David Jaffe - Agenda 3-31.doc Page 1 l David Jaffe - Agenda 3.31.doc Page 1 I STP7159A MEETING AGENDA Group/Meeting Name:
NRC Phone Call on IRE12 SG Inspections Leader:
Facilitator:
Recorder:
Steve Thomas Scott Head John Conly Meeting Location:
MOF N201 Thursday. March 31. 2005 2:00 pm
Purpose:
NRC Phone Call on IREI2 SG Inspections Desired Outcome:
- 2. Provide NRC inspection results for SG ID and plans for primary side inspection
- 3. Provide NRC schedule information
- 4. Establish time frame for any future communications AGENDA WHAT
~HOwNVWHO WHEN (content)
(process)
(minutes)
Introduce participants Statement S. Head 2 min Discuss desired outcomes and agenda Discussion S. Head 3 min Present information for SG 1A, SGIB, SG IC Discussion S. Thomas 10 min Present information for SG ID Discussion S. Thomas 20 min Discuss schedule information Discussion D. Rencurrel 2 min Discuss future communications Discussion S. Head 2 min
\\\\corp~dilta\\dcpt\\NUCUCaConly RE1r SG\\Agenda 3-31.doc AU.~aChE-nL 2
Photo 1
Photo 2 4, I
Photo 3
Photo 4 4
ptvtAiw I1
.JE~tuIII
Photo 5
Photo 6
Photo 7 IJ wZg
/
VI nlc&r9TN 4r/
-,P I.%,
Photo 8 la Iz "
1 J
...A/
'161-
- -..
/
4-..
K
4-----
-Stri
..
-..t...
/} '
Photo 9
Photo 10 K'
I-j; j\\
1)
'i(,
II)
Photo 11
South Texas Project 1RE12 Steam Generator Secondary Inspection Results
SIG History e S/G replacement
- Unit 1
- Unit 2 May 2000 Dec 2002 o Completed three operating cycles in Unit 1 since S/G replacement e Currently in second operating cycle for Unit 2 since S/Greplacement 2
1IREI 2 Planned SiG Work Scope a Normal S/G Management Program Scope
- Sludge lancing all four steam generators
- Post-lancing Foreign Object Search and Retrieval (FOSAR) all four steam generators
- No primary tube inspections (scheduled for 1 RE1 3)
- S/G 1 D feedring end cap removal, inspection, and FOSAR 3
SiG inspection Results m Small quantities of stainless steel Flexitallic spiral wound gasket material found in S/G's 1A, 1B, and 1C v Numerous feedwater heater (FWH) stabilizing cable wire fragments found in S/G 1D 4
SIG's IA, IB, and IC Results o Pieces of Flexitallic gasket material were found (photos 1-5) e Several pieces were located in peripheral locations in the tube bundle a All identified gasket pieces were successfully retrieved, except for one piece which crumbled when grabbed 5
- Post-retrieval video examination of the affected tubes did not identify any tube wear o Additional inspections The end caps of the feedrings for S/G's 1A, 1 B, and 1 C were removed to facilitate inspection and FOSAR A second video inspection of the tube bundle periphery is planned 6
Cause, Extent, Corrective Action
- Specific source of gasket material not identified
- Gasket damage occurs during installation and degradation soon after return to service
- Introduction of material is not believed to be an ongoing, age-related process
- Non-contained gaskets will be replaced with CGI-style when reworked
- Potential sources scheduled for 1 RE1 2 reworked with CGI-style gaskets
- Processes will be changed for future work 7
SIG ID Background S During 1 RE1 1 shutdown, feedwater (FW) regulating valve 1 D did not fully close o FWH tube stabilizing cable was found wrapped around the valve cage (photo 6) a Some pieces of cable missing due to closing the valve
