MONTHYEARML24023A0392024-01-22022 January 2024 NEI Comments on the Information Collection Renewal for Domestic Licensing of Special Nuclear Material, Docket Id NRC-2023-0118 ML23355A1972023-12-14014 December 2023 NEI, Comments on NRC Draft Resolution of SFAQ 2022-02, SAE Program Requirements ML23219A1672023-10-25025 October 2023 Response Letter to Fee Exemption Request for Pre-Submittal Activities, Review, and Endorsement of NEI 20-07 ML23270B9002023-09-27027 September 2023 NEI Letter Request for an Extension of Comment Period on Proposed Revision to Standard Review Plan Section 15.0, Introduction - Transient and Accident Analyses, Docket Id NRC 2023 0079 ML23268A0102023-09-22022 September 2023 NEI, Fee Exemption Request for Endorsement, Review and Meeting to Discuss Draft Nuclear Energy Institute Technical Report NEI 23-01, Operator Cold License Training Plan for Advanced Nuclear Reactors ML23241A8612023-08-25025 August 2023 Consolidated Industry Comments to NRC Regulatory Issue Summary 2023-02, Scheduling Information for the Licensing of Accident Tolerant, Increased Enrichment, and Higher Burnup Fuels ML23236A4992023-08-24024 August 2023 Industry Feedback on Region II Fuel Cycle Facility Construction Oversight Workshop Held August 15, 2023, and Suggested Topics for Additional Public Meetings in Fall 2023 ML23256A1622023-08-0101 August 2023 Incoming NEI Letter Dated August 1, 2023 Regarding Increase in Fees 2023-2025 ML23206A0292023-07-24024 July 2023 Incoming Fee Exemption Request for Pre-Submittal Activities, Review, and Endorsement of NEI 20-07 ML23143A1232023-06-22022 June 2023 NRC Fee Waiver Request for Draft NEI 23-01 ML23200A1662023-05-30030 May 2023 NEI Proposed Metrics for a Performance-Based Emergency Preparedness Program ML23116A0732023-05-25025 May 2023 Letter to Hillary Lane in Response to a Request for a Fee Exemption for NEI 23-03 ML23135A7332023-05-0909 May 2023 NEI Comments on NRC Safety Culture Program Effectiveness Review ML23110A6752023-04-18018 April 2023 04-18-23_NRC_Fee Waiver for NEI 23-03 ML23110A6782023-04-18018 April 2023 Request for Review and Endorsement of NEI 23-03, Supplemental Guidance for Application of 10 CFR 50.59 to Digital Modifications at Non-Power Production or Utilization Facilities ML23110A6762023-04-18018 April 2023 04-18-23_NRC_NEI 23-03 Review + Endorse ML23107A2302023-03-31031 March 2023 NEI Letter, to Andrea Veil, NRC, Regarding Industry Recommendations for a 10 CFR 50.46a/c Combined Rulemaking ML23138A1662023-03-24024 March 2023 Transmittal of NEI 22-05 Revision a, Technology Inclusive Risk Informed Change Evaluation (Tirice) Guidance for the Evaluation of Changes to Facilities Utilizing NEI 18-04 and NEI 21-07 ML23083B4622023-03-24024 March 2023 Transmittal of NEI 22-05 Revision a, Technology Inclusive Risk Informed Change Evaluation (Tirice) Guidance for the Evaluation of Changes to Facilities Utilizing NEI 18-04 and NEI 21-07 ML23060A3272023-03-0101 March 2023 NEI, Wireless Cyber Security Guidance ML23060A2142023-03-0101 March 2023 NEI, Request for NRC Endorsement of NEI White Paper, Enabling a Remote Response by Members of an Emergency Response Organization, Revision 0 ML23023A2752023-01-23023 January 2023 Request for Extension of Comment Period from the Nuclear Energy Institute on PRM-50-124 - Licensing Safety Analysis for Loss-of-Coolant Accidents ML22348A1122023-01-17017 January 2023 Letter to Richard Mogavero Response to Fee Exemption NEI 08-09 