Nuclear Management Company Page I of 3 E State Change History Initiate 0
by SHANNON, DAN AR Pre-Screen 4/11/2004 11:52:48 PM-OWTner (None)
Submit to Screening Team AR Screening Oue 4/12/2004 12:38:06 AM Owner PSNP CAP Admin Screening AR Screeni ue Update 4/1312004 10:36:32 0
AM by KR EEL. JULIE Owner LANGE, ED 8 Section 1 Activity Request Id:
Activity Type:
4d One Line
Description:
' Detailed
Description:
CAP Submit Date:
4/11/2004 11:52:48 PM SIG Nozzle Dam Installation Dose Exceeded Estimate 4/11/2004 11:52:48 PM - SHANNON, DAN:
During the Installation of the SIG nozzle dams for the U1R28 refueling outage, the dose received (4375 mrem) exceeded the estimate from Ihe pre-job ALARA review (2440 mrem).
4/13/2004 2:30:01 PM - ONESTI, CARL :
The original dose estimate from the ALARA review should be listed as 2880 mrem Instead of the 2440 mrem listed previously In this action Item. The extra dose also previously discussed
.for factors #1 2,4, and 5 should be 845 mremlnstead of 1035 mrem.
SHANNON, DAN 13 Initiator Department:
PR Radiation Protection PB ZN 411112004 11:14:30 PM Date/Time of Occurrence:
4/9/2004 3:14:30 PM Site-Identified System:
XX PB Initiator:
Date/Time of Discovery:
Identified By:
Equipment # (1 st):
Equipment # (2nd):
Equipment # (3rd):
Site/Unit:
Why did this occur?:
(None)
Equipment.Type(st):
(None)
(None)
Equipment Type (2nd):
(None)
(None)
Equipment Type (3rd):
(None)
Point Beach - Unit 1 4/11/2004 11:52:48 PM - SHANNON, DAN:
There were several contnbuting factors which caused the dose for this job to exceed the estimate. These factors Include but are not limited to: 1. Problems with use of bubble hood respirators, 2. Difficulties with Installation of the nozzle dams which caused extra lumps and more time spent on the platform than that expected (based on unit 2). 3. Removal and reinstallation of A S/G Hotleg nozzle dam due to not having an RCS vent path,:4. Delays caused by the need for additional personnel to perform Jumps, 5. Lack of a proper jum platform for the A S/G lumps.
The amount of extra dose received due to factor #3 was approximately 900 mrem.
e amount of extra dose due to factors #1, 2. 4, and 5 collectively totals the remainder (1'035 mrem).
Ad I Immediate Action Taken: 4/12/2004 12:38:06 AM - HARPER. RON:
None Recommendations:
4/11/2004 11:52:48 PM -SHANNON, DAN:
Engineering programs lead determine lessons learned with Input from Scientech and the RPt group and Implement these lessons prior to nozzle dam removal for unit 1 and the next refueling outage.
4 Notify Me During Eval?: N t SRO Review Required?:
N E Section 2 Operability Status:
NA £ Compensatory Actions:
N Basis for Operability:
4/12/2004 12:38:06 AM - HARPER, RON:
Not an equipment operability concem.
s Unplanned TSAC Entry: N V External Notification:
N.
8 Section 3 Screened?:
Y Significance Level: B http:/lenwsO2/tmtrack/tmtrack.dll?IssuePage&Template=viewbody&recordid=595052&ta...
4/13/2004
-Nuclear Management Company Page 2 of 3 INPO OE Reqd?:
N Potential MRFF?:
N 6 QAINuclear Oversight?:
N 0 Licensing Review?: N Good Catch/Well Doc'd?: NA E Section 4 Inappropriate Action:
Process:
(None)
Activity:
(None)
Human Error Type:
(None)
Human Pert Fall Mode: (None)
Equip Failure Mode:
(None)
Process Fall Mode:
(None)
Org/Mgt Failure Mode: (None), Group Causing Prob: (None)
Hot Buttons:
(None) e Section 5 CAP Admin:
LANGE. ED EJ Prescreener:
(None) i Project:
Corrective Actn Program (CAP) AR i State:
AR Screening Que i Activelinactive:
Active 0 Submitter:
SHANNON, DAN D
0 Owner:
LANGE, ED a w Last Modified Date:
4/13/2004 2:30:01 PM
.0 Last Modifier:
ONESTI, CARL EJ
- 0 Last State Change Date: 4/12/2004 12:38:06 AM
- 1) Last State Changer:
HARPER, RON A; Close Date:
NUTRK ID:
- of Children:
0
References:
Update:
Prescreen Comments:
Import Memo Field:
OPR Completed?:
N OLDACTIONNUM:
subjtsid:
0 originaLprojectjld:
32 original_IssueId:
055587 Site:
Point Beach Cartridge and Frame:
E Attachments and Parent/Child Links Erijncjip?! to CE013761: SG Nzzle-Dam Insallati Exceeded Estimate by KREIL, JULIE (4/13/2004 10:38:15 AM) etPrincipal to CE013762: SIG Nozzle Dam Installation Dose ExceededeEstimaLe by KREIL, JULIE (4113/200410:41:57 AM)
[i1 E Change History 413/2004 10:36:35 AM by KREIL, JULIE origina~lssuejd Changed From "To 055587 4113/2004 10:38:15 AM by KREIL, JULIE Last Modified Date Changed From 4113/2004 10:36:35 AM To 4113/2004 10:38:15 AM Attachment Added: Principal to CEO13761: S/G Nozzle Dam Installation Dose Exceeded Estimate 4/1312004 10:39:27 AM by KREIL, JULIE Last Modified Date Changed From 411312004 10:38:15 AM To 411312004 10:39:27 AM 4/13/2004 10:39:36 AM by KREIL, JULIE Last Modified Date Changed From 411312004 10:39:27 AM To 4/1312004 10:39:36 AM 4113/2004 10:41:57 AM by KREIL, JULIE http://enwsO2/tmtrack/tmtrack.dll?lssuePage&Template=viewbody&recordid=595052&ta...
4/13/2004
Nuclear Management Company Page 3 of 3 Last Modified Date Changed From 411312004 10:39:36 AM To 4113/2004 10:41:57 AM Attachment Added: Principal to CE013762: S/G Nozzle Dam Installation Dose Exceeded Estimate 4/1312004 2:30:01 PM by ONESTI, CARL Detailed Description Changed From '[Original Text]' To '[Appended:] The original dose estimate from the ALARA review should be listed as 2880 mrem Instead of the 2440 mrem listed previously In this action Item. The extra dose also previously discussed for factors l1, 2, 4, and 5 should be 845 mrem insteal...I' Last Modified Date Changed From 4/13/2004 10:41:57 AM To 4113/2004 2:30:01 PM Last Modifier Changed From KREIL, JULIE To ONESTI, CARL http://enwsO2/tmtrack/tmtrack.dll?lssuePage&Template=viewbodv&recordid=595052&ta...