- A single tube plug was discovered missing from FWH 1 1A outlet side o S/G 1 D only S/G affected 8
SIG ID Background (cont'd)
& Plug was recovered a Wire fragments were recovered from S/G 1 D feedring spray cans and sludge collector (photos 7-8)
- Potential fragments which may have entered S/G 1 D were determined to be bounded by an existing wear analysis 9
SIG ID Work Scope for IREI2 o Perform previously scheduled sludge lancing e Perform internal bundle inspections and FOSAR a Remove feedring end cap, inspect and clean 10
SIG ID Results f Pre-lancing video inspection revealed multiple wire fragments (photo 9)
- Repeated sludge lancing effectively moved most material to the annulus to facilitate removal (photo 10)
C In-bundle inspection results 11
SIG I D Results (cont'd) a Post-lancing video examination identified wear on hot leg tube C22 R86 (photos 11-12) o In accordance with decision tree based on established industry guidance, primary-side inspections are required 12
SIG I D Additional Work Scope o Primary NDE inspection
+Point 100% 5 tubes deep in peripheral region plus 20% buffer zone 6-1 0 tubes deep
- Full-length bobbin of 20% entire population (1 00% of critical region plus 20% buffer zone) a Comprehensive visual inspection of the tube bundle periphery 13
SIG I D Present Status o Top-of-tubesheet mapping and FOSAR ongoing o Successful location and retrieval of larger pieces e Mobilizing equipment and personnel to support primary-side NDE
- Feedring inspection pending 14
David Jaffe - TEXT.htm Page 1 David Jaffe - TEXT.htm Page 1 l Here's the real one with the attachments. ---- Original Message-----
From: Thomas, Steven Sent: Monday, April 04, 2005 1:00 PM To: 'jlt2@nrc.gov'; 'wdj@nrc.gov'; 'glg@nrc.gov' Cc: McBurnett, Mark; Head, Scott; Harrison, Albon
Subject:
STP Steam Generator 1D NDE Inspection Plan I am attaching the subject tubesheet plans. In words, the scope is: -20% of entire tube population, as planned. The "5 tubes deep' plan has been modified to focus on the critical high velocity areas of interest as follows: +Point 1161 tubes 100% tubes with gap velocities 8.5 fps (at least two tubes deep) 20% tubes with gap velocities 7. 8.5 fps buffer
+Point 702 tubes special interest Bobbin 791 tubes in center area +60 tube buffer/435 tubes at periphery +87 tube buffer Let me know if you have any questions. Steve Thomas At-t-.q nt 3
I
-#J1JU L.-VU cJe.td I LwI bL South Texas IREI1 ITGX D94 X 278 Special Interest Tube a 9 Plugged Tube
125 120 115 lie 105 10 95 go 85 so 75 70 65 60 55 so 45 49 35 30 25 20 15 1a 5
--- v--
--9--
_ __ X X
!x!
xx..x!
X... x
- -.-
- -*.X ix.
Xi i
.X
.X.
X
- X1..x.x.
Xxx xnx
- i. xix
.I ----
xi 125 120 1 15F lie 105 109 95 as 80 75 70 65 60 55 50 45 40 35 30 25 20 I5 le 5
155 150 145 140 135 130 125 120 115 110 105 100 95 90 85 80 75 70 65 60 55 50 46 40 35 30 25 20 15 1e 5
Wo.Iaw u. 0edC' Ow.pwvy tC-STMax 04104200 07:4803
I A-U M~UL Leg opeciai interest South Texas IREll TGX D94 X 424 Special Interest Tube 155 150 145 140 135 130 125 120 115 110 105 100 95 90 05 80 75 70 65 60 55 50 45 40 35 30 25 20 15 1e 5
L I
I I
I 1
I
_____ I._ _ I _ _ _ _ I I_
_ i __ _
_ _ t _____
I I
I I
I 125 120 115 110 105 le0 95 90 85 830 75 70 65
.. I..
- xx~x XX X
x X
.xx...
xxx 5xx;
.xxx Hx
.xx xx.