Revision 7 ML22353A6082023-01-11011 January 2023 U.S. Nuclear Regulatory Commission Report of the Regulatory Audit of the NEI-Proposed Aging Management Program Revision to Selective Leaching Program (XI.M33) ML22349A1012022-12-12012 December 2022 LTR-22-0343 Ellen Ginsberg, Sr. Vice President, General Counsel and Secretary, Nuclear Energy Institute, Expresses Concerns Related to Issuance of Regulatory Issue Summary 2022-02; Operational Leakage ML22336A0372022-11-16016 November 2022 Fee Exemption Request for NEI 08-09 Revision 7 - Changes to NEI 08-09 Cyber Security Plan for Nuclear Power Reactors ML22321A3152022-11-16016 November 2022 NEI Letter with Comments on Significance Determination Process Timeliness Review ML22298A2262022-10-25025 October 2022 Endorsement of NEI 15-09, Cyber Security Event Notifications, Revision 1, Dated October 2022 ML22298A2302022-10-17017 October 2022 Submittal of NEI 22-03, Draft Revision 0, Nuclear Generation Quality Assurance Program Description ML22207B6512022-07-26026 July 2022 NEI, Full Fee Exemption Request for Industry Guidance Proposal - Weather Related Administrative Controls During Transient Outdoor Dry Cask Operations ML22195A1662022-07-14014 July 2022 NEI, Draft G of NEI 99-01, Development of Emergency Action Levels for Non-Passive Reactors, Revision 7 ML22195A0202022-07-13013 July 2022 07-13-22 NRC Fee Exemption Request for NEI 21-05 Review ML22195A0672022-07-13013 July 2022 Fee Exemption Request for Review and Meeting to Discuss Draft Nuclear Energy Institute Technical Report NEI 21-05, Reporting Guidance for Licensees with Risk-Informed Licensing Bases ML22159A2772022-06-28028 June 2022 Response Letter to Richard Mogavero for Fee Exemption for the Nuclear Regulatory Commission Review Ad Endorsement of NEI 15-09, Revision 1 ML22153A2782022-06-0202 June 2022 Nie, Fee Exemption Request for Endorsement of NEI 15-09, Cyber Security Event Notifications, Revision 1, Dated May 2022 ML22154A2962022-06-0202 June 2022 LTR from R. Mogavero to M. Sampson Dated Jun 2 2022 Endorsement of NEI 15-09 Cyber Security Event Notifications Rev 1 Dated May 2022 ML22152A2712022-06-0101 June 2022 Digital Instrumentation and Control Common Cause Failure Policy Considerations, Revision 1 ML22143A9362022-05-20020 May 2022 May 13, 2022, Public Meeting on Draft Regulatory Issue Summary Operational Leakage, 87 Fed. Reg. 2361 (Jan. 14, 2022) (Docket Id NRC-2021-0173) ML22110A1752022-05-0303 May 2022 NRC Response to the Nuclear Energy Institute April 1, 2022, Letter, Regarding the Nrc'S CUI Implementation Plan ML22109A2082022-04-0808 April 2022 April 8, 2022, NEI White Paper on Digital Instrumentation and Control Common Cause Policy Considerations Version 2.0 ML22110A1782022-04-0101 April 2022 April 1, 2022, Letter from NEI Regarding Nrc'S Controlled Unclassified Information Program Implementation ML22048A5812022-02-16016 February 2022 NEI 22-02: Guidelines for Weather-Related Administrative Controls for Short Duration Outdoor Dry Cask Storage Operations ML22019A2922022-01-12012 January 2022 NEI, Submittal of Proposed Revisions to Aging Management Programs XI.M33, Selective Leaching and XI.E3, Inaccessible Power Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements ML21343A2922021-12-0808 December 2021 NEI, Transmittal of NEI 21-07 Revision 0-B, Technology Inclusive Guidance for Non-Light Water Reactor Safety Analysis Report: for Applicants Utilizing NEI 18-04 Methodology