Projects Update (EOM)
- 8. Schedule Review (SOM)
- 9. Work Activity Risk-Manager Assignment (SOM)
- 10. Management Expectations (SSM)
- 11. ACEMAN Assessment Results (SOM)
- 12. Shift Goals (SOM)
Items Included In Daily Package:
Site Communication Safety Snippet Outage Alara Report Outage Status Report Shutdown Safety Assessment Outage Schedule Operating Unit Schedule Work Activity Risk Assignment information In this record was deleted in accordance with tpe Freedom of Information Act, exptions 1
FO lA-
Site Communication Revised 4/12/04 Priorities:
- The Safe Operation of Unit 2
- Safely Commence Scheduled Outage Work Activities on Unit I and Common Systems Using Unit 1 R28 Recovery and Restart Checklist 1St Priority Increase RCS Inventory and Exit Safety Assessment "Yellow" Conditions on Core Cooling and Inventory 2nd Priority Focused Specialty Activities
-SG Eddy Current and Sludge Lancing
-Main Turbine and Generator Work
-Rx Vessel Head Inspection
-Hx Hydro Lance and Eddy Current 3'd Priority Remaining Scheduled Work Communication Improvement Initiatives Due to the recent problems encountered with outage activities, changes are being made to improve communication and turnovers and to focus our efforts on achieving all green shutdown safety assessment parameters. Effective 4/13/2004 at 0600 the following expectations are in effect:
Outage Briefing Schedule - NSB Cafeteria:
Day Shift Night Shift Activi 0600-0640 1800 - 1840 O
u vr CC Turnover 0645- 0725 1845 - 1925 Supervisor Communication of OCC Turnover to Work Force 0730- 0800 1930-2000 Supervisor Feedback to OCC of Turnover to Work Force
- Outage Briefing Schedule Notes:
- The following personnel are required to attend the OCC turnover meeting:
Upcoming shift supervisory personnel, General Supervisors, temporary supervisors, managers, and other personnel performing in a supervisory capacity for outage activities.
- Attendance will be taken at the OCC turnover meeting.
- It is recognized that this will result in longer durations for the outage. Since the safest place to be is on schedule, the outage schedule is being revised to include these meetings.
Very few exceptions will be made to the briefing schedule requirement. The OCC will control all exceptions.
Additional Changes:
- Just in Time Information Sharing identified in the Priority Working Schedule shall be developed and presented for the associated significant task.
- A responsible Manager will be assigned to selected work activities as directed by the OCC. These managers will monitor the job from pre-job briefing through completion or end of their shift.
These changes are being implemented immediately. Please provide feedback to your supervisor on ways to improve this process.
2
Comnmited to Nuclear ExcllencelE Point Beach Nuclear Plant U1R28 Refueling Outage
.SafW t 0 Aifoidw k f Airl i'-24
~:
Theme for the week This week's theme Is Outage Reminders. An outage puts tremendous stress on all Individuals Involved.
This stress Is an accumulation of several factors including long work hours, poor nutrition habits, schedule adherence, unanticipated events and other Items to numerous to mention. We must all remember to take care of each other, our families and ourselves during this time.
Daily Safety Snippets Sunday "Remember to use STAR and you will shine" STAR is an acronym we can rely on to keep us on track for a successful outage. Stop - Think - Act and Review It Is as simple as that.
Monday "Three way communication is a key communication tool" "I understand Three way communication is a key communication tool" "That is correct" Three way communication is not just a good Idea it is a great process that we can use to dearly define the message sent was In fact the message heard. Hold each other accountable for the use of this practice and soon K will become standard.
Tuesday "Avoid and recognize error likely situations Distractions and Unfamiliar tasks are Just two of the 'error likely situations that we could encounter of a daily basis. As an example of the consequences of this error situation, consider what happened at Calvert Cliffs in January 2004. Three workers, one being a student employee, were sent to empty salt from a dump truck. The two experienced workers were called away, leaving the student to finish. He brushed salt off an auger with his hand when his hand was caught a pulled Into the machine.
Wednesday "Follow the schedule or risk dancing with the devil (or Shift Outage birector)"
OE1 7554 - October 2003 Quad Cities - While performing scheduled cleaning In the condensate demineralizer, the crew noticed the atmospheie had become hazy. Upon exiting the space they found out welding was going on in a nearby heat exchanger and the turbine building ventilation was shut off for work.
Following the schedule helps to prevent such competing activities.
Thursday "Be cducated-not medicatee Is the outage giving you a headache? Remember many people suffer serious side effects from the use of aspirin, laxatives, cold remedies, vitamins, herbals and diet aids. Misusing the product - like using too much, often causes reactions. More Is not necessarily better. Recommended dosages are determined by the amount needed to achieve the desired effect without causing other problems.
Friday "If the heat is making you sick, get out of the area quick."
OE17082 - September 2003 Fort Calhoun - RP technician working the In the lower cavity started experiencing heat stress symptoms. Rather than stopping the job and exiting the area, he decided to continue. The result was an ambulance ride to the local hospital of a contaminated worker. Do we all remember the signs of heat stress?
Saturday "On/v fools would not use their error reduction tools" A reminder to use your error reduction tools for every Job and every task, these Include: Co-worker coaching, challenging information, peer checking, place keeping and procedure use and adherence to name lust a few.
6
I Y
Point Beach Nuclear Plant Outage 1 R28 DAY Supporting Operational Excellence Outaae Radiation Performance Path 15 Picture Meets I
M 411--4 0....
A.
I I
I VJ~~I I &IVIVU L I~I.U J
- 3.
A gA This indicator measures cumulative dose radiation exposure and total number of personnel-contamination events (PCE's > 5000 cpm) during refueling outages. The dose indicator is measured in Rem and individual PCE-events.
Meets:
<=75 Rem Actual Cum.
Exceeds:
<=71 Rem Dose:
25.017 Rem Day 15 - Apnl t 8 Actual = 0.507 Cumulative = 25.017 Cumulative Forecast - 51.394 Meets: <= 18 Exceeds: <= 12 ActualPCE's:
5 U
6 Stu Thomas i
Personnel Contamination Events Cummulative Dose Exposure 20 18 a 16 X 14 1 12 X 10 4
2 0-I II I
I I
I .. I.
I 1-I I. I..
Actual
-y Forecast i~Goal E
0:
S0 eo,-'
l l
Actuall
,l
- Forecast 40 I
goal 20 21 1
0 2
4 6
e 10 12 14 16i 18 20 22 24 26 0 2 4 6 8 10121416182022242628303234
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:
1 DATE:
April 20, 2004 TIME:
0200 KEY SAFETY FUNCTIONS:
REACTIVITY:
CORE COOLING:
POWER AVAILABLE:
INVENTORY:
CONTAINMENT:
SFP COOLING:
GREEN YELLOW GREEN YELLOW GREEN NA PROTECTED EOUIPMENT:
COMMENTS: