Final QA, Form ES-201-1 for Exam Dates 01/31-02/07/2005
ML051510355
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 01/27/2005
From:
Florida Power & Light Energy Seabrook
To:
Operations Branch I
Conte R
References
Download: ML051510355 (1)


Text

ES-201 Examination Preparation Checklist Form ES-201-1 Date of Examination: $ I - 2/7/05 Examinations Developed by: Facility I NRC (circle one)

Target Chief Date' Task Description (Reference) Examiner's Initials

-180 1. Examination administration date confirmed (C.1.a; C.2.a and b)

-120 2. NRC examiners and facility contact assigned (C.1.d; C.2.e)

-120 3. Facility contact briefed on security and other requirements (C.2.c)

-120 4. Comrate notification letter sent (C.2.d)

~

I-901 IS. Reference rnatenal due (C.1.e; C.3 c; Attachment 2)]

-7 5 6. Integratedexamination outline(s) due, including Forms ES201-2. ES-201-3, ES-301-1, ES-301-2, ES-301-5, ES-D-l's, ES-401-1/2, ES-401-3, and ES401-4.as applicable (C.1.e and I;C.3.d)

-70 7. Examination outline(s) reviewed by NRC and feedback provided to facility licensee IC.2.h;C.3.e)

-45 8. Proposed examinations (including written, walk-through JPMs, and scenarios, as applicable), supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5. ES-301-6, and fS-401-6). and reference materials due (C.1 .e, f. g and h; C.3.d)

-30 9. Preliminary license applications (NRC Form 398s)due (C.1.l; C.2.g; ES-202)

10. Final license applications due and Form ES-201-4prepared (C.1.l; C.2.i; ES-202)

-14 1 1 . Examination approved by NRC supervisor for facility licensee review (C.2.h; C.3.0

~~

-14 12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g)

-7 13. Written examinations and operating tests approved by NRC supervisor (C.2.i; C.3.h)

-7 14. Final applications reviewed: examination approval and waiver letters sent (C.2.i; Attachment 4; ES-204)

-7 15. Proctoringlwrittenexam administration guidelines reviewed wth facility licensee (C.3.k)

-7 16. Approved scenarios, job performance measures, and questions distributed to NRC examiners (C.3.i)

Target dates are keyed to the examination date identified in the corporate notification letter.

They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.

[ ] Applies only to examinations prepared by the NRC.