ML21337A3802021-12-0303 December 2021 NEI Technical Report NEI 17-06 - Guidance on Using Iec 61508 SIL Certification to Support the Acceptance of Commercial Grade Digital Equipment for Nuclear Safety Related Applications, Revision 1 ML21319A3522021-11-10010 November 2021 NRC NEI Fee Waiver Request Changes to NEI 10-04 and NEI 13-10, Dated November 10, 2021 ML21306A3652021-10-29029 October 2021 NEI Letter from D. Young to NRC S. Atack to Cease Work on Draft D of NEI 20-05, Methodological Approach and Considerations for a Technical Analysis to Demonstrate Compliance with the Eligibility Criteria of 10 CFR 73.55(a)(7) ML21342A1682021-10-29029 October 2021 Letter from W. Gross to S. Atack, Endorsement of Nuclear Energy Institute 10-04, Identifying Systems and Assets Subject to the Cyber Security Rule, Revision 3, Dated October 29, 2021 ML21342A2032021-10-29029 October 2021 Letter from W. Gross to S. Atack, Endorsement of Nuclear Energy Institute 13-10, Cyber Security Control Assessments, Revision 7, Dated October 29, 2021 ML22081A2002021-10-29029 October 2021 NEI Backfitting Concerns with NRCs Developing Position on Protection of Dry Storage Systems from Natural Phenomena During Short Term Operations 2024-01-22
[Table view] |
Text
July 20, 2005 Mr. Alexander Marion Senior Director, Engineering Nuclear Generation Division Nuclear Energy Institute 17761 I Street, NW, Suite 400 Washington, DC 20006-3708
SUBJECT:
PROJECT NUMBER: 689 U.S. NUCLEAR REGULATORY COMMISSION (NRC) RESPONSE REGARDING THE WHITE PAPER ON CARBON DIOXIDE (CO2) FIRE SUPPRESSION SYSTEM DESIGN CHANGES
Dear Mr. Marion:
On January 31, 2005, you submitted a white paper on Carbon Dioxide Suppression System Design Changes for our review (ADAMS Package ML050320125). We have completed our review and provided our comments in the enclosure.
Licensees who wish to make design changes to their CO2 fire suppression systems must evaluate whether prior NRC approval is needed in accordance with their current licensing basis.
Potential plant security implications associated with the CO2 fire suppression systems design changes must be addressed in accordance with the references identified in the enclosure.
Thank you for your assistance in resolving this issue. Please contact Dr. Sunil Weerakkody or Mr. Naeem Iqbal of my staff if you have additional questions.
Sincerely,
/RA/
James E. Lyons, Director Division of Systems Safety and Analysis Office of Nuclear Reactor Regulation
Enclosure:
As stated
ML051740050 NRR-106 OFFICE SPLB/DSSA/NRR SC:SPLB/DSSA/NRR BC:SPLB/DSSA/NRR BC:IROB/DIPM/NRR NAME NIqbal SWeerakkody JHannon PHiland DATE 06 / 23 /05 06/ 29 /05 06 / 29 /05 07 / 11 /05 OFFICE OGC D:DSSA/NRR NAME STreby JLyons DATE 07 / 15 /05 07 / 20 /05 NRC COMMENTS REGARDING THE NUCLEAR ENERGY INSTITUTE (NEI) WHITE PAPER ON CARBON DIOXIDE SUPPRESSION SYSTEM DESIGN CHANGES The following are the Nuclear Regulatory Commission (NRC) staffs comments to the key positions set out in the NEI white paper.
- 1. Licensees who elect to convert an automatic CO2 fire suppression system to manual actuation should consider alternate fire suppression methods that reduce the potential for personnel hazards and maintain nuclear safety and security. The staff also recommends that, along with the conversion to a manually actuated system, the licensees provide adequate measures to (a) enhance the reliability of the manual fire fighting capability and (b) reduce the potential personnel hazards.
