Technical Specification (Ts), Revising TS 3.7.3 to Adopt NUREG-1431
ML051540080
Person / Time
Site: Callaway Ameren icon.png
Issue date: 05/31/2005
From: Brian Benney
NRC/NRR/DLPM/LPD4
To:
Benney B, NRR/DLPM, 415-3764
References
NUREG-1431, TAC MC5059
Download: ML051540080 (2)


Text

MFIVs and MFRVs and MFRV Bypass Valves l 3.7.3 3.7 PLANT SYSTEMS 3.7.3 Main Feedwater Isolation Valves (MFIVs) and Main Feedwater Regulating Valves (MFRVs) and Main Feedwater Regulating Valve Bypass Valves (MFRVBVs) I LCO 3.7.3 Four MFIVs, four MFRVs, and four MFRVBVs shall be OPERABLE. I APPLICABILITY: MODES 1, 2, and 3 except when:

a. MFIV is closed and de-activated; or
b. MFRV is closed and de-activated or closed and isolated by a closed manual valve; or
c. MFRVBV is closed and de-activated, or closed and isolated by a closed manual valve, or isolated by two closed manual valves.

ACTIONS

_ _ _----------- -NO r-Separate Condition entry is allowed for each valve.

__~~~ -- _ _------- ___

CONDITION REQUIRED ACTION TIME A. One or more MFIVs A.1 Close MFIV. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> I inoperable.

AND A.2 Verify MFIV is closed. Once per 7 days B. One or more MFRVs B.1 Close or isolate MFRV. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> I inoperable.

AND B.2 Verify MFRV is closed or Once per 7 days isolated.'

C. One or more MFRVBVs C.1 Close or isolate bypass 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable. valve.

AND C.2 Verify bypass valve is Once per 7 days closed or isolated.

(continued)

CALLAWAY PLANT 3.7-7 Amendment No. 167

MFIVs and MFRVs and MFRV Bypass Valves l 3.7.3 CONDITION REQUIRED ACTION COTIME D. Two valves in the same D.1 Isolate affected flow 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> flow path inoperable path.

E. Required Action and E.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> I associated Completion Time not met. AND E.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.3.1 ------NOTE-----------------

Only required to be performed in MODES 1 and 2.

Verify the closure time of each MFIV, MFRV and* In accordance with MFRVBV is < 15 seconds. the Inservice Testing Program SR 3.7.3.2 -- ---------NOTE ------------------

Only required to be performed in MODES 1 and 2.

Verify each MFIV, MFRV and MFRVBV actuates to 18 months I the isolation position on an actual or simulated actuation signal.

CALLAWAY PLANT 3.7-8 Amendment No. 167