.xxx x
- x.
. ~.
.4 X-
- X XJ
!X*
xx 4
x
~~X.*..
X X.
...x X X:
125 120 115 lie 185 100 95 90 85 00 75 70 65 60 55 so 45 40 35 30 25 20 1s 1e 5
60 55 50 45-40 35 30 25 20 15 le 5
155 150 145 140 135 130 125 120 115 110 105 100 95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5
W~.~.1...F~od,1cCo."WanLLC.STMx 04004f2MO 07:47.,7
. ~,
L-IIJ L
%AN-UI U L-IC I Up) UI i uutbi:5ne t-ius t-coint i-irogram South Texas IRE1l TGX D94 8 956 Tube With 8.5 and Greater Flow I -
9 3 1, e I I r) 1 1 C: r y 'I 1111f.
B II ,, CJ
'i [:II I I ( I 'I II 1 --.
11 i,, !7. i; U.
.1 I,, t t I I O Z! '.'
a 9 Plugged Tube 155 150 145 140 135 130 125 120 115 110 105 100 95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 125 123 115 1113 105 100 95 Be 85 80 75 70 65 60 56 so 45 40 35 30 25 20 i5 10 S
I
_I, p i r p ~lP'.
f age8 8
B.
a8 8
O a I.
8 A -
3g8g
~
118.
-8
- lI 888 ags88g 88 11
-898 M
-8
-L a-I
- a Me f 88 8 6 8 8 8 8 8 8 8 8B g
8 11 8 8 8
a
.8.
8 8 8 88 a
0..
.7 j.
8 8 8
s 11 0888 S 8
.8.8.888 8
-8 8 8 a 8 a8 8a 8
8 8
8 8
8 8...
.8 8
t i 1 2 3 0 13 a~A~
A 8..50 15 4
13-3 2
2 1
1 o
M
(-;
CA A
V r
7A fr C
ca.
Ca.C.A 125 120 115 1lie 185 108 95 90 05 80 75 70 65 60 65 50 45 40 35 30 25 20 15 10 5
W*.&.ti.lmweElacciCmv.s.ny LLC. STU.. 04/04J26OD 07.40 11
I Q)A-U
-iOt Ot Uoia Leg boDDf t-'rogram South Texas 1RE11 TGX D94 P 435 PerIphery Tube El 87 20% Per ipIIer ' [iBt I e r ?.Ei F 791 Baffle Cutout Region U 6(0 2(%
r[t f I e Bit f (rI I
.on&-
A!
T rumba: With A901
'l l
a 9 Plugged Tube I 5 I ;M IAr I At t I I 8in I 11C I i I r.
C
- r.
aRX 75C 70 CrC r1e C.
C.X AFF A.
1 1.
7.
I.
I.
R 125 120 115 110 105 I00 95 90 as 8a 75 70 65 60 55 50 45 PPPP.PPPP P B.
l.
PP l
.. P -P
-P......L 1,pPP
.Pp PP P-PP P
P
.4 P
PF I
I
.PP P
.4.
.P.
I..pp PP P(4..
X I.
L.
.FFF
.FF FFFF r.u....L...
P~
pp ri 4
-P FF.
.F.
.F.FFFF
.F.
u P P L..F F.
F
.FF.
.FF.
PP L1.
7 r r1rF FF
~
FF FFFFF Fru FFFF F
FFFF FFF-FFFF F-FF FFFF
.F f
.F
.P1:PP
-FF FF F~FF 4.F1 F F~FF FFFF F~FF F~FF FFF F
.PP 155.150.14 140 13 13 12 12.1 1
0 0
5 9
5 f~
7
~
~
rr C
r m ~
.U C
V J
125 120 115 110 105 108 95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 30 25 20 15 10 5
20 15 10 5
W.%Klnha~ El-vi. Co.p.ny LIC ST M.J 0404,12005 07.48 42