Final QA, Form ES-201-1 for Exam Dates 01/31-02/07/2005
ML051510355
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 01/27/2005
From:
Florida Power & Light Energy Seabrook
To:
Operations Branch I
Conte R
References
Download: ML051510355 (1)


Text

ES-201 Examination Preparation Checklist Form ES-201-1 Date of Examination: $

I - 2/7/05 Examinations Developed by:

Facility I NRC (circle one)

Chief Examiner's Initials Target Date' Task Description (Reference)

1.

Examination administration date confirmed (C.1.a; C.2.a and b)

-180

-120

2.

NRC examiners and facility contact assigned (C.1.d; C.2.e)

-120

3.
4.

Facility contact briefed on security and other requirements (C.2.c)

Comrate notification letter sent (C.2.d)

-120

~

IS. Reference rnatenal due (C.1.e; C.3 c; Attachment 2)]

I-901

-7 5

6. Integrated examination outline(s) due, including Forms ES201-2. ES-201-3, ES-301-1, ES-301-2, ES-301-5, ES-D-l's, ES-401-1/2, ES-401-3, and ES401-4.

as applicable (C.1.e and I; C.3.d)

-70

7.

Examination outline(s) reviewed by NRC and feedback provided to facility licensee IC.2.h; C.3.e)

-45

8.

Proposed examinations (including written, walk-through JPMs, and scenarios, as applicable), supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5. ES-301-6, and fS-401-6). and reference materials due (C.1.e, f. g and h; C.3.d)

-30

9. Preliminary license applications (NRC Form 398s) due (C.1.l; C.2.g; ES-202)
10. Final license applications due and Form ES-201-4 prepared (C.1.l; C.2.i; ES-202)

-14

11. Examination approved by NRC supervisor for facility licensee review (C.2.h; C.3.0

~~

12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g)

-14

-7

13. Written examinations and operating tests approved by NRC supervisor (C.2.i; C.3.h)
14. Final applications reviewed: examination approval and waiver letters sent (C.2.i; Attachment 4; ES-204)

-7

15. Proctoringlwritten exam administration guidelines reviewed wth facility licensee (C.3.k)
16. Approved scenarios, job performance measures, and questions distributed to NRC examiners (C.3.i)

-7

-7 Target dates are keyed to the examination date identified in the corporate notification letter.

They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.

Applies only to examinations prepared by the NRC.

[ ]

ES-201, Page 24 of 27