- 2. Licensees who elect to perform CO2 fire suppression system design changes that add operator manual actions, including conversion to manual actuation, should also consider the impact of those changes on plant security. NRC requirements for the physical protection of nuclear power plants (NPPs) are set forth in 10 CFR Part 73 Physical Protection of Plants and Materials. The physical protection requirements are further supplemented by various security Orders (e.g., EA-02-026, February 25, 2002, "Interim Safeguards and Security Compensatory Measures," EA-03-086, April 29, 2003, Revised Design Basis Threat for Operating Power Reactors", and other security related orders for operating reactors as applicable), Advisories, other generic communications, and plant specific security commitments. Licensees who implement changes to their plant must ensure that compliance with the physical protection requirements, security orders and subsequent rulemaking and adherence to their commitments applicable to their plant are maintained.
- 3. Licensees who elect to make design changes to an automatic CO2 fire suppression system are provided with three options in the white paper. The white paper includes a design change option to completely eliminate the CO2 fire suppression system for a very limited number of applications. The licensees who choose this option should consider the following:
! If the CO2 system is not replaced with a system that provides an equivalent level of fire protection, this option results in a compromise of the fire protection defense-in-depth (DID) element, i.e., rapidly detecting and controlling and extinguishing a fire promptly.
Since providing and maintaining DID is a fundamental requirement for NPP fire protection program (FPP), complete elimination of the CO2 system from an area containing safety-related systems and equipment most likely would adversely affect the ability to achieve and maintain safe shutdown in the event of a fire. 10 CFR 50.48(a) requires a fire protection plan to satisfy Criterion 3 of Appendix A to 10 CFR 50.
Licensees must ensure that compliance with this regulation is maintained. A licensee contemplating this option must perform an analysis of the change that considers the impact to DID and safety margin to demonstrate that there will be no adverse affect on safe shutdown. Most likely, licensees exercising this option would require prior NRC approval, whether they are pre- or post-79 plants.
- 4. Licensees who choose to use the guidance provided in white paper regarding interim and long term compensatory measures for making changes to an automatic CO2 system should consider the following:
ENCLOSURE
! If a licensee plans to use a compensatory measure as a permanent solution, that licensee must determine whether prior NRC approval is required. These solutions must be incorporated into the FPP.
! For a degraded or an inoperable CO2 fire suppression system, e.g., when the system is being converted from an automatic to manual actuation, compensatory measures should be put in place in accordance with the approved FPP.
! The licensees should review and consider the guidance provided in Regulatory Issue Summery (RIS) 2005-07, Compensatory Measures to Satisfy the Fire Protection Program Requirements, for alternate compensatory measures. Another source of information is Generic Letter 91-18, Revision 1, Information to Licensees Regarding NRC Inspection Manual Section on Resolution of Degraded and Nonconforming Conditions, dated October 8, 1997, which includes a discussion of compensatory measures and timely corrective actions.
- 5. Licensees may elect to use risk-informed methods to justify CO2 system design changes.
However, if a licensee has not adopted 10 CFR 50.48(c) (NFPA 805), then the licensee must ensure that applicable technical (e.g., PRA Quality) and licensing basis requirements are met, and must obtain an exemption or a license amendment.
- 6. On pages 4-5, the white paper includes a discussion on regulatory implications that a licensee must consider regarding the CO2 fire suppression system design changes. The staff suggests the following for a 5th bullet on page 5:
! Is the automatic CO2 fire suppression system relied upon by the licensee to meet the requirements of the approved FPP? If so, determine if this change constitutes an adverse affect on plant fire safe-shutdown (FSSD).
- 7. On pages 5-6, the white paper includes a section entitled Determining Need for Prior NRC Approval. The first paragraph of this section recommends that licensees having the standard fire protection license condition that was published in Generic Letter 86-10, Implementation of Fire Protection Requirements, perform an evaluation using NEI 02-03, Guidance for Performing a Regulatory Review of Proposed Changes to the Approved Fire Protection Program, to determine if a design change in the CO2 fire suppression system would adversely effect the ability to achieve and maintain FSSD. The staff notes that NEI 02-03 has not been endorsed by the NRC for the determination of adverse affect on plant FSSD.