ML051530149
| ML051530149 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 05/26/2005 |
| From: | Skaggs M Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| EA-02-026, EA-03-086 | |
| Download: ML051530149 (4) | |
Text
SAFEGUARDS INFORMATION WARNING:
UNAUTHORIZED DISCLOSURE ISSUBJECT TO ADS mSTRA7VE AND CRmhNAL. PENALTIES Tennessee Valley Authority. Post Office Box 2000, Decatur, Alabama 35609-2000 Mike D. Skaggs Vice President, Browns Ferry Nuclear Plant May 26, 2005 U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk 11555 Rockville Pike Rockville Maryland 20852 ICM B.5.b
Dear Gentlemen:
In the Matter of
)
Docket No.
50-259 Tennessee Valley Authority
)
50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) UNIT 1, 2, AND 3 -
RESPONSE
TO NRC GUIDANCE REGARDING MITIGATION STRATEGIES The NRC issued Orders For Interim Safeguards and Security Compensatory Measures ("order EA-02-026" or "1ICM Order")
dated February 25, 2002.
Order EA-02-026 imposed requirements on nuclear power plants licensed pursuant to the Atomic Energy Act of 1954 and Title 10 of the Code of Federal Regulations.
Section III.A of the Order required licensees to implement certain changes in physical security plans and safeguards contingency plans on an interim basis until final requirements were established.
Among other requirements, TVA submitted its response to Section II.B.5.b. of Order EA-02-026 on August 31, 2002.
Subsequently, the NRC issued Orders, dated April 29, 2003, Requiring Compliance with Revised Design Basis Threat for Operating Power Reactors ("Order EA-03-086" or "DBT Order")
and other security related Orders (collectively "Orders") for the [Nuclear Power Plant].
In many ways, Order EA-03-086 complemented or superseded requirements the interim measures imposed by Order EA-02-026.
REVIEWTD CAITO&
SAFEGUARDS INFORMATION CLAS. -Af SIFICATION DOES NOT APPLY TO TITLEg.e r,;y Fitly 5 1
THIS PAGE WHEN SEPARATED FR.OM ORGANIZATION L5 e-.r, c?.
p ATTACHMEN'TS NATE ON S
SAFEGUARDS INFORMATION DATE
,r Ped on rec Her o
SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission Page 2 May 26, 2005 As required by Order EA-03-086, the plans for BFN have been implemented.
Subsequently, TVA was requested to respond to the letter from Mr. J. E. Dyer, Director, Office of Nuclear Regulation, dated February 25, 2005, NRC Staff Guidance for Use in Achieving Satisfactory Compliance with February 25, 2002, Order Section B.5.b, (NRC B.5.b Guidance) by May 31, 2005, and to implement appropriate enhancement to current mitigation strategies by August 31, 2005.
Specifically, nuclear power plant licensees were requested by, Developing Mitigating Strategies/Guidance for Nuclear Power Plants to Respond to Loss of Large Areas of the Plant in Accordance with B.5.b of the February 25, 2002, Order (dated February 24, 2005) (NRC B.5.b Guidance), to the February 25, 2005, letter to review the Areas of Consideration delineated in Attachment A to that Enclosure and evaluate additional considerations for potential inclusion in the licensees' mitigating strategies that licensees deemed appropriate in accordance to Attachment B to that enclosure.
Subsequently, the Nuclear Energy Institute (NEI), in conjunction with the NEI Security Working Group, developed and issued guidance for licensee use (NEI Guidance) to assist licensees in responding to the February 25, 2005, letter.
As requested in the February 25, 2005, letter, TVA has reviewed the information in Attachments A and B in accordance with the NEI Guidance and is hereby submitting, as a Safeguards Information attachment to this letter (Enclosure 1), TVA's evaluation of the information the NRC provided. reflects the results of a comprehensive and thorough review of the guidance and describes the considerations that TVA either has already or intends to implement at BFN by August 31, 2005.
The primary guiding principles used in the conduct of this evaluation were (1) whether or not equipment and resources were "readily available," and (2) if equipment is readily available, can it be effectively utilized in a licensee's mitigating strategy.
SAFEGUARDS INFORMATION CLAS-SIFICATION DOES NOT APPLY TO THIS PAGE WHEN SEPARATED FROM SAFEGUARDS INFORMATION ATTACHMENTS.
SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission Page 3 May 26, 2005 TVA considered "readily available" to mean that the equipment or resources was already licensee owned, under contract, or part of an existing Memorandum of Understanding.
- Further, even if equipment and resources are readily available, U.S.
Nuclear Regulatory Commission the second criterion is to ensure that the equipment can be used in a mitigating strategy in an effective manner.
Even if the equipment is readily available, it is of no value if it cannot be effective in implementing the mitigating strategy.
In accordance with these principles, actions are being implemented to address the NRC B.5.b Guidance.
These actions are considered to be commitments for that purpose and will be managed in accordance with TVA's commitment management system. to this letter contains TVA's commitment to complete the actions regarding the implementation of the mitigative strategies to address NRC B.5.b Guidance.
If you have any questions, please telephone Mr. D. T. Langley at (256) 729-3612.
Sp ere g Mike D. Skag Enclosures See Page 4 SAFEGUARDS INFORMATION CLAS.
SIFICATION DOES NOT APPLY TO THIS PAGE WHEN SEPARATED FROM ATTACHMENTS.
SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission Page 4 May 26, 2005 cc
Enclosures:
(w/o)
(Via NRC Electronic Distribution Mr. J. E. Dyer, Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Mr. Stephen J. Cahill, Branch Chief U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-3415 NRC Senior Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, AL 35611-6970 Margaret Chernoff, Senior Project Manager U.S. Nuclear Regulatory Commission (MS 08G9)
One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Eva A. Brown, Project Manager U.S. Nuclear Regulatory Commission (MS 08G9)
One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 SAFEGUARDS INFORMATION CLAS.
SIFICATION DOES NOT APPLY TO THIS PAGE WHEN SEPARATED FROM SAFEGUARDS INFORMATION ATTACHMENTS.