PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 JUN.2 9 2005 LR-N05-0320

/ PSEG NuclearLLC U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-001 2004

SUMMARY

OF REVISED REGULATORY COMMITMENTS HOPE CREEK GENERATING STATION DOCKET NO. 50-354 FACILITY OPERATING LICENSE NUMBER NPF-57 In accordance with the Nuclear Energy Institute (NEI) process for managing Nuclear Regulatory Commission (NRC) commitments, this correspondence is being submitted to discuss a commitment that has been changed, but not reported by other means.

LER 354196-008-01, Plant Operation With Control Rod Withdrawal Speeds Outside of Design Basis Due to Mis-Adjustment of the Control Rod Drive System Flow Control Needle Valves This LER included a commitment to ensure that as found control rod speeds are adjusted to with 10% of the allowed value. A subsequent engineering evaluation has determined that the 10% speed band is not desirable for optimum notch control. The new criteria have been included in the UFSAR.

Should there be any questions please contact Robin Ritzman at (856) 339-1445.

Sincerely, George P. Barnes Site Vice President - Hope Creek 4_Zo-95-2168 REV. 7199

Document Control Desk 2

LR-N05-0320 C

Mr. Sam Collins Regional Administrator USNRC, Region 1 475 Allendale Road King of Prussia, PA 19046 U. S. Nuclear Regulatory Commission ATTN: Mr. Dan Collins Licensing Project Manager - Hope Creek Mail Stop 08B2 Washington DC 20555-001 USNRC Senior Resident Inspector (X24)

Mr. K. Tosch, Manager, IV Bureau of Nuclear Engineering PO Box 415 Trenton, NJ 08625