ML051600103

From kanterella
Jump to navigation Jump to search

Independent Spent Fuel Storage Installation; Supplement to License Amendment Request for Technical Specifications Revision to Support the ISFSI NUHOMS-32P Upgrade
ML051600103
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 06/07/2005
From: Vanderheyden G
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
+KBR1SISP20050609
Download: ML051600103 (4)


Text

George Vanderheyden Vice President Calvert Cliffs Nuclear Power Plant Constellation Generation Group, LLC 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410.495.4455 410.495.3500 Fax I

Constellation Energy June 7, 2005 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

SUBJECT:

Document Control Desk Calvert Cliffs Nuclear Power Plant; Unit Nos. 1 & 2; Docket Nos. 50-317 & 50-318 Independent Spent Fuel Storage Installation; Docket No. 72-8 Supplement to License Amendment Request for Technical Specifications Revision to Support the ISFSI NUHOMS-32P Upgrade

REFERENCES:

(a)

Letter from Mr. G. Vanderheyden (CCNPP) to Document Control Desk (NRC), dated December 12, 2003, License Amendment Request: Revision to the Technical Specifications to Support the ISFSI NUHOMS-32P Upgrade (b) 10 CFR 72.214, List of Approved Spent Fuel Storage Casks, Certificate Number 1004 (c)

Telecon with NRC staff, May 26, 2005 By Reference (a) we submitted a license amendment request to incorporate Technical Specification changes to support the Calvert Cliffs Independent Spent Fuel Storage Installation (ISFSI)

NUHOMS-32P Upgrade. In that request we indicated that for Technical Specification Surveillances 4.2.1.1 and 4.2.1.2 increasing the initial verification of boron concentration from "within one hour" to "within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />" was consistent with the provision for verification of boron concentration approved for the NUHOMSO general license. The approved surveillance time for NUIHOMS0 general license is four hours (contained in Certificate Number 1004, Reference b).

Per our telecon with your staff (Reference c), we propose to increase the surveillance time from "within one hour" to "within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />" consistent with the provision for verification of boron concentration approved for the NUHOMSO general license. This letter supersedes our proposed revision to Technical Specification Surveillances 4.2.1.1 and 4.2.1.2 in Reference (a). The Technical Specification marked-up page contained in Attachment (1) supersedes the marked-up page provided in Reference (a).

Att\\~sb

Document Control Desk June 7, 2005 Page 2 Should you have questions regarding this matter, please contact Mr. L. S. L rragoite at (410) 495-4922.

Very trul orS, STATE OF MARYLAND TO WIT:

COUNTY OF CALVERT I, George Vanderheyden, being duly sworn, state that I am Vice President - Calvert Cliffs Nuclear Power Plant, Inc. (CCNPP), and that I am duly authorized to execute and file this License Amendment Request on behalf of CCNPP. To the best of my knowledge and belief, the statements contained in this document are true and correct. To the extent that these statements are not based on my personal knowledge, they are based upon information provided by other CCNPP employees and/o consultants. Such information has been reviewed in accordance with company practice and I believe it to-be reliable.

t-Subscribed and sworn before me a Notary U lic in and for the State of Maryland and County of ar

,this 7

day of (

,2005.

WITNESS mv Hand and Notarial Seal:

/

Notary Publi/

Date-My Commission Expires:

GV/GT/bjd

Attachment:

(1)

Mark cc:

J. Sebrosky, NRC R. V. Guzman, NRC S. J. Collins, NRC

.-up Technical Specification Page Resident Inspector, NRC R. I. McLean, DNR

ATTACHMENT (1)

MARK-UP TECHNICAL SPECIFICATION PAGE TS 3/4.2.1 Page 7 Calvert Cliffs Nuclear Power Plant, Inc.

June 7, 2005

314.2 DRY SHIELDED CANISTER (DSC) 3/4.2.1 DISSOLVED BORON CONCENTRATION LIMITING CONDITION FOR OPERATION 3.2.1.1 The DSC cavity shall be moderated only by water with a boron concentration greater than or.equal to 1 *6 ppm.

APPLICABILITY Applicable to all DSCs.

ACTION:

1.

With the measured boron concentration less than the specification prior to the beginning of DSC loading and unloading operations, suspend all activities involving DSC loading and unloading.

2.

With the measured boron concentration less than the specification during DSC loading and unloading operations, take action to increase boron concentration while. unloading fuel from the DSC.

SURVEILLANCE REQUIREMENTS ot 4.2.1.1 Within rpriorto insertion bf the first spent fuel assembly into a DSC, the dissolved boron concentration in water in the spent fuel pool and introduced. into the DSC cavity shall be independently determined by chemical analysis (two samples analyzed by two different individuals). The boron concentration in the water shall be reconfirmed at intervals not to exceed 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> until such time as the DSC is removed from the spent fuel pool. All boron concentration measurement shall be documented.

4.2.1.2 Within

' prior to flooding the DSC cavity for unloading' the fuel assemblies, the; dissolved boron concentration in water in the spent fuel pool and introduced into the DSC cavity shall be independently determined by chemical analysis (two samples analyzed by two different individuals). The boron concentration in the water shall be reconfirmed at intervals not to exceed 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> until such time as the fuel has been removed from the DSC. All boron concentration measurements shall be documented.

IPage 7 of 13 Amendment 3