ML051920071
| ML051920071 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 04/17/2004 |
| From: | Hastings R Nuclear Management Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| FOIA/PA-2004-0282 | |
| Download: ML051920071 (4) | |
Text
,Ic Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:
April 17, 2004 Time:
0200 Preparer:
Randy Hastings U
I R
28 NOTE:
Refer to base procedure NP 10.3.6for safety assessment checklist KSF definitions.
NOTE:
IWheneverfitel has been reniovedfroin the reactor vessel and refueling cavity, al key safetyfunctions are GREEN except spentfiuelpool cooling.
KEY SAFETY FUNCTION CRITERIA: No/False = 0. Yes/True = 1 through 4 REACTIVITY
- 1.
RCS Boron concentration = 2890 ppm a.)
For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)
For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C
- 2.
Number of boration paths
- 3.
No fuel motion
- 4.
SR instrumentation operable Subtotal Condition RED ORANGE CE>
(0-1) 1 (0-2) 2 (0-1) 1 (0-1) 1 0-1 2
3-4 5
Subtotal =
5 CORE COOLING Subtotal Condition
- 1.
Number of SG available for DHR (0-2) 0 0-1 RED
- 2.
Refueling cavity filled (0-1) 0 2
- 3.
Number of trains RHR available (0-2) 2 3
L L?
- 4.
RCS level above REDUCED INVENTORY (0-1) 1 4-5 GIEE; RCS Temperatures derived from T/Cs TE04 and TE06.
RCS TEMIP = 96"F; 14 days shutdown; RCS 70%
Subtotal =
3 RCS Time to Boil 52 min (Applicable at Cold or Refueling Shutdown)
POWER AVAILABILITY Subtotal Condition
- 1.
Independent off-site power sources 1
RED available to A-05 and A-06 (totally 2
ORANGE independent at the 4160 V. 13.8 kV, 3
and 345 k-V levels)
(0-2) 2 4-5
- 2.
G-01 or G-02/A-05/B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1
- 3.
G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
(0-1) 0 Subtotal =
4 INVENTORY Subtotal Condition
- 1.
Pressurizer level Ž20 percent w/head on 0-1 RED (0- )
0 2
- 2.
Refueling Cavity filled (see definition)
(0-3) 0 3
I YELLOW
- 3.
RCS level above REDUCED INVENTORY (0-1) 1 4
1l"ii_
- 4.
Makeup from VCTIBLENDER and/or RWST available (0-2) 2 Subtotal =
3
.....,,,.,,reur was deleted in accordance with t Freedom of Information Act, ee Vtioonsrmtir PBF-1562
/30/0 Pag_1o Revision 2 10/30102
/Pane I of 9 S-7 4t
References:
NP 10.3.6 NP 10.2.1
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIE CONDITION CIECKLIST CONTAINMENT
- 1.
Containment integrity (TS 15.1.D) (Containment Operable) (ITS TS 3.6.11 set
- 2.
Containment Closure CL-1E maintained and closure < time to boil
- 3.
No fuel motion
- 4.
DHR Capability:
cavity flooded and internals out OR at leasi one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut
( or 4) 0 (O or 2) 2 (0-1) 1 Subtotal 0
l 2-3 4-5-6 Condition RED ORANGE
_-ED (0-1) 1 Subtotal =
4 SPENI (ONLY APPLICABLE when NOTE:
Take creditforonly one P-12 independent
- 1.
'A" SFP cooling pump available with power available from:
G-02 or G-0I via 2B-32
-(*) an independent off-site power source different than that for Train B below
- 2.
"B" SFP cooling pump available with power available from:
G-03 or G-04 via IB-42
.(*)
an independent off-site power source different than that for Train A above
- 3.
Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil a 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
SFP Temperatures:
MV n/a 0F SE n/a OF SFP Average Temp n/a OF SFP Time to Boil n/a r FUEL POOL COOLING starting AND during FULL CORE OFFLOADS) offsitepowersource during periods of single X-03 or X-04 asailability (*).
Subtotal Condition 0-1 RED 2
ORANGE (0-1) n/a 3
YELLOW 4-5 GREEN (0-1) n/a (0-1) n/a (0-1) n/a (0-1) n/a Subtotal =
nla GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:
No change from previous shift.
PBF-1562 Revision 2 10/30102
References:
NP 10.3.6 NP 10.2.1 Page 2 of 9
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:
1 DATE:
April 17,2004 TIMNE:
0200 KEY SAFETY FUNCTIONS:
REACTIVITY:
CORE COOLING:
POWER AVAILABLE:
INVENTORY:
CONTAINMENT:
SFP COOLING:
GREEN YELLOW GREEN YELLOW GREEN N/A PROTECTED EQUIPMENT:
c1ZZ
CLIENTS:
Fire Protection Condition III: Crediting existing fire rounds as fire prevention contingency RCS Time to Boil is 52 minutes RCS is at 70% Reactor Vessel Level Hot Leg Vent Path is the Pressurizer Manway PBF-1562 Revision 2 10/30/02
References:
NP 10.3.6 NP 10.2.1 PageS5 of 9
9+.