Nuclear Management Company El State Change History Initiate AR Pre-Screen*
Submit to Screening Team AR Screening Que 0
41912004 11:16:22AM 0
4/912004 1:23:05PM by THOMAS, STU x Owner (None) v by STAtLER, CHARLES Owner PBNP CAP Admin il Section 1 Page 1 of 2 /
Activity Request Id:
Activity Type:
i One Une
Description:
- ) Detailed
Description:
CAP055527 CAP Submit Date:
4/9/2004 11:16:22 AM U1R28 Nozzle Dam Installation Supplied Breathing Air Problems 4/9/2004 11:16:22 AM - THOMAS, STU:
During Installation of Ul Nozzle dams on A and B SIG the following Breathing Air problems were encountered:
- 1. On the initial jump to B C/L SIG bowl the Scientech jumper experienced a loss of air. The Individual exited the bowl and was Immediately cut out of the bubble hood as expected. The Individual showed no signs of distress. The job was stopped until we could ascertain the cause of the loss of air. OCC was Informed that we would not restart the Job until we found the cause. Based on reports from the RP techs and the individual we determined the cause to be Insufficient air pressure and a pinched hose., I then authorized the job to restart.
- 2. An air line connection to the bubble hood became disconnected as a jumper was preparing to jump. The connection was remade up and again we stopped to determine why. The fitting was repeatedly challenged and then securely taped and then repeatedly challenged. This was repeated with all personnel In bubble hoods. The Individual then jumped the bowl and completed the task.
- 3. It was later determined that an Individual on the A side pinched their air hose under the temporary platform and cut the hose. They were not in the S/G. The personnel on the platform switched the hose to an undamaged hose.
4/11/2004 3:06:48 PM - THOMAS. STU:
Additional Information was received by me during a debrief at approximately 0300,4/10/2004:
- 2 above: The individual was Inside B S/G Cold leg when the air line became disconnected.
the RPT was unable to reconnect the fitting and they did cut this Individual out of the bubble hood.
- 3 above: The air line was partially cut by being pinched by the strong back. The hose was not leaking any air and the jumper never lost air to the bubble hood. Because the hose showed damage, the RP tech removed that hose and plugged the jumper Into another hose.
- 4. An additional Instance of an airline problem was relayed to me: A jumper's airline on A S/G became disconnected as the worker tried to enter the manway. The RP tech saw the connection hit the manway and disconnect. RP Immediately reconnected the airling and reconfigured it so It would not come In contact with the manway.
I am also attaching a statement made by Mark Peroutka. RP First Lli THOMAS, STU h Initiator Department:
Initiator DateMme of Discovery: 4/9/2004 10:47:25 AM DateMme of Occurrence:
Identified By:
Equipment # (1st):
Equipment # (2nd):
Equipment # (3rd):
Site[Unit:
Why did this occur?:
Site-Identified (None)
(None)
(None)
System:
Equipment Type (1st):
Equipment Type (2nd):
Equipment Type (3rd):
ne Supervisor.
PR Radiation Protec PB 4/9/2004 10:47:25 A RC PB (None)
(None)
(None)
Point Beach - Unit 1 4/9/2004 11:16:22 AM -THOMAS, STU:
Three unique failures due to equipment, worker practices and oversight tion l{1 V
Immediate Action Taken: 4/9/2004 1:23:05 PM - STALZER, CHARLES:
None indicated by the author.
Recommendations:
4/9/2004 11:16:22 AM - THOMAS, STU:
Perform an ACE on these events.
V Notify Me During Eval?: N El Section 2 R SRO Review Required?:
N http://enwsO2/tmtrack/tmtrack.dll?lssuePage&Template=viewbody&recordid=594696&tab...
4/12/2004
Nuclear Management Company Page 2 of 2 Basis for Operability:
419/2004 1:23:05 PM - STALZER, CHARLES:
The CAP is documenting challenges experienced in nozzle dam Installation and does not question plant equipment operability.
0 Unplanned TSAC Entry: N v) External Notification:
N E Section 3 Screened?:
Y 0 Significance Level: A.
N Potential MRFF?:
N v QA/Nuclear Oversight?: N 0 Licensing Review?: N Good CatchlWell Doc'd?: NA E Section 4 Inappropriate Action:
Process:
(None)
Activity:
(None)
Human Error Type:
(None)
Human Perf Fall Mode: (None)
Equip Failure Mode:
(None)
Process Fall Mode:
(None)
OrglMgt Failure Mode: (None) @ Group Causing Prob:
(None)
Hot Buttons:
(None)
E Notes/Comments Update to CAP 055527 by SHANNON, DAN (4112/2004 1:57:53 AM)
The following update to CAP 055527 is provided based on followup discussions on 4/12/04 with the RPT who was present on the 1A SIG platform providing coverage for the 1A SIG nozzle dam installation on 419104. These updates change the information provided in this CAP, the first update, and the attachment.
- 3 - Jumper on 1A S/G airline disconnected as worker tried to enter the SIG manway. RP tech saw the connection hit the manway and disconnect. The Jumper was only halfway into the S/G bowl but was pulled back and then the RPT Immediately reconnected the airline and reconfigured It so it would not come in contact with the manway.
- 4 - Jumper on 1A SIG damaged his airline when It became partially cut from being pinched by the strongback. Hose was leaking air, however, it was taped to control potential spread of contamination. The Jumper was asked by the RPT If his air was OK and he replied it was OK several times. After this jump, the damaged hose was only used on the platform with an extra emergency hose on standby. As additional jumps were made, the hoses were switched between the Jumper making the jump and those remaining on the platform.
E Attachments and Parent/Child Links Mark Peroutka air line memo.doc (20992 bytes) by THOMAS, STU (4/1112004 3:05:36 PM) 19 O Principal to RCE000253: U1R28 Nozzle Dam Installation Supplied Breathina Air Problems by PFAFF, SCOTT (4/12/2004 10:39:33 AM)
B Change History 411212004 10:37:50 AM by PFAFF, SCOTT Last Modified Date Changed From To........
System Changed From (None) To RC PS Screened? Changed From N To Y Last Modifier Changed From........ To...
Update Changed From...... To........
411212004 10:37:57 AM by PFAFF, SCOTT Last Modified Date Changed From
- ..... To.......
original_project id Changed From To originaljIssue Id Changed From.
To........
4112/200410:39:33 AM by PFAFF, SCOTT Attachment Added: Principal to RCE000253: U1 R28 Nozzle Dam Installation Supplied Breathing Air Problems Last Modified Date Changed From........ To........
http://enwsO2/tmtrackltmtrack.dll?IssuePage&Template=viewvbody&recordid=594696&tab...
4/12/2004
Mark Peroutka wrote the below statement and sent to Stu Thomas on 4/10/2004.
List of S/G Nozzle Dam Air Hose Problems I. Jumper on B S/G says he lost air while in SIG Bowl installing nozzle dam. RP tech responded calmly and swiftly by having the worker exit S1G. RP tech immediately cut the top of the bubble hood off and sent the worker out of the area (My personnel observation and the RP Tech on the platform is that the worker was winded, he seemed worked up long before he went on the platform. When he came out of the S/G his bubble hood was not fog up or collapsed and his airline was still connected.) All work was stopped until the situation could be assessed, once RP management and technicians evaluated the situation and came to an agreement work resumed.
- 2. Jumper on B S/G airline disconnected while in the S/G, RP tech responded calmly and swiftly by having the worker exit S/G. The worker was immediately cut out of his bubble hood and left the area. All work was stopped until the situation could be assessed, once RP management and technicians evaluated the situation and came to an agreement work resumed. All connection on Jumpers were aggressively challenged and found to be SAT.
- 3. Jumper on A S/G airline disconnected as worker tried to enter S/G manway. RP tech saw the connection hit the manway and disconnect. RP immediately reconnected the airline and reconfigured it so it would not come in contact with the manway.
- 4. Jumper on A S/G damaged is airline when it became partially cut from being pinched by the strong back. Hose was not leaking any air and the jumper never lost any air to his bubble hood, however tech did switched the jumper to a different airline just to be safe.
I. Nuclear Management Company El State Change History RCE Initiate Assign Work 0
4112/2004 10:39:29AM by PFAFF. SCOTT DOwner RUSSELL, PATRICK 1 Section 1 Page 1 of 1 Activity Request Id:
Activity Type:
Site/Unit:
{ One Line
Description:
Activity Requested:
RCE000253 Root Cause Evaluation Submit Date:
4/12/2004 10:39:29 AM Point Beach - Unit I U1 R28 Nozzle Dam Installation Supplied Breathing Air Problems Perform a Root Cause Evaluation of CAP In accordance with NMC RCE Manual. 30 DAY DUE DATE.
0 CATPR:
Initiator:
Per Managers Meeting of 4-12-04, Pat Russell, is the sponsor. This RCE requires CARB review once completed. Contact RCE Coordinator (SJNikolal) to schedule this review.
N 0 Mode Change Restraint:
(None)
THOMAS, STU Eg Initiator Department:
PR Radiation Protection PB Responsible Group Code: A Assessment PB Activity Supervisor:
RUSSELL, PATRICK 13 Section 2 Responsible Department:
Activity Performer:
Assessment (None)
Priority:
2 Due Date:
5/12/2004 Management Exception From PI?: N @ QOANuclear Oversight?: N
@ Licensing Review?:
N NRC Commitment?:
N
@ NRC Commitment Date:
i' Significance Level:
A 8 Section 3 Activity Completed:
Hot Buttons:
(None) 13 Section 4 QA Supervisor:
(None)
Licensing Supervisor:
(None)
- Root Causes & Contributing Causes:
0 0 Proposed Corrective Actlons,CA Focus: 0
- Compensatory or Interim Corrective Actions: 0 L Previous Similar Events:
0 i Safety Sign.,EOC,Maint. Rule Considerations: 0
- Operating Experience:
0
@ Effectiveness Review Plan:
0 1 Attachments and Parent/Child Links
'3Subtask from CAP055527: U1 R28 Nozzle Dam Installation Supplied Breathing Air Problems by PFAFF, SCOTT (4/12/2004 10:39:33 AM)
El Change History 4/12/2004 10:39:33 AM by PFAFF, SCOTT Last Modified Date Changed From........ To Attachment Added: Subtask from CAP055527: U1 R28 Nozzle Dam Installation Supplied Breathing Air Problems http://enwsO2/tmtrack/tmtrack.dll?IssuePage&Template=viewbody&recordid=595173&tab...